Filter interviews by
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
posted on 5 Apr 2024
I applied via Approached by Company and was interviewed before Apr 2023. There were 3 interview rounds.
Moisture content in sand can be calculated using the formula: Moisture content (%) = ((wet weight - dry weight) / dry weight) * 100
Collect a sample of sand and weigh it while wet (wet weight)
Dry the sample in an oven until it reaches a constant weight (dry weight)
Calculate the moisture content using the formula: ((wet weight - dry weight) / dry weight) * 100
For example, if the wet weight is 100g and the dry weight is 9...
I applied via Walk-in and was interviewed in Aug 2021. There was 1 interview round.
My favorite song is 'Bohemian Rhapsody' by Queen.
The song was released in 1975 and is a rock opera.
It has a unique structure, combining elements of rock, opera, and ballad.
The lyrics are poetic and thought-provoking, with themes of life, death, and self-reflection.
The song features intricate vocal harmonies and a wide range of musical styles.
It has become a timeless classic and is often regarded as one of the greatest
I applied via Company Website and was interviewed in Dec 2021. There were 2 interview rounds.
posted on 1 Dec 2024
I was interviewed in Nov 2024.
posted on 25 Apr 2022
I was interviewed in Jul 2021.
I applied via Naukri.com and was interviewed before Jan 2021. There were 2 interview rounds.
The question is about requirements for WPS PQR, piping, and tank RT.
WPS (Welding Procedure Specification) and PQR (Procedure Qualification Record) are required for welding processes.
Piping requirements include material selection, design, fabrication, installation, and testing.
Tank RT (Radiographic Testing) requirements involve inspecting welds and joints for defects using X-rays or gamma rays.
All of these requirements ...
posted on 11 Apr 2021
I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.
Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.
Identifying the required personnel for a project
Recruiting and hiring personnel
Training and orienting personnel to the project
Assigning roles and responsibilities to personnel
Managing personnel performance and productivity
Ensuring compliance with labor laws and regulations
Examples include mobilizing a construc...
Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.
Create a detailed project budget and stick to it
Track expenses regularly and adjust budget as needed
Identify and eliminate unnecessary expenses
Negotiate with vendors for better pricing
Implement cost-saving measures without compromising quality
Use project management tools to monitor expenses and progress
Reg...
Handling clients requires effective communication, understanding their needs, and providing timely solutions.
Listen actively to their concerns and requirements
Communicate clearly and professionally
Provide timely updates and solutions
Build a strong relationship based on trust and respect
Be proactive in identifying and addressing potential issues
Ensure customer satisfaction by going above and beyond expectations
Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.
Identify the need for manpower
Plan the recruitment process
Source and screen candidates
Conduct interviews and assessments
Select and hire candidates
Provide training and orientation
Deploy manpower to required locations
I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Assistant Engineer
93
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
84
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
73
salaries
| ₹0 L/yr - ₹0 L/yr |
Engineer
72
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
66
salaries
| ₹0 L/yr - ₹0 L/yr |
AECOM
L&T Energy Hydrocarbon
Apco Infratech
Saipem