posted on 22 Jun 2024
Experience interested work
Designing beams and columns involves determining the size, material, and layout to support the required loads.
Consider the type of structure and the loads it will bear
Calculate the required dimensions and reinforcement based on structural analysis
Select appropriate materials such as steel or concrete
Ensure proper connections and detailing for stability and safety
Limit state of serviceability refers to the condition where a structure is still functioning properly without any excessive deflection or deformation.
Limit state of serviceability ensures that a structure remains usable and safe for occupants.
It involves checking factors like deflection, vibration, cracking, and durability.
For example, a bridge should not deflect excessively under the weight of traffic to maintain serv...
I was interviewed in Dec 2024.
I applied via Walk-in and was interviewed before May 2021. There were 2 interview rounds.
CODAL provisions for concrete refer to the guidelines and regulations set by relevant authorities, while commands of software are the specific instructions or functions within a software program.
CODAL provisions for concrete include specifications for mix design, strength requirements, and durability standards.
Commands of software for site engineers may include functions for structural analysis, quantity takeoff, and p...
posted on 3 Jul 2024
I applied via Approached by Company and was interviewed in Jun 2024. There was 1 interview round.
The top diameter of a slump cone is typically 4 inches.
The top diameter of a slump cone is usually 4 inches.
The slump cone is used to measure the consistency of fresh concrete.
The top diameter of the slump cone affects the flow of the concrete mix.
A larger top diameter will result in a higher slump value.
Thermo-Mechanically Treated
TMT stands for Thermo-Mechanically Treated
TMT bars are commonly used in construction for reinforcement
The process involves heating the steel bars and then rapidly cooling them to increase their strength
I applied via Walk-in and was interviewed in Feb 2023. There were 3 interview rounds.
Metro project Ugrider casting
posted on 14 Apr 2023
I applied via Walk-in and was interviewed in Feb 2022. There were 3 interview rounds.
Mix design is the process of determining the proportions of ingredients to be used in concrete or asphalt.
Mix design ensures the desired strength and durability of the construction material.
It takes into account factors such as the type of aggregate, cement, water, and admixtures.
Mix design is used in various construction projects such as buildings, roads, bridges, and dams.
For example, a mix design for a high-rise bui...
Batching plant test of concrete is a process to ensure the quality of concrete before it is used in construction.
Batching plant test involves checking the strength, workability, and consistency of concrete.
Tests are conducted on samples of concrete taken from the batching plant.
Tests include slump test, compressive strength test, and water-cement ratio test.
Results of the tests are compared with the specifications to e...
based on 1 review
Rating in categories
Site Engineer
6
salaries
| ₹2.5 L/yr - ₹3.7 L/yr |
Civil Site Engineer
6
salaries
| ₹2.7 L/yr - ₹3.1 L/yr |
HR Executive
4
salaries
| ₹1.8 L/yr - ₹2.4 L/yr |
Senior Civil Site Engineer
4
salaries
| ₹3.5 L/yr - ₹4.2 L/yr |
Engineer
3
salaries
| ₹4.8 L/yr - ₹6.5 L/yr |
Larsen & Toubro Limited
Tata Projects
Shapoorji Pallonji Group
Punj Lloyd