Filter interviews by
posted on 5 Jun 2024
I applied via Referral and was interviewed in May 2024. There was 1 interview round.
Replace the condensing fan motor with a new one to fix the issue.
Disconnect power to the unit before starting any work.
Remove the old condensing fan motor by unscrewing it from the unit.
Install the new condensing fan motor by securely screwing it in place.
Reconnect power and test the unit to ensure the fan motor is working properly.
Top trending discussions
I applied via Company Website and was interviewed in May 2021. There was 1 interview round.
I applied via Campus Placement and was interviewed before May 2021. There were 3 interview rounds.
Aptitude/Technical test are combine and simple easy to crack.
I appeared for an interview before May 2021.
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
To manage production assembly line, one needs to focus on optimizing workflow, ensuring quality control, and maintaining equipment.
Create a detailed plan for the assembly line process
Ensure all equipment is functioning properly and maintained regularly
Implement quality control measures to catch defects early
Train and manage staff to ensure efficient workflow
Continuously monitor and analyze production data to identify a
The layout of assembly process involves arranging the workstations and equipment in a logical sequence to optimize efficiency.
Identify the sequence of operations required to assemble the product
Arrange the workstations and equipment in a logical order to minimize movement and transportation
Ensure that the layout allows for easy access to tools and materials
Consider the ergonomics of the workstations to minimize worker ...
CTQ refers to Critical to Quality while CTP refers to Critical to Process.
CTQ is a customer-focused metric that measures the quality of a product or service.
CTP is a process-focused metric that measures the critical steps in a process that affect the quality of the final product.
CTQ is used to identify customer requirements and ensure they are met.
CTP is used to identify critical process steps and ensure they are contr...
I applied via Campus Placement and was interviewed before Dec 2019. There were 6 interview rounds.
Production assembly line is a process of assembling parts to create a finished product in a systematic and efficient manner.
Production assembly lines are designed to increase efficiency and reduce costs.
Each worker is responsible for a specific task in the assembly process.
The assembly line is divided into different stations, each with its own set of tasks.
The finished product is inspected at the end of the line to ens...
I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.
based on 1 interview
Interview experience
Junior Engineer
946
salaries
| ₹2.4 L/yr - ₹4.7 L/yr |
Assistant Engineer
337
salaries
| ₹3 L/yr - ₹7.7 L/yr |
Diploma Trainee Engineer
224
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Engineer
220
salaries
| ₹3 L/yr - ₹8.7 L/yr |
Assistant Manager
185
salaries
| ₹7 L/yr - ₹18.6 L/yr |
Dell
HARMAN
Vivo
OPPO