Filter interviews by
I applied via Campus Placement and was interviewed in Jul 2023. There were 2 interview rounds.
A transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers are used to increase or decrease the voltage in electrical power applications.
They consist of two coils of wire, known as the primary and secondary windings, wrapped around a core made of ferromagnetic material.
Examples of transformers include power transformers used in elec...
The refrigerator cycle is a thermodynamic cycle that allows a refrigerator to remove heat from a low-temperature reservoir and transfer it to a high-temperature reservoir.
The cycle typically consists of four processes: compression, condensation, expansion, and evaporation.
During compression, the refrigerant gas is compressed, which increases its temperature and pressure.
In the condensation process, the hot refrigerant ...
Ohm's law states that the current flowing through a conductor is directly proportional to the voltage across it, and inversely proportional to the resistance of the conductor.
Ohm's law is represented by the formula V = I * R, where V is voltage, I is current, and R is resistance.
It helps in calculating the current, voltage, or resistance in a circuit when the other two values are known.
For example, if a circuit has a v...
Ohm's law formula states that the current flowing through a conductor is directly proportional to the voltage across it and inversely proportional to its resistance.
Ohm's law formula: V = I * R
V represents voltage in volts, I represents current in amperes, and R represents resistance in ohms
The formula can be rearranged to find current (I = V / R) or resistance (R = V / I)
Ohm's law is commonly used in electrical engine...
I applied via Campus Placement and was interviewed before May 2021. There were 3 interview rounds.
Aptitude/Technical test are combine and simple easy to crack.
I applied via Approached by Company and was interviewed before Oct 2022. There were 4 interview rounds.
The chiller market size refers to the total revenue generated by the sales of chillers in a specific region or globally.
The global chiller market size was valued at $8.5 billion in 2020 and is projected to reach $11.8 billion by 2025.
Factors such as increasing demand for cooling systems in commercial buildings, industrial applications, and data centers are driving the growth of the chiller market.
Key players in the chi...
IPLV stands for Integrated Part Load Value and is a measure of chiller efficiency under varying load conditions.
IPLV takes into account the chiller's efficiency at different operating capacities, providing a more accurate representation of overall efficiency.
It is calculated based on the chiller's performance at 100%, 75%, 50%, and 25% load conditions.
IPLV is commonly used in the HVAC industry to compare the energy eff...
I applied via Naukri.com
7QC tools, 6S, 4M, 3R, Poka Yoke, Kaizen, CAPPA, PPM, UPH, and cycle time are all important concepts in production engineering.
7QC tools are quality control tools used to identify and solve production problems.
6S is a methodology for workplace organization and standardization.
4M stands for Man, Machine, Material, and Method and is used to identify the root cause of production problems.
3R stands for Reduce, Reuse, and R...
I applied via Walk-in and was interviewed in Jul 2023. There were 3 interview rounds.
Production planning, manpower handling, machine toolset
I am a dedicated and experienced Production Engineer with a strong background in manufacturing processes and quality control.
Bachelor's degree in Mechanical Engineering
5+ years of experience in production engineering
Proficient in CAD software and manufacturing processes
Led a team to improve production efficiency by 20% in my previous role
As a Production Engineer, my role involves overseeing the manufacturing process, ensuring efficiency, quality, and safety.
Oversee the manufacturing process to ensure efficiency and quality
Identify and troubleshoot any issues that arise during production
Implement improvements to enhance productivity and reduce costs
Collaborate with other departments to optimize processes and meet production goals
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
I applied via Approached by Company and was interviewed before May 2023. There was 1 interview round.
Teamwork is essential for success in any organization. Collaborating with team members to achieve common goals is key.
Effective communication is crucial for successful teamwork
Assigning roles and responsibilities based on team members' strengths
Encouraging open dialogue and feedback among team members
Recognizing and celebrating team achievements
Resolving conflicts and addressing issues promptly
I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.
Production related issues can include equipment breakdowns, supply chain disruptions, and quality control problems.
Equipment breakdowns can cause delays and halt production entirely.
Supply chain disruptions can lead to shortages of raw materials or finished products.
Quality control problems can result in defective products and damage to the company's reputation.
Other issues may include inefficient processes, safety haz...
This question is asking me to respond quickly and without hesitation.
I understand the importance of quick thinking in a production engineering role
I will take a moment to gather my thoughts before responding
I will provide a clear and concise answer to the best of my ability
I applied via LinkedIn and was interviewed before Apr 2022. There were 3 interview rounds.
To manage production assembly line, one needs to focus on optimizing workflow, ensuring quality control, and maintaining equipment.
Create a detailed plan for the assembly line process
Ensure all equipment is functioning properly and maintained regularly
Implement quality control measures to catch defects early
Train and manage staff to ensure efficient workflow
Continuously monitor and analyze production data to identify a
The layout of assembly process involves arranging the workstations and equipment in a logical sequence to optimize efficiency.
Identify the sequence of operations required to assemble the product
Arrange the workstations and equipment in a logical order to minimize movement and transportation
Ensure that the layout allows for easy access to tools and materials
Consider the ergonomics of the workstations to minimize worker ...
CTQ refers to Critical to Quality while CTP refers to Critical to Process.
CTQ is a customer-focused metric that measures the quality of a product or service.
CTP is a process-focused metric that measures the critical steps in a process that affect the quality of the final product.
CTQ is used to identify customer requirements and ensure they are met.
CTP is used to identify critical process steps and ensure they are contr...
based on 1 interview
Interview experience
based on 3 reviews
Rating in categories
Junior Engineer
942
salaries
| ₹2.4 L/yr - ₹4.6 L/yr |
Assistant Engineer
335
salaries
| ₹3 L/yr - ₹7.7 L/yr |
Diploma Trainee Engineer
224
salaries
| ₹1.8 L/yr - ₹3.2 L/yr |
Engineer
219
salaries
| ₹3 L/yr - ₹8.9 L/yr |
Assistant Manager
184
salaries
| ₹7 L/yr - ₹18 L/yr |
Dell
HARMAN
Vivo
OPPO