Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Feb 2022. There were 2 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 2 interview rounds.
posted on 21 Jul 2024
Production planning control & procurement involves coordinating the production process with procurement activities to ensure timely and cost-effective supply of materials.
Developing a production plan based on demand forecasts and available resources
Coordinating with procurement team to ensure timely sourcing of materials
Monitoring production progress and adjusting plans as needed
Optimizing inventory levels to balance p...
Inventory control involves tracking parts at every stage, analyzing supplier capacity, and implementing efficient part tracking systems.
Implement a robust inventory management system to track parts at every stage of production.
Conduct capacity analysis for suppliers to ensure they can meet demand and make adjustments as needed.
Utilize barcode or RFID technology for efficient part tracking and real-time updates.
Regularl...
posted on 17 Feb 2025
Technical questions about experience
I was interviewed before Feb 2024.
Techinical related questioned are in the interview
A small discussion with automobile.
posted on 30 Jun 2022
I applied via Company Website and was interviewed in May 2022. There were 2 interview rounds.
Discussion as per my resume & experience field
I applied via Naukri.com and was interviewed in Sep 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Aug 2021. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing breakdowns and improving overall equipment efficiency.
It involves regular maintenance, cleaning, and inspection of equipment.
TPM also includes training employees to take better care of equipment and involve them in maintenance activities.
Example: Implementing TPM in a ...
Yes, I am proficient in Excel macros and have experience using them in PPC management.
I have created automated reports using Excel macros to streamline PPC campaign analysis.
I have used Excel macros to manipulate large sets of data for keyword research and bid management.
I am comfortable writing and editing VBA code to enhance the functionality of Excel macros.
posted on 4 Apr 2023
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
The root cause of burn marks can vary depending on the context, but common causes include heat exposure, electrical currents, chemical reactions, and friction.
Heat exposure: Direct contact with hot objects or surfaces can cause burn marks.
Electrical currents: Electric shocks or faulty electrical equipment can result in burn marks.
Chemical reactions: Contact with corrosive substances or strong acids can lead to burn mar...
Double ejection is used in injection molds to improve part ejection and reduce cycle time.
Double ejection helps in ejecting complex parts with undercuts or threads.
It reduces the risk of part damage during ejection.
By ejecting the part from both sides simultaneously, it speeds up the overall cycle time.
Double ejection can prevent the need for manual intervention in part removal.
It is commonly used in industries like au
based on 1 review
Rating in categories
Junior Engineer
58
salaries
| ₹2 L/yr - ₹4.1 L/yr |
Design Engineer
23
salaries
| ₹1.5 L/yr - ₹9.4 L/yr |
Short Term Trainee
23
salaries
| ₹1.2 L/yr - ₹2.4 L/yr |
Assistant Manager
22
salaries
| ₹5.5 L/yr - ₹8.1 L/yr |
Engineer
22
salaries
| ₹2.4 L/yr - ₹4.5 L/yr |
Faurecia
Lear Corporation
Adient
Magna International