To mitigate the cost impact of project delays, focus on improving efficiency, reducing waste, and optimizing resources.
Identify the root causes of the delays and address them promptly.
Implement project management tools and techniques to streamline processes and improve productivity.
Optimize resource allocation to ensure maximum utilization and minimize idle time.
Negotiate with suppliers and vendors for better pricing o...
The carpet area is the area within the walls of the apartment that can be carpeted, while the built-up area includes the carpet area plus the thickness of the walls.
Carpet area is the actual area where you can lay a carpet.
Built-up area includes the carpet area plus the thickness of the walls.
Carpet area is usually around 70-80% of the built-up area.
For example, if the built-up area is 1000 square feet, the carpet area
posted on 11 Dec 2023
The process of building survey involves several steps to assess the condition and suitability of a building.
Determine the purpose of the survey and the scope of work
Conduct a visual inspection of the building's exterior and interior
Identify any structural issues, such as cracks or signs of deterioration
Assess the building's systems, including electrical, plumbing, and HVAC
Evaluate the building's compliance with buildin...
Development length is the minimum length of reinforcement required to transfer the stress between the concrete and the reinforcement.
Development length is determined by factors such as the type of reinforcement, concrete strength, and bond strength.
It is necessary to ensure that the reinforcement bars are properly embedded in the concrete to provide structural integrity.
The development length can vary depending on the ...
Waterproofing of toilet area is essential to prevent water damage and maintain hygiene.
Waterproofing involves applying a waterproof membrane or coating to the walls, floors, and joints of the toilet area.
It helps to prevent water leakage, seepage, and dampness, which can lead to structural damage and mold growth.
Various materials like waterproofing membranes, sealants, and grouts are used for effective waterproofing.
Pr...
The circumstances of handing over the flat to Clint
The flat was handed over to Clint after completing all necessary paperwork
The condition of the flat was documented before handing it over to Clint
Keys and access cards were provided to Clint
Any outstanding payments or dues were settled before the handover
posted on 6 Apr 2024
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I applied via Walk-in and was interviewed in Oct 2023. There were 2 interview rounds.
Question about project
posted on 2 Mar 2024
posted on 16 Jun 2023
I applied via Walk-in and was interviewed in May 2023. There were 3 interview rounds.
posted on 21 Jun 2024
I applied via Company Website and was interviewed before Jun 2023. There were 2 interview rounds.
The process of Water Treatment Plant (W.T.P) involves various stages to purify water for consumption.
1. Coagulation: Adding chemicals to water to make particles clump together.
2. Sedimentation: Allowing the clumped particles to settle at the bottom.
3. Filtration: Passing water through filters to remove remaining particles.
4. Disinfection: Adding chlorine or other chemicals to kill bacteria and viruses.
5. Distribution: ...
Site Engineer
6
salaries
| ₹2 L/yr - ₹4.2 L/yr |
Civil Site Engineer
6
salaries
| ₹1.5 L/yr - ₹3.2 L/yr |
Civil Engineer
5
salaries
| ₹1.2 L/yr - ₹3.5 L/yr |
Accountant
4
salaries
| ₹1.5 L/yr - ₹3.5 L/yr |
Diploma Civil Engineer
4
salaries
| ₹2 L/yr - ₹3.3 L/yr |
Larsen & Toubro Limited
L&T Construction
Tata Projects
Megha Engineering & Infrastructures