I applied via Referral and was interviewed in Apr 2021. There were 4 interview rounds.
STP is a wastewater treatment plant that uses physical, chemical, and biological processes to remove pollutants from sewage.
STP receives sewage from households and industries through a network of underground pipes.
The sewage is screened to remove large objects and then sent to a grit chamber to remove sand and grit.
The sewage is then sent to a primary clarifier where solids settle to the bottom and are removed as sludg...
Transformer is an electrical device that transfers electrical energy between two or more circuits through electromagnetic induction.
Transformers work on the principle of electromagnetic induction.
They consist of two or more coils of wire called windings.
The primary winding is connected to the input voltage source, while the secondary winding is connected to the load.
When an alternating current flows through the primary...
DG sets safety and operation are crucial for uninterrupted power supply.
DG sets should be installed in a well-ventilated area to avoid carbon monoxide poisoning.
Regular maintenance and testing of DG sets are necessary to ensure their safe operation.
Proper grounding and earthing of DG sets are essential to prevent electrical hazards.
Emergency stop buttons and alarms should be installed to shut down the DG sets in case o...
I appeared for an interview in Feb 2025.
I applied via Job Portal and was interviewed in Nov 2024. There was 1 interview round.
Colliers India interview questions for popular designations
I applied via Walk-in and was interviewed in Jul 2024. There were 2 interview rounds.
Get interview-ready with Top Colliers India Interview Questions
I applied via Job Portal and was interviewed in May 2024. There was 1 interview round.
I appeared for an interview in Aug 2024.
I applied via Approached by Company and was interviewed in Jan 2024. There were 2 interview rounds.
Top trending discussions
Some of the top questions asked at the Colliers India interview -
The duration of Colliers India interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 70 interviews
Interview experience
based on 918 reviews
Rating in categories
Assistant Manager
237
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Engineer
145
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
133
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Project Manager
111
salaries
| ₹0 L/yr - ₹0 L/yr |
Manager
110
salaries
| ₹0 L/yr - ₹0 L/yr |
CBRE
JLL
Cushman & Wakefield
Knight Frank