i
Coforge
Filter interviews by
I applied via Walk-in and was interviewed in Aug 2024. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2022. There were 4 interview rounds.
Coding and theory question was there specially from collection framework.
Method overloading is creating multiple methods with the same name but different parameters. Method overriding is creating a new implementation of an existing method in a subclass.
Method overloading is used to provide different ways to call the same method with different parameters.
Method overriding is used to provide a new implementation of an existing method in a subclass.
Explicit wait is a type of wait in Selenium W...
Explanation of String Builder and String Buffer and how to reverse a string without them.
String Builder and String Buffer are classes in Java used for manipulating strings efficiently.
String Builder is not thread-safe while String Buffer is thread-safe.
To reverse a string without String Builder or String Buffer, we can use a loop to iterate through the string and append each character to a new string in reverse order.
E...
BDD cucumber code for login to an application
Create a feature file with scenario outline for login
Write step definitions for each step in the scenario outline
Use page object model to interact with login page elements
Use Given-When-Then format for each step
Example: Given user is on login page, When user enters valid credentials, Then user should be logged in
Top trending discussions
I applied via Referral and was interviewed before Jan 2022. There were 3 interview rounds.
English, math, logical, singing dancing no coding no technical
I applied via Naukri.com and was interviewed before Feb 2021. There were 2 interview rounds.
Test prioritization is the process of determining the order in which tests should be executed based on their importance and risk.
Tests are prioritized based on their impact on the system and the likelihood of failure.
Prioritization helps to ensure that critical defects are identified and fixed early in the testing process.
Factors such as business requirements, user expectations, and regulatory compliance are considered...
User Acceptance Testing (UAT) is the final phase of testing where end-users test the software to ensure it meets their requirements.
UAT is performed by end-users or business representatives
It is done in a real-world environment
The focus is on validating the software's functionality and usability
UAT is conducted after all other testing phases are completed
Defects found during UAT are reported and fixed before the softwa
Test cycle schedule is planned by considering project timelines, test objectives, resources, and risks.
Identify project timelines and milestones
Define test objectives and scope
Allocate resources and identify dependencies
Identify and prioritize risks
Create a detailed test plan and schedule
Review and adjust the schedule as needed
Defect Life Cycle is a process followed by testers to identify, report, and resolve defects in software.
Defect is identified and reported by tester
Defect is reviewed by development team
Defect is assigned to a developer for fixing
Defect is fixed by developer
Defect is retested by tester
Defect is closed if it passes retest, else reopened
Categories include New, Open, In Progress, Fixed, Reopened, Closed
I applied via Naukri.com and was interviewed in Apr 2024. There were 3 interview rounds.
Java basic codes eg: reverse the sentence of string, remove duplicate on string, descending order of array, second largest number of array,etc..
I applied via Naukri.com and was interviewed in May 2024. There were 3 interview rounds.
Java based and selenium
In the next 5 years, I envision leveraging emerging technologies to enhance test automation, improve efficiency, and drive continuous improvement in testing processes.
Implementing AI and machine learning in test automation to increase accuracy and speed
Exploring blockchain technology for secure test data management
Adopting IoT testing for connected devices
Enhancing performance testing capabilities for cloud-based appli...
I applied via Job Portal and was interviewed in Aug 2023. There were 3 interview rounds.
Mux block combines multiple signals into one, while merge block combines two signals into one in MATLAB.
Mux block is used to combine multiple signals into one output signal.
Merge block is used to combine two input signals into one output signal.
Mux block has multiple input ports, while merge block has two input ports.
Example: Mux block can be used to combine sensor data from multiple sources, while merge block can be u
posted on 12 Jan 2025
I applied via Referral and was interviewed before Jan 2024. There were 3 interview rounds.
30 question based on core java , math, logical reasoning
based on 4 reviews
Rating in categories
Senior Software Engineer
4.8k
salaries
| ₹6.4 L/yr - ₹25.2 L/yr |
Technical Analyst
2.5k
salaries
| ₹9.5 L/yr - ₹38.4 L/yr |
Software Engineer
2k
salaries
| ₹2.2 L/yr - ₹9.5 L/yr |
Senior Test Engineer
1.8k
salaries
| ₹4.7 L/yr - ₹19.5 L/yr |
Technology Specialist
1.2k
salaries
| ₹11.8 L/yr - ₹42 L/yr |
Capgemini
Cognizant
Accenture
Infosys