I applied via Referral and was interviewed in Nov 2023. There were 2 interview rounds.
Super elevation formula calculates the banking of a road for vehicles to safely navigate curves at high speeds.
Super elevation (e) = (v^2) / (g * R)
e = super elevation in %
v = design speed in m/s
g = acceleration due to gravity (9.81 m/s^2)
R = radius of curve in meters
A highway is a public road designed for high-speed travel by vehicles, typically connecting major cities or towns.
Highways are typically divided into lanes for traffic going in opposite directions
They often have limited access points, such as ramps or interchanges
Highways may have different speed limits depending on the location and type of road
They are designed to handle high volumes of traffic efficiently
Top trending discussions
posted on 14 Feb 2023
I applied via Company Website and was interviewed in Aug 2022. There were 3 interview rounds.
I have extensive experience in highway engineering, including project management and design.
Managed multiple highway construction projects, ensuring adherence to budget and timeline
Designed and implemented traffic control plans for major road construction projects
Conducted traffic impact studies to assess the effects of proposed developments on existing road networks
Collaborated with multidisciplinary teams to develop ...
posted on 21 Mar 2023
I applied via Walk-in and was interviewed before Mar 2022. There were 2 interview rounds.
Quantity of PQC can be calculated by multiplying area with thickness
PQC stands for Pavement Quality Concrete
Area is calculated by measuring length and width of the pavement
Thickness is usually 150 mm for highways
Quantity = Area x Thickness
Quantity of DBM can be calculated by using the formula: Volume of DBM = Area x Thickness
Calculate the area of the road surface to be covered with DBM
Determine the required thickness of the DBM layer
Multiply the area by the thickness to get the volume of DBM required
Consider the wastage factor while calculating the quantity of DBM
Use appropriate units of measurement for accuracy
posted on 23 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
posted on 17 Jan 2021
Haunches are provided in culverts to distribute the load from the superstructure to the foundation.
Haunches help in reducing the stress concentration at the corners of the culvert.
They provide additional support to the culvert walls and prevent cracking or failure.
Haunches improve the structural integrity of the culvert and increase its load-carrying capacity.
They help in maintaining the shape and alignment of the culv...
Staging refers to the process of dividing a construction project into smaller parts or stages.
Staging helps in better project management and reduces the risk of delays and cost overruns.
Types of staging include linear staging, concurrent staging, and phased staging.
Linear staging involves completing one section of the project before moving on to the next.
Concurrent staging involves working on multiple sections of the p...
posted on 25 Sep 2019
I was interviewed in Sep 2019.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Highway Design Engineer
12
salaries
| ₹3.5 L/yr - ₹7.8 L/yr |
CAD Engg
7
salaries
| ₹2.2 L/yr - ₹3.5 L/yr |
Assistant Highway Engineer
6
salaries
| ₹2 L/yr - ₹5.5 L/yr |
Assistant Structural Engineer
5
salaries
| ₹4 L/yr - ₹5.4 L/yr |
Structural Design Engineer
5
salaries
| ₹3.8 L/yr - ₹5.4 L/yr |
Larsen & Toubro Limited
TCS
Hindustan Construction Company
Shapoorji Pallonji Group