Reasoning questions
Coding test in any questions
The ratio of M-20 concrete is 1:1.5:3 (cement:sand:aggregate).
The ratio of M-20 concrete is 1:1.5:3, which means 1 part cement, 1.5 parts sand, and 3 parts aggregate.
This ratio is commonly used for construction of residential buildings, pavements, and small industrial structures.
Calculating the amount of steel required for a project involves determining the dimensions, quantity, and type of steel needed.
Determine the dimensions of the steel components needed for the project
Calculate the quantity of steel required based on the dimensions and specifications
Consider the type of steel needed for the project, such as mild steel, stainless steel, or high-strength steel
Use formulas or software tools ...
Top trending discussions
posted on 16 May 2024
Aptitude Test on basic Java questions
posted on 4 Jan 2025
Project Manager
6
salaries
| ₹11.5 L/yr - ₹18 L/yr |
Site Engineer
4
salaries
| ₹1.8 L/yr - ₹4.2 L/yr |
Project Engineer
3
salaries
| ₹3.5 L/yr - ₹5 L/yr |
e-Solutions
Deenanath Mangeshkar Hospital
Primus Global Technologies
Tradebulls