CBRE
Proud winner of ABECA 2024 - AmbitionBox Employee Choice Awards
Filter interviews by
I applied via Approached by Company and was interviewed in Apr 2024. There were 3 interview rounds.
Top trending discussions
posted on 13 Dec 2020
I applied via Referral and was interviewed in Nov 2020. There were 4 interview rounds.
I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.
Designed a new bridge using CAD software
Researched and implemented renewable energy sources on campus
Collaborated with classmates on a group project to improve campus sustainability
I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.
Internship at ABC Engineering Firm
Focused on project management and design
Hands-on experience gained
I applied via Naukri.com and was interviewed in Dec 2018. There were 3 interview rounds.
I have 5 years of experience in retail management, overseeing daily operations and leading a team of 15 employees.
Managed daily operations of a retail store
Led a team of 15 employees, providing training and guidance
Implemented strategies to increase sales and improve customer satisfaction
Handled inventory management and merchandising
Responsible for scheduling and performance evaluations
I am drawn to the company's commitment to employee development and growth opportunities.
I appreciate the company's focus on continuous learning and development
I value the opportunities for advancement within the organization
I admire the company culture and values that align with my own
I have had positive experiences with the company's products/services
I managed a project to implement a new customer relationship management system.
Led a team of 10 employees to successfully implement the CRM system
Created project timelines and milestones to ensure timely completion
Collaborated with IT department to customize the system to meet company's needs
My final year project was a research study on the impact of social media on consumer behavior.
Researched various social media platforms and their influence on consumer decision-making
Conducted surveys and interviews to gather data on consumer preferences and behaviors
Analyzed the data using statistical tools and presented findings in a comprehensive report
Suggested recommendations for businesses to leverage social medi
I applied via Recruitment Consultant and was interviewed before Jun 2020. There was 1 interview round.
I applied via Referral and was interviewed in Jan 2020. There were 3 interview rounds.
I applied via Approached by Company and was interviewed in May 2024. There was 1 interview round.
Plastering involves applying a layer of plaster to walls or ceilings to create a smooth surface.
Prepare the surface by cleaning and dampening it
Mix plaster with water to create a workable consistency
Apply the plaster using a trowel, starting from the top and working downwards
Smooth and level the plaster with a float or trowel
Allow the plaster to dry before applying additional coats or finishing touches
Slab casting process involves pouring molten metal into a mold to create a flat, rectangular slab.
Preparation of mold with proper dimensions and materials
Heating and melting of metal to liquid state
Pouring molten metal into the mold
Cooling and solidifying of the metal slab
Removing the slab from the mold for further processing
BBS (Behavior Based Safety) checks involve observing and evaluating behaviors to ensure safety protocols are being followed.
Observe workers performing tasks to ensure they are following safety procedures
Provide feedback and coaching to workers on safe behaviors
Document any unsafe behaviors or conditions observed
Conduct regular audits to monitor compliance with safety protocols
HVAC system stands for Heating, Ventilation, and Air Conditioning system, which is used to control the temperature, humidity, and air quality in a building.
HVAC system controls temperature, humidity, and air quality in a building
It includes components like furnaces, air conditioners, heat pumps, and ductwork
Regular maintenance is important to ensure efficient operation
HVAC systems can be centralized or decentralized
Exa...
I applied via Company Website and was interviewed before Jan 2023. There was 1 interview round.
Chiller efficiency is a measure of how well a chiller unit is able to cool a space while using the least amount of energy.
Chiller efficiency is typically measured by the Coefficient of Performance (COP), which is the ratio of cooling output to energy input.
Regular maintenance and cleaning of chiller components can improve efficiency.
Upgrading to a more energy-efficient chiller model can also increase efficiency.
Proper ...
Water cooled systems are generally more efficient than air cooled systems due to higher heat transfer capabilities.
Water has higher heat transfer capabilities compared to air
Water cooled systems can maintain more consistent temperatures
Water cooled systems are typically used in high performance applications such as data centers and industrial machinery
Duct velocity can be improved by increasing the fan speed or reducing the duct size.
Increase the fan speed to increase the air velocity in the duct.
Reduce the duct size to increase the air velocity.
Use dampers or adjustable louvers to control and optimize the airflow.
Ensure proper sealing of duct joints to minimize air leakage.
Consider using smooth and straight ducts to reduce friction and improve airflow.
Regularly cle...
The chiller system uses various types of gases for cooling purposes.
Common types of gases used in chiller systems include R-134a, R-410A, and ammonia.
R-134a is a hydrofluorocarbon (HFC) refrigerant commonly used in air conditioning systems.
R-410A is a blend of hydrofluorocarbons used as a replacement for older refrigerants.
Ammonia (NH3) is often used in industrial chiller systems due to its high cooling capacity.
Other ...
The VRF system capacity is determined based on the area's cooling and heating load requirements.
Calculate the total cooling load and heating load for the area
Consider factors such as insulation, windows, occupancy, and equipment
Select VRF system capacity based on the calculated load requirements
Consult with HVAC professionals for accurate sizing
based on 1 interview
Interview experience
based on 2 reviews
Rating in categories
Assistant Manager
1.6k
salaries
| ₹3.8 L/yr - ₹11 L/yr |
Facility Executive
633
salaries
| ₹2 L/yr - ₹6.3 L/yr |
Facility Manager
514
salaries
| ₹3.7 L/yr - ₹14.4 L/yr |
Assistant Facility Manager
507
salaries
| ₹3 L/yr - ₹11 L/yr |
Deputy Manager
496
salaries
| ₹4.5 L/yr - ₹13.5 L/yr |
JLL
NoBroker
Cushman & Wakefield
Colliers India