Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Nov 2023. There was 1 interview round.
I applied via Newspaper Ad and was interviewed in Feb 2024. There was 1 interview round.
90 mins, 3 coding questions
I managed reports in the system by creating templates, gathering data, analyzing trends, and presenting findings to stakeholders.
Created report templates to standardize format and content
Gathered data from various sources such as databases, spreadsheets, and software systems
Analyzed trends and patterns in the data to identify insights and opportunities
Presented findings to stakeholders through visualizations, charts, a
I applied via Campus Placement and was interviewed in Apr 2023. There were 5 interview rounds.
Aptitude questions and technical questions were asked.
Early birds vs night owls. gd topics were very general
Caterpillar Inc interview questions for popular designations
I applied via Campus Placement and was interviewed in Sep 2023. There were 3 interview rounds.
The test will be quite easy. They asked question about LCM&HCF,Train and pipe problems which is very important.
The topic is about EV and their evolutions in India.
Get interview-ready with Top Caterpillar Inc Interview Questions
Advanced Sql questions on window functions
I applied via campus placement at Rajiv Gandhi Proudyogiki Vishwavidyalaya (RGPV), Bhopal
I applied via Naukri.com and was interviewed in Oct 2023. There were 3 interview rounds.
Basic aptitude quesions
I have extensive experience working with telemetry systems in embedded software development.
Designed and implemented telemetry systems for monitoring and transmitting data in real-time
Utilized protocols like MQTT, CoAP, and HTTP for communication between embedded devices and servers
Integrated sensors and actuators to collect and transmit data for remote monitoring and control
Worked on optimizing telemetry data transmis...
I applied via campus placement at Vellore Institute of Technology (VIT) and was interviewed in Aug 2023. There were 5 interview rounds.
Based on CS fundamentals
Normal questions based on arrays and strings
No of candidates shortlisted after GD is not fixed it is based on performance.
Top trending discussions
Some of the top questions asked at the Caterpillar Inc interview -
The duration of Caterpillar Inc interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 140 interviews
Interview experience
based on 1.2k reviews
Rating in categories
Design Engineer
215
salaries
| ₹6.1 L/yr - ₹18.9 L/yr |
Software Engineer
187
salaries
| ₹7.1 L/yr - ₹29.1 L/yr |
Engineer
180
salaries
| ₹6.8 L/yr - ₹24 L/yr |
Senior Associate Engineer
172
salaries
| ₹7.2 L/yr - ₹22 L/yr |
Associate Engineer
154
salaries
| ₹4.2 L/yr - ₹17 L/yr |
Komatsu
Volvo Construction Equipment
Tata Hitachi Construction Machinery
Liebherr