Filter interviews by
I applied via Referral and was interviewed in Dec 2021. There were 6 interview rounds.
Top trending discussions
The number of pole 1km cabling required depends on the specific project requirements and design considerations.
The number of pole 1km cabling needed will depend on the distance to be covered and the spacing between poles.
Factors such as terrain, existing infrastructure, and local regulations will also impact the number of poles required.
For example, in a straight road with no obstacles, fewer poles may be needed compar...
The size of the pole base plate depends on the load requirements and soil conditions.
The size of the pole base plate should be determined by the structural engineer based on the load requirements of the pole.
The soil conditions at the site also play a crucial role in determining the size of the base plate.
Factors such as wind load, seismic activity, and the weight of the pole itself should be considered when determinin
Stay plate dimensions are typically specified by the engineer or designer based on the specific requirements of the structure.
Stay plate dimensions are determined based on the load and stress requirements of the structure.
The dimensions of stay plates can vary depending on the material used and the design specifications.
Stay plates are often designed to distribute loads and provide stability in structures such as bridg
Typically 1-3 months notice period is required before joining a new job.
Notice period is the time between accepting a job offer and starting the new job.
It allows the current employer time to find a replacement and for the employee to wrap up their work.
Notice periods can vary depending on company policy and the level of the position.
It is common for notice periods to be 1-3 months in duration.
Some companies may requir...
I applied via Walk-in and was interviewed in Jun 2023. There were 4 interview rounds.
How to Conduct a DIY HVAC Inspection
Make sure your thermostat is working properly. Start by checking your thermostat. ...
Shut off the power. ...
Remove debris from the external HVAC unit. ...
Clean and repair the fins. ...
Clear the area around the unit. ...
Level the HVAC unit. ...
Clean the evaporator coil. ...
Check the evaporator drain.
Effective communication. ...
Troubleshooting skills. ...
Customer service. ...
Time management. ...
Critical thinking. ...
Hand and power tool experience. ...
Mechanical skills.
Identifying maintenance risks, diagnosing faults, and repairing HVAC systems.
Perform regular inspections to identify potential maintenance risks on HVAC equipment.
Use diagnostic tools and techniques to identify electrical and mechanical faults in HVAC systems.
Clean and adjust HVAC components to ensure optimal performance.
Repair or replace faulty parts to restore functionality.
Examples: Identifying a refrigerant leak, d...
I applied via Approached by Company and was interviewed before Mar 2023. There was 1 interview round.
HVAC works by controlling the temperature, humidity, and air quality in a building through heating, ventilation, and air conditioning systems.
HVAC systems use a combination of heating, cooling, and ventilation to maintain a comfortable indoor environment.
Heating is typically provided by a furnace or boiler, while cooling is achieved through air conditioning units or heat pumps.
Ventilation involves the exchange of indoo...
I applied via Recruitment Consulltant and was interviewed before Aug 2021. There was 1 interview round.
I applied via Walk-in and was interviewed in Jun 2023. There were 6 interview rounds.
Planning is best way of working style and complete the job very quality work.
Construction manager discussion with start work .
Any work start before discussion with lovour and supervisor .
Group discussion is most important the work will be start the don't any problem
HVAC work involves installing, maintaining, and repairing heating, ventilation, and air conditioning systems. Compressors are a type of HVAC component that pressurizes refrigerant gas.
HVAC work includes installing, maintaining, and repairing heating, ventilation, and air conditioning systems
Compressors are a type of HVAC component that pressurizes refrigerant gas
There are different types of compressors used in HVAC sys...
The refrigeration cycle in HVAC and AC systems involves the process of absorbing heat from indoor air and releasing it outside.
Refrigerant absorbs heat from indoor air through the evaporator coil
The refrigerant is then compressed into a high-pressure, high-temperature gas in the compressor
The hot gas releases heat outside through the condenser coil
The refrigerant then expands and cools down in the expansion valve befor
I applied via Naukri.com and was interviewed in Jun 2023. There were 4 interview rounds.
Treated fresh unit equipment parts are components used in the treatment of fresh water in a unit.
Pumps
Filters
Valves
Chemical dosing systems
Control panels
Flow meters
TFA stands for Thin Film Antenna. It is a type of antenna that uses a thin film of conductive material to transmit and receive signals.
TFA works on the principle of using a thin film of conductive material as the antenna element.
The conductive film is usually made of materials like copper or gold.
The film is deposited on a substrate, which provides mechanical support and insulation.
TFA antennas are lightweight, flexibl...
Duct size can be calculated based on the required airflow, velocity, and friction loss.
Determine the required airflow for the space or system.
Calculate the velocity of the air based on the desired airflow and the cross-sectional area of the duct.
Consider the friction loss in the duct system due to fittings, bends, and length.
Use duct sizing charts or software to find the appropriate duct size based on the calculated ve...
AHU and chiller are essential components of HVAC systems.
AHU stands for Air Handling Unit and is responsible for circulating and conditioning air within a building.
Chiller is a machine that removes heat from a liquid via a vapor-compression or absorption refrigeration cycle.
AHU and chiller work together to provide cooled air to the building.
AHU takes in outside air, filters it, cools or heats it, and then distributes i...
Ventilation CFM is calculated by determining the volume of air to be exchanged per minute.
CFM stands for Cubic Feet per Minute.
To calculate ventilation CFM, you need to know the volume of the space and the desired air exchange rate.
The formula to calculate CFM is: CFM = (Volume of Space) x (Air Exchange Rate)
For example, if the volume of a room is 1000 cubic feet and the desired air exchange rate is 5 times per hour, t
The current CTC and expected CTC are financial aspects of the job that need to be discussed during the negotiation process.
Current CTC refers to the current salary or compensation package of the candidate.
Expected CTC refers to the salary or compensation package the candidate is looking for in the new role.
These figures are important for both the employer and the candidate to ensure alignment and avoid any misunderstan...
Exhaust CFM can be calculated by determining the air volume flow rate in cubic feet per minute.
Determine the area of the exhaust opening
Measure the velocity of the air being exhausted
Multiply the area by the velocity to get the air volume flow rate in cubic feet per minute
Duct size is determined by the gauge of the material used.
Duct size refers to the dimensions of the ductwork used in HVAC systems.
The gauge of the material refers to its thickness or weight.
Thicker gauge materials are used for larger duct sizes to ensure structural integrity.
Common gauges for ductwork range from 26 to 16, with lower numbers indicating thicker materials.
For example, a 16-gauge duct would be used for lar...
I applied via Naukri.com and was interviewed in Dec 2022. There were 2 interview rounds.
Yes, I am willing to work in remote locations.
I am adaptable and can work in different environments.
I am willing to travel and work in remote locations as required.
I have experience working in remote locations and understand the challenges that come with it.
I am able to work independently and can manage my time effectively.
I am committed to meeting project deadlines and delivering quality work, regardless of location.
Lead Engineer
166
salaries
| ₹9.3 L/yr - ₹32 L/yr |
Assistant Manager
153
salaries
| ₹6 L/yr - ₹18.5 L/yr |
Senior Leader Engineer
133
salaries
| ₹12.4 L/yr - ₹34 L/yr |
Senior Engineer
124
salaries
| ₹6 L/yr - ₹25 L/yr |
Manager
90
salaries
| ₹9.6 L/yr - ₹26 L/yr |
FedEx Express
DHL Express
Ups Logistics
Maersk