Buildmet Billing Engineer Interview Questions and Answers

Updated 16 Feb 2022

Buildmet Billing Engineer Interview Experiences

1 interview found

I applied via Referral and was interviewed before Feb 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Why are you looking for a change?
Round 3 - Technical 

(1 Question)

  • Q1. What you have done in planning and billing department.Have you know prw billing and client billing
  • Ans. 

    I have experience in planning and billing department. Familiar with PRW billing and client billing.

    • Managed project budgets and tracked expenses

    • Prepared invoices and ensured timely payment from clients

    • Used PRW billing software to generate bills and reports

    • Collaborated with project managers and clients to resolve billing discrepancies

    • Maintained accurate records of billing and financial transactions

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - You can join this company,but salary is too delay it's about 3 month or more

Interview questions from similar companies

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. How do you make RMC reconciliation?
  • Ans. 

    RMC reconciliation involves comparing the quantity of materials ordered with the quantity used in construction to ensure accuracy.

    • Collect all the data related to RMC (Ready Mix Concrete) orders and deliveries.

    • Compare the quantity of RMC ordered with the quantity actually used in construction.

    • Identify any discrepancies and investigate the reasons behind them.

    • Adjust the records accordingly to ensure accurate billing and

  • Answered by AI
  • Q2. How to calculate bbs ?
  • Ans. 

    BBS (Bar Bending Schedule) is calculated by determining the quantity of steel reinforcement required for a particular concrete structure.

    • Calculate the total length of bars required for each diameter and type of reinforcement.

    • Determine the number of bars required for each diameter and type of reinforcement.

    • Calculate the total weight of bars required for each diameter and type of reinforcement.

    • Prepare a detailed schedule...

  • Answered by AI
  • Q3. How to check paint measurements?
  • Ans. 

    Paint measurements can be checked using a paint thickness gauge to ensure compliance with specifications.

    • Use a paint thickness gauge to measure the thickness of the paint layer.

    • Compare the measured thickness with the specified thickness in the project specifications.

    • Ensure that the paint thickness is uniform across the surface.

    • Repeat the measurements at multiple points to ensure accuracy.

    • Adjust the paint application if...

  • Answered by AI
  • Q4. How do you find extra items for WO amendment?
  • Ans. 

    Extra items for WO amendment can be found by reviewing project specifications, consulting with stakeholders, conducting site visits, and analyzing previous change orders.

    • Review project specifications for any missed items or changes

    • Consult with stakeholders such as architects, engineers, and contractors for input

    • Conduct site visits to identify any additional work required

    • Analyze previous change orders to see if any item

  • Answered by AI
  • Q5. How do you ConsiderJMR is right or wrong?
  • Ans. 

    Consider JMR based on project specifications, quantities, rates, and market conditions.

    • Review project specifications to ensure accurate billing

    • Verify quantities of materials and work done

    • Check rates for labor, materials, and equipment

    • Consider market conditions for pricing accuracy

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For billing engineer interview you should practice of bbs and procedures of billing and backup required for billing process!
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and benefits
Round 3 - One-on-one 

(4 Questions)

  • Q1. About my key activity and responsibility
  • Q2. Process of variation
  • Ans. 

    Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.

    • Variations are changes to the original scope, cost, or schedule of a project

    • Variations must be documented and approved by the relevant parties

    • The impact of variations on project budget and timeline must be analyzed

    • Examples of variations include design changes, unforeseen site conditions, and client requests

  • Answered by AI
  • Q3. Details about TDS
  • Q4. Details about NS items

Interview Preparation Tips

Topics to prepare for The Louis Berger Group Billing Engineer interview:
  • Contact
  • Running bill
  • Escalations
  • Variation
  • Ns items
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before May 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. How do you make RMC reconciliation?
  • Ans. 

    RMC reconciliation involves comparing the quantity of materials ordered with the quantity used in construction to ensure accuracy.

    • Collect all the data related to RMC (Ready Mix Concrete) orders and deliveries.

    • Compare the quantity of RMC ordered with the quantity actually used in construction.

    • Identify any discrepancies and investigate the reasons behind them.

    • Adjust the records accordingly to ensure accurate billing and

  • Answered by AI
  • Q2. How to calculate bbs ?
  • Ans. 

    BBS (Bar Bending Schedule) is calculated by determining the quantity of steel reinforcement required for a particular concrete structure.

    • Calculate the total length of bars required for each diameter and type of reinforcement.

    • Determine the number of bars required for each diameter and type of reinforcement.

    • Calculate the total weight of bars required for each diameter and type of reinforcement.

    • Prepare a detailed schedule...

  • Answered by AI
  • Q3. How to check paint measurements?
  • Ans. 

    Paint measurements can be checked using a paint thickness gauge to ensure compliance with specifications.

    • Use a paint thickness gauge to measure the thickness of the paint layer.

    • Compare the measured thickness with the specified thickness in the project specifications.

    • Ensure that the paint thickness is uniform across the surface.

    • Repeat the measurements at multiple points to ensure accuracy.

    • Adjust the paint application if...

  • Answered by AI
  • Q4. How do you find extra items for WO amendment?
  • Ans. 

    Extra items for WO amendment can be found by reviewing project specifications, consulting with stakeholders, conducting site visits, and analyzing previous change orders.

    • Review project specifications for any missed items or changes

    • Consult with stakeholders such as architects, engineers, and contractors for input

    • Conduct site visits to identify any additional work required

    • Analyze previous change orders to see if any item

  • Answered by AI
  • Q5. How do you ConsiderJMR is right or wrong?
  • Ans. 

    Consider JMR based on project specifications, quantities, rates, and market conditions.

    • Review project specifications to ensure accurate billing

    • Verify quantities of materials and work done

    • Check rates for labor, materials, and equipment

    • Consider market conditions for pricing accuracy

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - For billing engineer interview you should practice of bbs and procedures of billing and backup required for billing process!
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. About salary and benefits
Round 3 - One-on-one 

(4 Questions)

  • Q1. About my key activity and responsibility
  • Q2. Process of variation
  • Ans. 

    Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.

    • Variations are changes to the original scope, cost, or schedule of a project

    • Variations must be documented and approved by the relevant parties

    • The impact of variations on project budget and timeline must be analyzed

    • Examples of variations include design changes, unforeseen site conditions, and client requests

  • Answered by AI
  • Q3. Details about TDS
  • Q4. Details about NS items

Interview Preparation Tips

Topics to prepare for The Louis Berger Group Billing Engineer interview:
  • Contact
  • Running bill
  • Escalations
  • Variation
  • Ns items

Buildmet Interview FAQs

How many rounds are there in Buildmet Billing Engineer interview?
Buildmet interview process usually has 3 rounds. The most common rounds in the Buildmet interview process are Resume Shortlist, HR and Technical.

Tell us how to improve this page.

Buildmet Billing Engineer Salary
based on 5 salaries
₹4.8 L/yr - ₹6.5 L/yr
18% more than the average Billing Engineer Salary in India
View more details

Buildmet Billing Engineer Reviews and Ratings

based on 1 review

4.0/5

Rating in categories

3.0

Skill development

3.0

Work-life balance

3.0

Salary

5.0

Job security

3.0

Company culture

3.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
9 salaries
unlock blur

₹2 L/yr - ₹4 L/yr

Senior Purchase Executive
6 salaries
unlock blur

₹2.5 L/yr - ₹4.6 L/yr

Junior Engineer Civil
6 salaries
unlock blur

₹2 L/yr - ₹5.5 L/yr

Assistant Engineer
5 salaries
unlock blur

₹3 L/yr - ₹4.4 L/yr

Billing Engineer
5 salaries
unlock blur

₹4.8 L/yr - ₹6.5 L/yr

Explore more salaries
Compare Buildmet with

Lea Associates South Asia

4.3
Compare

McNally Bharat Engineering

4.1
Compare

ABCI Infrastructures

3.5
Compare

R.V.R. PROJECTS

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview