Upload Button Icon Add office photos

Filter interviews by

Brij Gopal Construction Company Interview Questions and Answers

Updated 12 May 2025
Popular Designations

11 Interview questions

An Assistant Billing Engineer was asked
Q. What is the compressive strength of first-class brick?
Ans. 

The strength of 1st class brick is its high compressive strength and durability.

  • 1st class bricks have a minimum crushing strength of 105 kg/cm2.

  • They are made of high-quality clay which is fired at high temperatures to increase strength.

  • These bricks are used in load-bearing structures like walls and foundations.

  • 1st class bricks are durable and resistant to weathering and erosion.

View all Assistant Billing Engineer interview questions
A HR & Administration Officer was asked
Q. What is documentation?
Ans. 

Documentation is the process of recording information in a systematic and organized manner.

  • It involves creating, storing, and retrieving documents.

  • Documentation can be in the form of written, electronic, or visual records.

  • Examples of documentation include contracts, reports, manuals, and policies.

  • Documentation is important for legal, regulatory, and organizational purposes.

  • It helps in maintaining consistency, accu...

View all HR & Administration Officer interview questions
A HR & Administration Officer was asked
Q. What is your expected CTC?
Ans. 

My expected CTC is in line with industry standards and commensurate with my experience and skills.

  • I have researched the market and have a good understanding of the salary range for this position.

  • I am open to negotiation based on the overall compensation package offered.

  • My previous salary was in the range of X to Y, and I am looking for a similar or higher package.

  • I am also interested in other benefits such as heal...

View all HR & Administration Officer interview questions
A Desktop Support Engineer was asked
Q. What is a DHCP server?
Ans. 

DHCP server assigns IP addresses to devices on a network automatically.

  • DHCP stands for Dynamic Host Configuration Protocol.

  • It eliminates the need for manual IP address configuration.

  • DHCP server assigns IP addresses, subnet masks, default gateways, and DNS servers to devices.

  • DHCP lease time determines how long a device can use an assigned IP address.

  • DHCP server can be configured on a router, server, or dedicated ap...

View all Desktop Support Engineer interview questions
A Desktop Support Engineer was asked
Q. What is the full form of RJ45?
Ans. 

RJ45 stands for Registered Jack 45, a type of connector used for Ethernet networking.

  • RJ45 is a type of connector used for Ethernet networking.

  • It has 8 pins and is used to connect devices to a network.

  • RJ45 is commonly used in homes, offices, and data centers.

  • Examples of devices that use RJ45 connectors include computers, routers, and switches.

View all Desktop Support Engineer interview questions
A Deputy Project Manager was asked
Q. How do you start a project?
Ans. 

Starting a project involves defining goals, creating a plan, assembling a team, and securing resources.

  • Define project goals and objectives

  • Create a project plan with timelines and milestones

  • Assemble a team with the necessary skills and expertise

  • Secure resources such as funding, equipment, and materials

  • Establish communication channels and protocols

  • Identify potential risks and develop contingency plans

  • Monitor progres...

View all Deputy Project Manager interview questions
A Senior QA QC Engineer was asked
Q. What are QAM and QAP?
Ans. 

QAM stands for Quality Assurance Manual and QAP stands for Quality Assurance Plan.

  • QAM is a document that outlines the quality policies and procedures of an organization.

  • QAP is a document that outlines the specific quality control activities that will be performed on a project.

  • QAM is a high-level document that provides an overview of the organization's quality management system.

  • QAP is a more detailed document that ...

View all Senior QA QC Engineer interview questions
Are these interview questions helpful?
A Senior QA QC Engineer was asked
Q. Different between QA/QC and Specific Gravity and Density
Ans. 

QA/QC is a process of ensuring quality of a product or service, while specific gravity and density are physical properties of a substance.

  • QA/QC involves testing and inspection to ensure quality standards are met

  • Specific gravity is the ratio of a substance's density to the density of a reference substance

  • Density is the mass per unit volume of a substance

  • QA/QC is a process, while specific gravity and density are pro...

View all Senior QA QC Engineer interview questions
An Erection and Commissioning Manager was asked 11mo ago
Q. Process of all wtp structure
Ans. 

The process of all water treatment plant structures involves designing, constructing, installing, and testing various components to ensure efficient water treatment.

  • Designing the layout of the water treatment plant structures

  • Constructing the physical structures such as tanks, pipelines, and treatment units

  • Installing equipment like pumps, filters, and chemical dosing systems

  • Testing the functionality of each structu...

View all Erection and Commissioning Manager interview questions
An Erection and Commissioning Manager was asked 11mo ago
Q. Detail of every structure of wtp
Ans. 

The structures of a water treatment plant (WTP) include intake structures, treatment units, settling tanks, filters, disinfection units, and storage tanks.

  • Intake structures: where water is taken from the source (e.g. river, lake)

  • Treatment units: where physical, chemical, and biological processes are used to remove impurities

  • Settling tanks: where solids settle out of the water

  • Filters: where remaining impurities are...

View all Erection and Commissioning Manager interview questions

Brij Gopal Construction Company Interview Experiences

16 interviews found

Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(2 Questions)

  • Q1. Process of all wtp structure
  • Ans. 

    The process of all water treatment plant structures involves designing, constructing, installing, and testing various components to ensure efficient water treatment.

    • Designing the layout of the water treatment plant structures

    • Constructing the physical structures such as tanks, pipelines, and treatment units

    • Installing equipment like pumps, filters, and chemical dosing systems

    • Testing the functionality of each structure an...

  • Answered by AI
  • Q2. Detail of every structure of wtp
  • Ans. 

    The structures of a water treatment plant (WTP) include intake structures, treatment units, settling tanks, filters, disinfection units, and storage tanks.

    • Intake structures: where water is taken from the source (e.g. river, lake)

    • Treatment units: where physical, chemical, and biological processes are used to remove impurities

    • Settling tanks: where solids settle out of the water

    • Filters: where remaining impurities are remo...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Here salary is one month delay

Civil Site Engineer Interview Questions & Answers

user image Nitish Sharma

posted on 12 Sep 2024

Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-
Round 1 - HR 

(2 Questions)

  • Q1. Just experience
  • Q2. Expain my previous work
  • Ans. 

    I have worked on various civil engineering projects, including site planning, design, and construction management.

    • Managed site planning and layout for commercial and residential projects

    • Designed stormwater management systems and erosion control measures

    • Coordinated with contractors and subcontractors to ensure project deadlines were met

    • Performed quality control inspections and resolved any issues that arose during const...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Its all depend with the team culture and management bcoz if team is good nothing can stop 🛑 if PPL working with you sure that you also a team member then only y travel journey is smooths otherwise and it's also depends on your attitude also
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview before May 2024, where I was asked the following questions.

  • Q1. Discuss about your experience first.
  • Ans. 

    I have over 15 years of experience in IT leadership, driving digital transformation and optimizing technology strategies for organizations.

    • Led a team of 50+ IT professionals in a major cloud migration project, resulting in a 30% reduction in operational costs.

    • Implemented a cybersecurity framework that decreased security incidents by 40% within the first year.

    • Spearheaded the development of a data analytics platform that...

  • Answered by AI
  • Q2. They required key skill is most important in that organization.
Interview experience
1
Bad
Difficulty level
-
Process Duration
-
Result
-

I applied via Recruitment Consulltant

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Be truthful in your resume. It is very easy to catch false or lies during the interview by asking basic questions.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Lsections ,fobs& building drawings
Round 3 - Group Discussion 

Give any topic and some time to read this topic...

Assistant Billing Engineer Interview Questions & Answers

user image нєαят вєαт

posted on 18 Jul 2023

Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Do not use an unprofessional email address such as cool_boy@email.com. It shows a lack of professionalism by the candidate.
View all tips
Round 2 - HR 

(1 Question)

  • Q1. Where are you working now?
Round 3 - Technical 

(1 Question)

  • Q1. What is the strength of 1st class brick??
  • Ans. 

    The strength of 1st class brick is its high compressive strength and durability.

    • 1st class bricks have a minimum crushing strength of 105 kg/cm2.

    • They are made of high-quality clay which is fired at high temperatures to increase strength.

    • These bricks are used in load-bearing structures like walls and foundations.

    • 1st class bricks are durable and resistant to weathering and erosion.

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Share Your CV to companies & learn about technical thing.

Civil Engineer Interview Questions & Answers

user image нєαят вєαт

posted on 9 Apr 2025

Interview experience
1
Bad
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview before Apr 2024, where I was asked the following questions.

  • Q1. Tell about yourself
  • Q2. Tell your previous experience
  • Ans. 

    I have extensive experience in civil engineering, focusing on project management, design, and site supervision.

    • Worked on a major highway expansion project, overseeing the design and implementation phases.

    • Managed a team of engineers and technicians during the construction of a multi-story commercial building.

    • Conducted site inspections and ensured compliance with safety regulations and quality standards.

    • Collaborated with...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Prefer not to Join this company.

I applied via Referral and was interviewed in Sep 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. What is full form of RJ45?
  • Q2. What is dhcp server?
  • Ans. 

    DHCP server assigns IP addresses to devices on a network automatically.

    • DHCP stands for Dynamic Host Configuration Protocol.

    • It eliminates the need for manual IP address configuration.

    • DHCP server assigns IP addresses, subnet masks, default gateways, and DNS servers to devices.

    • DHCP lease time determines how long a device can use an assigned IP address.

    • DHCP server can be configured on a router, server, or dedicated applian...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Don't join this company as IT supports.
They don't give facility as they talked while joining this company.

Skills evaluated in this interview

I applied via Walk-in and was interviewed in Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Group Discussion 

About your self , Education and work experience

Round 3 - Technical 

(2 Questions)

  • Q1. How to start any project ?
  • Ans. 

    Starting a project involves defining goals, creating a plan, assembling a team, and securing resources.

    • Define project goals and objectives

    • Create a project plan with timelines and milestones

    • Assemble a team with the necessary skills and expertise

    • Secure resources such as funding, equipment, and materials

    • Establish communication channels and protocols

    • Identify potential risks and develop contingency plans

    • Monitor progress and...

  • Answered by AI
  • Q2. About IS codes ,Productivity of Manpower ,Machinery and how to increase.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be cool and Answer only what they ask.

Interview Questions & Answers

user image Anonymous

posted on 23 Apr 2023

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Double-check your resume for any spelling mistakes. The recruiter may consider spelling mistakes as careless behavior or poor communication skills.
View all tips
Round 2 - Technical 

(4 Questions)

  • Q1. About project which was completed.... Water treatment plant.. CLF, Filter Bed House, Back wash, Aerator, Intake well
  • Q2. Capacity... 28,24,18 MLD, SIZE OF CLF.. 19m dia
  • Ans. 

    The capacity of the CLF is 28, 24, and 18 MLD with a size of 19m diameter.

    • CLF has a capacity of 28, 24, and 18 MLD

    • The size of the CLF is 19m in diameter

  • Answered by AI
  • Q3. Laying of pipe line.... HDPE, DI pipe, Dia63 mm to 200mm HDPE, DI pipeline Dia 200mm to 600mm
  • Q4. Mix design... M30, M2o,

Interview Preparation Tips

Interview preparation tips for other job seekers - Be Bold and give correct answer otherwise pass out
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Mar 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Properly align and format text in your resume. A recruiter will have to spend more time reading poorly aligned text, leading to high chances of rejection.
View all tips
Round 2 - One-on-one 

(2 Questions)

  • Q1. Brief your professional journey
  • Q2. What is documentation
  • Ans. 

    Documentation is the process of recording information in a systematic and organized manner.

    • It involves creating, storing, and retrieving documents.

    • Documentation can be in the form of written, electronic, or visual records.

    • Examples of documentation include contracts, reports, manuals, and policies.

    • Documentation is important for legal, regulatory, and organizational purposes.

    • It helps in maintaining consistency, accuracy,...

  • Answered by AI
Round 3 - HR 

(2 Questions)

  • Q1. What is your expected CTC.
  • Ans. 

    My expected CTC is in line with industry standards and commensurate with my experience and skills.

    • I have researched the market and have a good understanding of the salary range for this position.

    • I am open to negotiation based on the overall compensation package offered.

    • My previous salary was in the range of X to Y, and I am looking for a similar or higher package.

    • I am also interested in other benefits such as health in...

  • Answered by AI
  • Q2. How much experience do you have in water sector.

Interview Preparation Tips

Interview preparation tips for other job seekers - For salary hike , you must have salary slips and bank statement / joining, offer & Reliving letter of privious company

Top trending discussions

View All
Interview Tips & Stories
6d (edited)
a team lead
Why are women still asked such personal questions in interview?
I recently went for an interview… and honestly, m still trying to process what just happened. Instead of being asked about my skills, experience, or how I could add value to the company… the questions took a totally unexpected turn. The interviewer started asking things like When are you getting married? Are you engaged? And m sure, if I had said I was married, the next question would’ve been How long have you been married? What does my personal life have to do with the job m applying for? This is where I felt the gender discrimination hit hard. These types of questions are so casually thrown at women during interviews but are they ever asked to men? No one asks male candidates if they’re planning a wedding or how old their kids are. So why is it okay to ask women? Can we please stop normalising this kind of behaviour in interviews? Our careers shouldn’t be judged by our relationship status. Period.
Got a question about Brij Gopal Construction Company?
Ask anonymously on communities.

Brij Gopal Construction Company Interview FAQs

How many rounds are there in Brij Gopal Construction Company interview?
Brij Gopal Construction Company interview process usually has 2-3 rounds. The most common rounds in the Brij Gopal Construction Company interview process are Resume Shortlist, Technical and HR.
How to prepare for Brij Gopal Construction Company interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Brij Gopal Construction Company. The most common topics and skills that interviewers at Brij Gopal Construction Company expect are Accounting, TDS, Accounts Finalisation, Data Entry and Income Tax.
What are the top questions asked in Brij Gopal Construction Company interview?

Some of the top questions asked at the Brij Gopal Construction Company interview -

  1. what is full form of RJ...read more
  2. What is the strength of 1st class bric...read more
  3. what is GSB WMM DBM...read more

Tell us how to improve this page.

Overall Interview Experience Rating

3.5/5

based on 19 interview experiences

Difficulty level

Easy 67%
Moderate 33%

Duration

Less than 2 weeks 67%
2-4 weeks 33%
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 128 Interviews
Apco Infratech Interview Questions
3.7
 • 122 Interviews
L&T Energy Hydrocarbon Interview Questions
3.8
 • 105 Interviews
Aarvee Associates Interview Questions
3.9
 • 81 Interviews
Sterling & Wilson Interview Questions
4.1
 • 72 Interviews
Bechtel Interview Questions
3.9
 • 70 Interviews
Samsung E&A Interview Questions
4.0
 • 65 Interviews
Wood Group Interview Questions
3.7
 • 63 Interviews
Psp Projects Interview Questions
3.8
 • 61 Interviews
URC Construction Interview Questions
3.6
 • 59 Interviews
View all

Brij Gopal Construction Company Reviews and Ratings

based on 196 reviews

3.9/5

Rating in categories

3.7

Skill development

3.8

Work-life balance

3.5

Salary

3.8

Job security

3.6

Company culture

3.3

Promotions

3.6

Work satisfaction

Explore 196 Reviews and Ratings
Highway Engineer
22 salaries
unlock blur

₹2.3 L/yr - ₹6.2 L/yr

Senior Engineer
20 salaries
unlock blur

₹4.5 L/yr - ₹7.3 L/yr

Accountant
18 salaries
unlock blur

₹2 L/yr - ₹4.5 L/yr

Store Officer
15 salaries
unlock blur

₹3.2 L/yr - ₹5 L/yr

Executive Accountant
14 salaries
unlock blur

₹2.3 L/yr - ₹3.2 L/yr

Explore more salaries
Compare Brij Gopal Construction Company with

L&T Energy Hydrocarbon

3.8
Compare

AECOM

4.2
Compare

Sterling & Wilson

4.1
Compare

Apco Infratech

3.7
Compare
write
Share an Interview