I appeared for an interview in Oct 2023.
Load calculation is the process of determining the electrical load requirements for a project.
Identify the electrical devices and equipment that will be used in the project
Determine the power requirements (in watts) for each device
Calculate the total power demand by summing up the power requirements of all devices
Consider factors like diversity factor and demand factor to account for variations in usage
Ensure that the ...
The number of amps required for 1kVA depends on the voltage.
The formula to calculate amps is: Amps = kVA / Voltage
For example, if the voltage is 120V, then the amps required for 1kVA would be 8.33A
If the voltage is 240V, then the amps required for 1kVA would be 4.17A
Top trending discussions
I completed various projects during my Bachelor's degree, including a design project for a new bridge and a research project on renewable energy.
Designed a new bridge using CAD software
Researched and implemented renewable energy sources on campus
Collaborated with classmates on a group project to improve campus sustainability
I completed my 6 months internship at ABC Engineering Firm, where I gained hands-on experience in project management and design.
Internship at ABC Engineering Firm
Focused on project management and design
Hands-on experience gained
I applied via Campus Placement and was interviewed in Jan 2024. There were 2 interview rounds.
Experienced sales executive with a proven track record of exceeding targets and building strong client relationships.
Over 5 years of sales experience in the technology industry
Consistently met or exceeded sales targets by 20% each quarter
Built and maintained relationships with key clients such as ABC Company and XYZ Corporation
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Project refers to a specific task with a defined start and end, while project engineering involves the technical aspects of planning, designing, and executing the project.
Project is the overall task or objective to be completed within a specific timeframe.
Project engineering focuses on the technical aspects such as planning, designing, and executing the project.
Project management involves coordinating resources and tas...
Types of services in interior fitout include design, construction, project management, and installation.
Design services involve creating layouts, selecting materials, and creating 3D visualizations.
Construction services include building partitions, ceilings, and flooring.
Project management services involve coordinating schedules, budgets, and contractors.
Installation services include fitting furniture, fixtures, and eq...
Some common problems faced on site include delays in material delivery, inclement weather, and coordination issues.
Delays in material delivery can impact project timelines and budgets
Inclement weather can halt work progress and cause safety concerns
Coordination issues between different teams can lead to misunderstandings and errors
Agreement is a mutual understanding between parties, while a bond is a legal document that ensures fulfillment of obligations.
Agreement is a mutual understanding between two or more parties.
A bond is a legal document that guarantees the fulfillment of obligations.
Agreements are usually informal and may not always be legally binding.
Bonds are formal and legally enforceable documents.
Examples of agreements include contra...
posted on 11 Feb 2022
I applied via Campus Placement and was interviewed before Nov 2022. There were 4 interview rounds.
Excel sheet filling round
posted on 10 Apr 2023
I applied via Approached by Company and was interviewed in Mar 2023. There were 2 interview rounds.
posted on 8 Apr 2023
I applied via Walk-in and was interviewed before Apr 2022. There were 3 interview rounds.
The maximum span under bridges depends on various factors such as bridge type, design, and load capacity.
The maximum span under bridges is determined by the bridge type and design.
Factors such as the load capacity of the bridge and the materials used also affect the maximum span.
Different types of bridges have different maximum spans, for example, a suspension bridge can have a much longer span compared to a beam bridg...
Clearance from signals in front and back side is important for safety and efficient operation.
Clearance refers to the minimum distance required between the signals and any surrounding objects or structures.
It ensures that there is no interference or obstruction to the signals' visibility or functionality.
Clearance requirements may vary depending on the specific signal type and its intended purpose.
For example, in traff...
For making LOP, the required data includes the electrical load details, power supply specifications, circuit layout, and safety regulations.
Electrical load details such as the type of equipment, power rating, and operating voltage are necessary.
Power supply specifications like the voltage level, frequency, and phase configuration are important.
The circuit layout, including the arrangement of components, wiring, and con...
The data required for making CSD includes specifications, schematics, component datasheets, and design constraints.
Specifications of the electrical system
Schematics of the circuit design
Datasheets of the components being used
Design constraints and requirements
Seeking new challenges and growth opportunities.
Looking for a more challenging role to further develop my skills and expertise.
Seeking a company that aligns better with my long-term career goals.
Desire to work on more innovative projects and cutting-edge technologies.
Wishing to broaden my professional network and learn from new colleagues.
Wanting to explore different industry sectors and gain diverse experience.
I am unable to provide my last salary as I do not have access to the data.
I do not have the available data to provide my last salary
I am unable to access my salary information for the last 3 months
Unfortunately, I cannot provide the requested information
I applied via Company Website and was interviewed in Feb 2023. There were 2 interview rounds.
The coefficient of cement is a measure of its ability to expand or contract due to changes in temperature or moisture.
The coefficient of cement is also known as the coefficient of thermal expansion.
It is an important factor to consider in construction projects to prevent cracking or damage to structures.
The coefficient of cement varies depending on the type and composition of the cement.
For example, Portland cement typ...
Escalation of materials refers to the process of increasing the priority or urgency of obtaining necessary materials for a project.
Escalation may occur when there are delays in the delivery of materials or when the demand for materials exceeds the supply.
Project managers may escalate materials by contacting suppliers to expedite delivery or by seeking alternative sources for the materials.
Escalation can impact project ...
based on 1 interview
Interview experience
Project Engineer
14
salaries
| ₹5 L/yr - ₹8.6 L/yr |
Assistant Manager
12
salaries
| ₹5.1 L/yr - ₹8.5 L/yr |
Civil Site Engineer
10
salaries
| ₹2.5 L/yr - ₹3.6 L/yr |
Project Manager
9
salaries
| ₹9 L/yr - ₹17 L/yr |
Site Engineer
8
salaries
| ₹1.8 L/yr - ₹4.3 L/yr |
Knight Frank
R.S. Infraprojects
SMEC
BPTP