i
Brakes India
Filter interviews by
I applied via Approached by Company and was interviewed before Aug 2021. There were 2 interview rounds.
Top trending discussions
A tread and sidewall are key components of a tire, providing traction and protection.
The tread is the part of the tire that makes contact with the road surface, designed to provide grip and traction.
The sidewall is the vertical section of the tire that connects the tread to the bead of the tire, providing structural support and protection.
Tread patterns can vary based on the intended use of the tire, such as all-season...
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There was 1 interview round.
The Process of ST department involves analyzing and improving production processes to increase efficiency and quality.
Analyze current production processes
Identify areas for improvement
Implement changes to increase efficiency and quality
Monitor and evaluate the impact of changes
Collaborate with other departments to optimize overall production
The temperature of a thermal oven can vary depending on the specific model and purpose.
The temperature of a thermal oven is typically adjustable and can range from around 50°C to over 300°C.
Different types of thermal ovens may have different temperature ranges based on their intended use.
For example, a drying oven may have a lower temperature range compared to a high-temperature furnace.
I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.
Currently working as a Senior Team Leader in a retail company, responsible for managing a team of 15 employees and ensuring daily operations run smoothly.
Managing a team of 15 employees
Ensuring daily operations run smoothly
Handling customer complaints and escalations
Training new employees on company policies and procedures
I applied via Approached by Company and was interviewed in Nov 2023. There were 3 interview rounds.
Is English is compulsory is school
Managing mass absenteeism requires effective planning, communication, and flexibility.
Develop a contingency plan to address potential absences
Cross-train employees to ensure coverage in critical roles
Implement flexible work arrangements, such as remote work or flexible schedules
Communicate expectations and policies regarding absenteeism
Encourage a healthy work-life balance to reduce burnout and absenteeism
Monitor and t...
I am passionate about production and have the necessary skills and experience to excel in this role.
I have a strong background in production, with several years of experience in managing and overseeing production processes.
I have a deep understanding of the industry and its challenges, and I am confident in my ability to navigate and overcome them.
I am highly organized and detail-oriented, which are essential qualities...
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Mar 2024. There was 1 interview round.
I applied via Company Website and was interviewed in Dec 2023. There was 1 interview round.
posted on 10 Jun 2024
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing workload evenly among workstations
Minimizes idle time and bottlenecks
Improves productivity and efficiency
Example: In an assembly line, tasks are allocated to different stations to ensure smooth flow of production
TPM pillars are key principles for Total Productive Maintenance, leading to improved equipment reliability and productivity.
Pillar 1: Autonomous Maintenance - Involving operators in routine maintenance tasks to prevent breakdowns.
Pillar 2: Planned Maintenance - Scheduled maintenance activities to keep equipment in optimal condition.
Pillar 3: Quality Maintenance - Ensuring equipment is capable of producing quality produ...
5s is a methodology used to organize a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary ones.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaining th...
Bottlenecks are points in a process where the flow of work is impeded or slowed down, causing delays and inefficiencies.
Bottlenecks can occur due to limited resources, such as equipment or manpower
Identifying and addressing bottlenecks is crucial for improving overall productivity
Examples of bottlenecks include a machine that frequently breaks down, causing a backlog in production
Implementing strategies like cross-trai...
I applied via Recruitment Consulltant and was interviewed before Jan 2024. There were 3 interview rounds.
based on 1 review
Rating in categories
Trainee
272
salaries
| ₹0.9 L/yr - ₹3.1 L/yr |
Engineer
224
salaries
| ₹2.5 L/yr - ₹8.6 L/yr |
Junior Engineer
203
salaries
| ₹1.5 L/yr - ₹4.6 L/yr |
Senior Engineer
167
salaries
| ₹5.7 L/yr - ₹12.4 L/yr |
Deputy Engineer
150
salaries
| ₹3.2 L/yr - ₹7.7 L/yr |
Bosch
TVS Motor
Mahindra & Mahindra
Tata Motors