Filter interviews by
I appeared for an interview before Sep 2021.
Contingency plan is a backup plan to be executed in case of unexpected events or emergencies.
It outlines the steps to be taken in case of unforeseen circumstances
It helps to minimize the impact of the unexpected event
It includes identifying potential risks and preparing for them
Examples include having backup power generators in case of power outages, or having a backup supplier in case of a shortage of materials
It is i...
Top trending discussions
I applied via Walk-in and was interviewed in Jun 2021. There were 5 interview rounds.
I applied via Naukri.com and was interviewed in Aug 2023. There were 4 interview rounds.
Core tools of AIAG include FMEA, PPAP, MSA, SPC, and APQP.
FMEA (Failure Mode and Effects Analysis) is used to identify and prioritize potential failure modes in a process.
PPAP (Production Part Approval Process) is used to ensure that suppliers meet customer requirements.
MSA (Measurement Systems Analysis) is used to assess the quality of measurement systems.
SPC (Statistical Process Control) is used to monitor and contro...
I have experienced failures in project deadlines, communication, and technical solutions.
Missed project deadlines due to underestimating tasks
Miscommunication with team members leading to misunderstandings
Implemented technical solutions that did not meet requirements
Heat treatment process is a method used to alter the physical and sometimes chemical properties of a material through heating and cooling.
Involves heating the material to a specific temperature
Holding it at that temperature for a set amount of time
Then cooling it at a controlled rate
Can be used to increase hardness, improve machinability, or enhance other properties
Common techniques include annealing, quenching, temper
I applied via Campus Placement
I applied via Walk-in and was interviewed in Jul 2022. There were 2 interview rounds.
Arithmetic, reasoning, English
I applied via Naukri.com and was interviewed in Dec 2023. There were 2 interview rounds.
I applied via Naukri.com
I applied via Recruitment Consulltant and was interviewed before Oct 2021. There were 3 interview rounds.
Productivity improvement activities include process optimization, automation, training, and employee engagement.
Process optimization: streamlining workflows and eliminating waste
Automation: using technology to reduce manual labor and increase efficiency
Training: providing education and skill development to employees
Employee engagement: fostering a positive work environment and encouraging collaboration
Examples: impleme...
Assembly line capacity and type of assembly are crucial factors in manufacturing efficiency.
Assembly line capacity refers to the maximum amount of products that can be produced in a given time frame.
Type of assembly refers to the method used to assemble the product, such as manual or automated.
Efficient assembly lines require a balance between capacity and type of assembly.
For example, a high-capacity assembly line may...
Cycle time study techniques involve analyzing and improving the time it takes to complete a process.
Identify the process to be studied
Collect data on the process
Analyze the data to identify bottlenecks and inefficiencies
Implement improvements to reduce cycle time
Continuously monitor and adjust the process
Examples include time and motion studies, value stream mapping, and process mapping
I appeared for an interview before May 2023.
based on 2 reviews
Rating in categories
Assistant Manager
52
salaries
| ₹4.2 L/yr - ₹7.5 L/yr |
Production Engineer
38
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Quality Engineer
36
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Engineer
34
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Senior Engineer
22
salaries
| ₹3.2 L/yr - ₹6 L/yr |
Ag Industries
Toyoda Gosei Minda
Ralson Tyres Limited
Global Autotech