Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Nov 2022. There were 3 interview rounds.
Top trending discussions
I applied via Recruitment Consulltant and was interviewed in Nov 2024. There were 3 interview rounds.
I have 5 years of experience in production engineering.
I have worked in the production engineering field for 5 years.
My experience includes optimizing production processes and improving efficiency.
I have successfully implemented cost-saving measures in previous roles.
I have a strong understanding of manufacturing principles and technologies.
I have experience working with cross-functional teams to achieve production goa
Manpower can be effectively handled by proper planning, communication, training, and motivation.
Develop a clear organizational structure and job roles
Communicate effectively with the team to ensure understanding of goals and expectations
Provide necessary training and resources for skill development
Motivate and reward employees for their hard work and achievements
Regularly evaluate performance and provide feedback for i
Salary expectations are based on industry standards, experience, and location.
Research industry standards for Production Engineers in your area
Consider your level of experience and skills
Factor in the cost of living in the location of the job
Be prepared to negotiate based on benefits and perks offered
Provide a range rather than a specific number
posted on 15 Dec 2024
I applied via Recruitment Consulltant and was interviewed in Jun 2024. There were 2 interview rounds.
I was interviewed in Aug 2024.
English, maths and puzzles basic preparation.
Question
Add four work before work,guard to make meaningful word
I was interviewed in Aug 2023.
My KPI as a Production Engineer is to ensure efficient production processes, minimize downtime, and optimize product quality.
Monitoring and improving production efficiency
Reducing downtime through preventive maintenance
Implementing quality control measures
Optimizing production output
Analyzing and improving production costs
OEE (Overall Equipment Efficiency) can be calculated by multiplying Availability, Performance, and Quality percentages.
Calculate Availability by dividing the total operating time by the planned production time.
Calculate Performance by dividing the actual production rate by the maximum production rate.
Calculate Quality by dividing the good units produced by the total units produced.
Multiply the Availability, Performance
4M is a methodology used in production engineering. Retroactive refers to actions taken after an event, while prospective refers to actions taken before an event.
4M is a methodology used in production engineering that stands for Man, Machine, Material, and Method.
Man refers to the human resources involved in the production process.
Machine refers to the equipment and tools used in production.
Material refers to the raw m...
The base documents of a control plan include process flow diagrams, work instructions, and quality standards.
Process flow diagrams outline the sequence of steps in the production process.
Work instructions provide detailed instructions on how to perform each step of the process.
Quality standards define the criteria for acceptable quality and specify the required inspections and tests.
Other base documents may include con...
5W 1H is a technique used to gather information by asking five 'W' questions and one 'H' question.
5W 1H stands for Who, What, When, Where, Why, and How.
It is commonly used in journalism, problem-solving, and project management.
By asking these questions, one can gather comprehensive information about a situation or problem.
For example, in a production engineering context, the 5W 1H questions could be: Who is responsible...
I applied via Recruitment Consulltant and was interviewed in Jun 2023. There were 4 interview rounds.
posted on 3 Apr 2024
posted on 27 May 2021
I applied via Referral and was interviewed in Apr 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Dec 2021. There were 3 interview rounds.
posted on 17 Jun 2021
To control wastage and increase productivity, proper planning, training, and monitoring are necessary.
Implement lean manufacturing techniques
Train employees on efficient use of resources
Monitor production processes to identify areas of improvement
Implement quality control measures to reduce defects
Optimize production schedules to reduce downtime
Invest in automation to reduce manual labor
Encourage employee feedback and
HRTC, MTC, Chiller, Sequencer and Robot are all equipment used in production engineering.
HRTC (High Rate Thermo Chiller) is used for cooling high power lasers in manufacturing.
MTC (Multi-Temperature Chiller) is used for cooling multiple machines at different temperatures.
Chiller is used for cooling various equipment in production.
Sequencer is used to control the sequence of operations in a manufacturing process.
Robot i...
based on 15 reviews
Rating in categories
Assistant Manager
57
salaries
| ₹4 L/yr - ₹7.5 L/yr |
Senior Engineer
40
salaries
| ₹3.2 L/yr - ₹6.8 L/yr |
Production Engineer
40
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Quality Engineer
34
salaries
| ₹1.8 L/yr - ₹3.6 L/yr |
Engineer
31
salaries
| ₹2.2 L/yr - ₹4.3 L/yr |
Ag Industries
Toyoda Gosei Minda
Global Autotech
Ralson Tyres Limited