Upload Button Icon Add office photos

Filter interviews by

Birla Uttam Cement Interview Questions and Answers

Updated 24 May 2023

Birla Uttam Cement Interview Experiences

2 interviews found

Morak Goan Interview Questions & Answers

user image Anonymous

posted on 24 May 2023

Interview experience
3
Average
Difficulty level
Easy
Process Duration
-
Result
-
Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. One tap how many voltage will down and up in transformer
  • Ans. 

    The voltage that goes up or down in a transformer depends on the transformer's specifications.

    • The voltage that goes up or down in a transformer depends on the transformer's specifications.

    • Transformers can step up or step down voltage depending on their design.

    • The voltage change also depends on the input voltage and the load on the transformer.

    • Without knowing the specific transformer's specifications, it is impossible t

  • Answered by AI
  • Q2. In Disynchronising possision why are capacitor bank to be off
  • Ans. 

    Capacitor banks are turned off in Disynchronising position to prevent damage to the equipment.

    • Disynchronising position causes voltage and frequency fluctuations

    • Capacitor banks can't handle these fluctuations and may get damaged

    • Turning off capacitor banks protects them from damage

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Give in answer in Hindi language

I applied via Walk-in and was interviewed in May 2022. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. Civil work related any technical questions
  • Q2. Technical questions any technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Good communication and hardworking good work men ship

Sales Support Associate Interview Questions asked at other Companies

Q1. When customer is angry that time what to do you
View answer (1)

Interview questions from similar companies

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Group Discussion 

Diesel Generator: A Reliable Power Source
A diesel generator is a self-contained power generating unit that combines a diesel engine with an electric generator (often an alternator). It's a versatile and widely used source of electricity, particularly in situations where a reliable power supply is crucial.
How Diesel Generators Work
* Diesel Engine: The diesel engine, fueled by diesel fuel, acts as the prime mover. It converts the chemical energy of the fuel into mechanical energy through combustion.
* Electric Generator: The mechanical energy from the engine is transferred to the generator, which converts it into electrical energy. This electrical energy can then be used to power various appliances and equipment.
Applications of Diesel Generators
* Backup Power: Diesel generators are commonly used as backup power sources for homes, businesses, hospitals, and critical infrastructure during power outages.
* Remote Locations: In areas with limited or no access to the grid, diesel generators provide a reliable source of electricity for various applications.
* Construction Sites: Diesel generators power tools and equipment on construction sites, ensuring work can continue even in remote locations.
* Off-Grid Living: Individuals living off the grid often rely on diesel generators for their electricity needs.
* Data Centers: Diesel generators provide backup power to ensure the continuous operation of critical data centers.
Advantages of Diesel Generators
* Reliability: Diesel engines are known for their durability and reliability, making them suitable for demanding applications.
* Fuel Efficiency: Modern diesel engines offer excellent fuel efficiency, reducing operating costs.
* Wide Power Range: Diesel generators are available in a wide range of sizes and power capacities, catering to various needs.
* Easy Maintenance: Diesel generators are relatively easy to maintain and service.
Disadvantages of Diesel Generators
* Noise: Diesel generators can be noisy, which may be a concern in certain settings.

Round 2 - One-on-one 

(3 Questions)

  • Q1. Transformer & protection
  • Q2. Breaker & protection
  • Q3. Motor panel Feeder & protection
Round 3 - One-on-one 

(2 Questions)

  • Q1. Motor & Motor protection
  • Q2. All types panel & protection
  • Ans. 

    Panel and protection systems are essential components in electrical engineering for controlling and safeguarding electrical circuits.

    • Different types of panels include distribution panels, control panels, and instrumentation panels.

    • Protection systems include overcurrent protection, earth fault protection, and differential protection.

    • Panels are used to house electrical components and provide a safe environment for operat...

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I was interviewed in Dec 2024.

Round 1 - Technical 

(4 Questions)

  • Q1. The Electrical technician job description entails participating in independent maintenance related training activities organized by the field operations teams and coordinating shutdowns to ensure that ...
  • Q2. Commercial and Industrial Electrical Maintenance is the process of regularly inspecting, testing, cleaning, and repairing electrical systems and components to ensure they are safe and functioning Prope...
  • Q3. The technician’s role also includes participating in planning, ensuring effective spare parts management, and supervising continuous project improvement.
  • Q4. Electrical technicians perform various functions, depending on the particular operations of the company or organization they work with. However, their role is majorly to ensure effective repairs and mainte...

Interview Preparation Tips

Interview preparation tips for other job seekers - Electrical safety
Power suppliers
Electrical troubleshooting
PLC Electrical control panel
Interview experience
3
Average
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected
Round 1 - Technical 

(5 Questions)

  • Q1. What are the standards for scaffolding codes?
  • Q2. What are the different types of scaffolding erection?
  • Q3. What type of use material for safety purchase
  • Q4. How to safe Erection
  • Q5. Identify risk and hazard

Interview Preparation Tips

Interview preparation tips for other job seekers - We are erecting scaffolding according to the company's standards.
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
-
Result
Selected Selected
Round 1 - One-on-one 

(5 Questions)

  • Q1. My Experience is good and best Experience this this my problem is company dropuot , My interview this HR.and CEO. BM .and Accounted this all company best Experience members this me interview show That is ...
  • Q2. Company manufacturing work this BHEL part and CGL part working this manufacturing company
  • Q3. What is skill? Ans:- MS word ms excel and telly knowledge all store keepers knowledge
  • Q4. What this professional and personal? Ans:-I am work times professional and that is work out time personal
  • Q5. What did you house? Working side areas areng

Deputy Regional Planning Manager Interview Questions & Answers

Shapoorji Pallonji Group user image Anonymous

posted on 7 Dec 2024

Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Naukri.com

Round 1 - Technical 

(10 Questions)

  • Q1. Brief about your education, career, previous projects handled, and role & responsibility in past organisations?
  • Q2. Current roles & responsibilities and value addition done by you and your team?
  • Q3. Process flow for planning throughout project life-cycle?
  • Q4. Critical/concerning areas to be monitored?
  • Q5. Productivity and permissible material wastage, process to prepare material reconciliation?
  • Q6. Understanding about claim and type of claim raised/supported to raise in past experience?
  • Q7. Experience of technical aspects and planning assessment required at tendering stage, capabilities to prepare tender submittals and proving insights to management on same?
  • Q8. Necessity of providing PMO support to management?
  • Q9. Understanding about role & responsibility of regional planning manager?
  • Q10. MIS and type of reports prepared in past and their significance for Top managemennt?
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Nov 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Transmission Tower Detailing
  • Q2. Shop Drawing Bil of Meterial Tower Devlop & Re Devlop
  • Q3. Raice Chimney Drawing
  • Q4. Stub Template Prop Drawing
  • Q5. Structural Develop and Redevelop, Marking Erection Drawing , Bolts Nuts Grip Checking and Counting, Bill of Material , Shop Drawing Cad & Dxf and Shop Drawing Checking , Prop Drawing, Raise Chimney Transm...

Interview Preparation Tips

Interview preparation tips for other job seekers - Transmission Tower Detailing Shop Drawing Bill Of Meterial Tower Devlop & Re Devlop, RC, Prop
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-

I applied via Campus Placement

Round 1 - Aptitude Test 

It was a technicaL + aptitude test with 60 minutes duration.

Round 2 - Technical 

(2 Questions)

  • Q1. Basic questions regarding the projects that i have done.
  • Q2. They asked me about my favourite subjects and then they asked some basic questions regarding those subjects.
Round 3 - HR 

(1 Question)

  • Q1. HR round in TCE is not an interview round rather it is a video assessment wherein we were given with two HR questions and we have to record a video answering the questions. maximum duration of the video sh...

Interview Preparation Tips

Interview preparation tips for other job seekers - Revise the core subjects of your field as it will help you during your technical test or interview as well. Feel confident while answering the question during Technical/HR interview.

Employee Interview Questions & Answers

Tata Technologies user image Vijay duniya Duniya

posted on 19 Dec 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
No response

I applied via Company Website and was interviewed in Nov 2024. There were 5 interview rounds.

Round 1 - Aptitude Test 

Behaviour and believe to inform decisions

Round 2 - Case Study 

Details account information and development of the person

Round 3 - Coding Test 

Slove tha coding problem

Round 4 - Group Discussion 

Further details and self information sharing and openly speaking skills test

Round 5 - One-on-one 

(5 Questions)

  • Q1. Interview questions
  • Q2. Self information
  • Q3. Behaviour to the person and turned
  • Q4. Qualification and believe
  • Q5. Safety skills and pasting maind set

Interview Preparation Tips

Topics to prepare for Tata Technologies Employee interview:
  • CNC Machines
  • Machine Operating
Interview preparation tips for other job seekers - Don't panic and be strong

Birla Uttam Cement Interview FAQs

How many rounds are there in Birla Uttam Cement interview?
Birla Uttam Cement interview process usually has 1-2 rounds. The most common rounds in the Birla Uttam Cement interview process are Technical and Resume Shortlist.
What are the top questions asked in Birla Uttam Cement interview?

Some of the top questions asked at the Birla Uttam Cement interview -

  1. One tap how many voltage will down and up in transfor...read more
  2. In Disynchronising possision why are capacitor bank to be ...read more
  3. Civil work related any technical questi...read more

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 715 Interviews
Tata Projects Interview Questions
4.2
 • 413 Interviews
KEC International Interview Questions
4.1
 • 289 Interviews
Tata Technologies Interview Questions
3.6
 • 252 Interviews
TCE Interview Questions
3.8
 • 244 Interviews
View all
Compare Birla Uttam Cement with

Larsen & Toubro Limited

4.0
Compare

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Megha Engineering & Infrastructures

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview