Filter interviews by
I applied via Naukri.com and was interviewed in Aug 2023. There was 1 interview round.
Performance rate is 97%
Performance rate = 100% - (100% - 97%) = 3%
Performance rate = 3%
This means the actual performance is 3% below the planned performance
Implement strict quality control measures, identify root causes of rework, provide training to employees, and continuously monitor and improve processes.
Implement strict quality control measures to catch errors early on
Identify root causes of rework to address underlying issues
Provide training to employees to improve skills and reduce errors
Continuously monitor and improve processes to prevent rework
Utilize data analys
I improve my productivity rate by setting clear goals, prioritizing tasks, utilizing time management techniques, and continuously seeking ways to streamline processes.
Setting clear goals to stay focused and motivated
Prioritizing tasks based on importance and deadlines
Utilizing time management techniques such as the Pomodoro technique or Eisenhower matrix
Seeking ways to streamline processes through automation or optimiz...
Labor cost can be decreased by implementing automation, optimizing processes, outsourcing non-core tasks, and cross-training employees.
Implement automation to reduce manual labor requirements
Optimize processes to increase efficiency and reduce labor hours
Outsource non-core tasks to lower cost regions or specialized vendors
Cross-train employees to handle multiple roles and tasks effectively
To reduce change over frequency, implement standardized work procedures, improve equipment reliability, optimize scheduling, and minimize setup times.
Implement standardized work procedures to ensure consistency and efficiency during changeovers
Improve equipment reliability to reduce downtime and increase productivity
Optimize scheduling to minimize changeover frequency and maximize production time
Minimize setup times by...
DWM stands for Daily Work Management, which involves planning, organizing, and executing daily tasks to ensure efficient production operations.
DWM involves creating daily schedules for production activities
It includes assigning tasks to team members and monitoring progress
Regularly updating and adjusting plans based on production needs
Examples: setting up daily production targets, coordinating with different department
Performance is dependent on various factors, not just availability.
Performance is influenced by factors such as skill level, experience, resources, and support.
Availability is just one aspect that can impact performance, but it is not the sole determinant.
For example, even if availability is high, performance may still be low if other factors are not optimal.
Listen to the complaint, empathize with the customer, investigate the issue, offer a solution, follow up to ensure satisfaction.
Listen actively to the customer's complaint without interrupting
Empathize with the customer and acknowledge their frustration
Investigate the issue to understand the root cause
Offer a solution that addresses the customer's concerns
Follow up with the customer to ensure their satisfaction with th
To manage abnormal conditions, prioritize safety, assess the situation, take corrective actions, and communicate effectively.
Prioritize safety of personnel and equipment
Assess the situation to understand the root cause
Take corrective actions promptly to mitigate the abnormal condition
Communicate effectively with team members and stakeholders
Implement preventive measures to avoid recurrence
posted on 1 Jun 2020
I applied via Naukri.com and was interviewed in May 2020. There were 4 interview rounds.
Die casting and machining defects are common in manufacturing processes.
Die casting defects include porosity, shrinkage, cold shuts, and flash.
Machining defects include burrs, chatter marks, and tool marks.
Die casting defects can be caused by improper temperature, pressure, or metal flow.
Machining defects can be caused by dull tools, improper speeds and feeds, or poor fixturing.
Defects can lead to part failure, reduced
Filling and high speed ratio formula is used to calculate the filling time of a container with a specific volume of liquid at a given flow rate.
Filling and high speed ratio formula is V/Q
V is the volume of the container and Q is the flow rate of the liquid
The formula is used to determine the time it takes to fill a container with a specific volume of liquid at a given flow rate
The higher the flow rate, the faster the c
posted on 19 Jan 2021
I was interviewed in Jul 2020.
I have achieved several milestones throughout my career as a Senior Engineer.
Successfully led a team of engineers to develop and implement a new software system, resulting in a 20% increase in efficiency.
Received recognition for designing and implementing a cost-effective solution that reduced production downtime by 30%.
Contributed to the development of a groundbreaking technology that revolutionized the industry, lead...
posted on 21 Aug 2023
I applied via Recruitment Consulltant and was interviewed in Feb 2023. There were 2 interview rounds.
posted on 1 Mar 2024
I applied via Naukri.com and was interviewed in Feb 2024. There was 1 interview round.
I applied via Naukri.com and was interviewed before Dec 2023. There was 1 interview round.
I applied via Recruitment Consulltant and was interviewed before Feb 2023. There were 3 interview rounds.
Yes
Yes, I have audited suppliers and conducted vendor visits.
During my previous role as a Senior Engineer, I was responsible for auditing suppliers to ensure compliance with quality standards and specifications.
I have also conducted vendor visits to assess their capabilities, production processes, and quality control measures.
These audits and visits helped in identifying potential risks, improving supplier performance,...
posted on 12 Jan 2023
posted on 26 Aug 2022
I applied via Naukri.com and was interviewed in Feb 2022. There were 3 interview rounds.
Some of the top questions asked at the Bharat Seats Senior Production Engineer interview for experienced candidates -
based on 1 interview
Interview experience
based on 5 reviews
Rating in categories
Assistant Manager
95
salaries
| ₹0 L/yr - ₹0 L/yr |
Senior Engineer
92
salaries
| ₹0 L/yr - ₹0 L/yr |
Junior Engineer
60
salaries
| ₹0 L/yr - ₹0 L/yr |
Deputy Manager
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Diploma Trainee Engineer
48
salaries
| ₹0 L/yr - ₹0 L/yr |
Faurecia
Lear Corporation
Adient
Samvardhana Motherson Group