Filter interviews by
I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.
Boiler installation process involves several steps and adherence to standard operating procedures.
Site preparation and foundation construction
Boiler assembly and installation
Piping and electrical connections
Commissioning and testing
Documentation and record-keeping
Regular maintenance and inspection
Examples: ASME Boiler and Pressure Vessel Code, NFPA 85, manufacturer's instructions
Chiller installation requires proper planning and execution to ensure efficient operation. SOP should be followed for safe and effective installation.
Proper site survey and selection of suitable location for chiller installation
Ensuring proper electrical and mechanical connections
Proper insulation and piping
Following manufacturer's instructions for installation and commissioning
Conducting performance tests and ensuring...
Top trending discussions
Sales Executive
184
salaries
| ₹1.8 L/yr - ₹5.1 L/yr |
Secondary Sales Executive
146
salaries
| ₹2.2 L/yr - ₹5 L/yr |
Area Sales Manager
52
salaries
| ₹4.9 L/yr - ₹8.5 L/yr |
Sales Manager
27
salaries
| ₹8.6 L/yr - ₹16 L/yr |
QA Executive
25
salaries
| ₹3 L/yr - ₹5.6 L/yr |
Parle Agro
Dabur
Britannia
Nestle