I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.
Rolling margin of TMT bars refers to the difference between the theoretical weight and the actual weight of the bars after rolling.
Rolling margin is calculated by subtracting the actual weight of the TMT bar from the theoretical weight.
It is important to control the rolling margin to ensure the quality and consistency of the TMT bars.
For example, if the theoretical weight of a TMT bar is 10 kg and the actual weight aft...
Plastering work is typically measured in square meters or square feet.
Plastering work is usually measured in terms of area covered, such as square meters or square feet.
The thickness of the plaster is also taken into account when measuring the work.
For example, if a wall is plastered with a thickness of 15mm, the measurement would be different compared to a wall plastered with 20mm thickness.
IS Codes are used for standardization and quality assurance in billing work.
IS 456:2000 - Code of practice for plain and reinforced concrete
IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement
IS 3370:1965 - Code of practice for concrete construction
IS 1200:1976 - Method of measurement of building and civil engineering works
IS 7272:1974 - Code of practice for construction of reinforced c
Wastage of TMT and concrete can occur due to improper handling, inaccurate measurements, and lack of proper planning.
Improper handling of materials during transportation and storage can lead to wastage.
Inaccurate measurements during cutting and bending of TMT bars can result in wastage.
Lack of proper planning and coordination among the construction team can also contribute to wastage.
Using excess concrete than required...
I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.
posted on 20 Nov 2020
I applied via Campus Placement and was interviewed before Nov 2019. There were 5 interview rounds.
Escalation is the increase in cost or price of goods or services over time due to various factors.
Escalation is significant in construction projects where the cost of materials and labor can increase over time.
It is important to factor in escalation when creating project budgets and timelines.
The formula for escalation is: Escalated Cost = Base Cost x (1 + Escalation Rate)^Number of Years
For example, if the base cost o...
Penalty is a punishment for breach of contract while liquidity damages compensate for financial loss due to breach.
Penalty is a fixed amount agreed upon in the contract as a punishment for breach of contract.
Liquidity damages compensate for the actual financial loss suffered due to breach of contract.
Penalty is usually higher than the actual loss suffered while liquidity damages are calculated based on the actual loss.
...
Basic Price variation refers to the change in the cost of materials or labor used in a project.
Basic Price variation is a common clause in construction contracts.
It allows for adjustments to the contract price based on changes in the cost of materials or labor.
The variation can be positive or negative, depending on whether the cost has increased or decreased.
The variation is usually calculated using an agreed-upon form...
Yes, basic price variation is beneficial for a contract.
Basic price variation allows for adjustments to be made to the contract price based on changes in market conditions or material costs.
This helps to ensure that the contractor is not unfairly burdened with unexpected costs and can maintain profitability.
It also provides a level of transparency and accountability in the contract, as both parties are aware of the pot...
There are various types of contracts in construction projects. Each has its own advantages and drawbacks.
Types of contracts include lump sum, cost-plus, time and material, and unit price contracts.
Lump sum contracts provide a fixed price for the entire project, but can lead to disputes over changes.
Cost-plus contracts reimburse the contractor for all costs plus a fee, but can lead to inflated costs.
Time and material co...
I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.
I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.
The question is unclear and lacks context.
Please provide more information about the 'update shuttering system'.
Specify the time frame for the updates.
Clarify the purpose or objective of the updates.
Provide any relevant examples or scenarios.
I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.
As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.
I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.
While working on a formwork or quality team would be valuable experi...
Concrete is the most important as it provides the strength and durability to the structure.
Concrete is the backbone of any RCC structure.
It provides the strength and durability to the structure.
Reinforcements and formwork are important too, but without concrete, they are useless.
Proper mix design and curing of concrete are crucial for the longevity of the structure.
I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.
Mix design of concrete and BTech project
Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete
Factors like strength, workability, durability, and cost are considered while designing the mix
BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design
Examples of BTech projects...
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 4 May 2019
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Civil Site Engineer
9
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer Mechanical
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Billing Engineer
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Site Engineer
6
salaries
| ₹0 L/yr - ₹0 L/yr |
Project Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
L&T Construction
Tata Projects
Shapoorji Pallonji Group
GMR Group