Upload Button Icon Add office photos

Filter interviews by

BD Buildcon Billing Engineer Interview Questions, Process, and Tips for Experienced

Updated 20 Oct 2023

BD Buildcon Billing Engineer Interview Experiences for Experienced

1 interview found

Interview experience
3
Average
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Sep 2023. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Rolling margin of TMT bars?
  • Ans. 

    Rolling margin of TMT bars refers to the difference between the theoretical weight and the actual weight of the bars after rolling.

    • Rolling margin is calculated by subtracting the actual weight of the TMT bar from the theoretical weight.

    • It is important to control the rolling margin to ensure the quality and consistency of the TMT bars.

    • For example, if the theoretical weight of a TMT bar is 10 kg and the actual weight aft...

  • Answered by AI
Round 3 - HR 

(4 Questions)

  • Q1. Your salary expectation?
  • Q2. 2. Mode of Measurement of Plastering work?
  • Ans. 

    Plastering work is typically measured in square meters or square feet.

    • Plastering work is usually measured in terms of area covered, such as square meters or square feet.

    • The thickness of the plaster is also taken into account when measuring the work.

    • For example, if a wall is plastered with a thickness of 15mm, the measurement would be different compared to a wall plastered with 20mm thickness.

  • Answered by AI
  • Q3. 3. List of IS Code use of Billing work
  • Ans. 

    IS Codes are used for standardization and quality assurance in billing work.

    • IS 456:2000 - Code of practice for plain and reinforced concrete

    • IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement

    • IS 3370:1965 - Code of practice for concrete construction

    • IS 1200:1976 - Method of measurement of building and civil engineering works

    • IS 7272:1974 - Code of practice for construction of reinforced c

  • Answered by AI
  • Q4. 4. Wastage of TMT,Concrete
  • Ans. 

    Wastage of TMT and concrete can occur due to improper handling, inaccurate measurements, and lack of proper planning.

    • Improper handling of materials during transportation and storage can lead to wastage.

    • Inaccurate measurements during cutting and bending of TMT bars can result in wastage.

    • Lack of proper planning and coordination among the construction team can also contribute to wastage.

    • Using excess concrete than required...

  • Answered by AI

Interview questions from similar companies

I applied via Referral and was interviewed in Oct 2020. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Technical questions relating to our job in deep. That's it

Interview Preparation Tips

Interview preparation tips for other job seekers - Whatever you know about say genuinely and be confident always. Don't hesitate at all.
Put your thoughts clearly.

I applied via Campus Placement and was interviewed before Nov 2019. There were 5 interview rounds.

Interview Questionnaire 

5 Questions

  • Q1. What is Escalation and what is the significance of this? What is the formula to determine Escalation.
  • Ans. 

    Escalation is the increase in cost or price of goods or services over time due to various factors.

    • Escalation is significant in construction projects where the cost of materials and labor can increase over time.

    • It is important to factor in escalation when creating project budgets and timelines.

    • The formula for escalation is: Escalated Cost = Base Cost x (1 + Escalation Rate)^Number of Years

    • For example, if the base cost o...

  • Answered by AI
  • Q2. What is the difference between penality and Liquidity damages?
  • Ans. 

    Penalty is a punishment for breach of contract while liquidity damages compensate for financial loss due to breach.

    • Penalty is a fixed amount agreed upon in the contract as a punishment for breach of contract.

    • Liquidity damages compensate for the actual financial loss suffered due to breach of contract.

    • Penalty is usually higher than the actual loss suffered while liquidity damages are calculated based on the actual loss.

    • ...

  • Answered by AI
  • Q3. What do you understand by Term Basic Price variation?
  • Ans. 

    Basic Price variation refers to the change in the cost of materials or labor used in a project.

    • Basic Price variation is a common clause in construction contracts.

    • It allows for adjustments to the contract price based on changes in the cost of materials or labor.

    • The variation can be positive or negative, depending on whether the cost has increased or decreased.

    • The variation is usually calculated using an agreed-upon form...

  • Answered by AI
  • Q4. Is Basic price variation is beneficial for a contract or not? If yes, then explain it how?
  • Ans. 

    Yes, basic price variation is beneficial for a contract.

    • Basic price variation allows for adjustments to be made to the contract price based on changes in market conditions or material costs.

    • This helps to ensure that the contractor is not unfairly burdened with unexpected costs and can maintain profitability.

    • It also provides a level of transparency and accountability in the contract, as both parties are aware of the pot...

  • Answered by AI
  • Q5. How many types of contract and their importance? What are the advantages and drawbacks of each.
  • Ans. 

    There are various types of contracts in construction projects. Each has its own advantages and drawbacks.

    • Types of contracts include lump sum, cost-plus, time and material, and unit price contracts.

    • Lump sum contracts provide a fixed price for the entire project, but can lead to disputes over changes.

    • Cost-plus contracts reimburse the contractor for all costs plus a fee, but can lead to inflated costs.

    • Time and material co...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Always answer straight to the point.Di jot make a lengthy note, keep it brief unless and otherwise they ask itself.
If you don't know the answer, say No, don't trying to confuse.

Always be confident on your each answer.

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my work experience & my self
  • Q2. Tell me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always candidates have good knowledge of relevant work.and be confident about it,interviewrs always seeing your confidence level and skills.

Interview Questionnaire 

1 Question

  • Q1. Technical question

Interview Questionnaire 

3 Questions

  • Q1. Basically questions related to power distribution field & some of college courses.
  • Q2. In this round questions basically related to management & technical composition.
  • Q3. He only asked your previous n current financial requirements as per your interview.

BD Buildcon Interview FAQs

How many rounds are there in BD Buildcon Billing Engineer interview for experienced candidates?
BD Buildcon interview process for experienced candidates usually has 3 rounds. The most common rounds in the BD Buildcon interview process for experienced candidates are Resume Shortlist, Technical and HR.
What are the top questions asked in BD Buildcon Billing Engineer interview for experienced candidates?

Some of the top questions asked at the BD Buildcon Billing Engineer interview for experienced candidates -

  1. 2. Mode of Measurement of Plastering wo...read more
  2. 3. List of IS Code use of Billing w...read more
  3. 4. Wastage of TMT,Concr...read more

Tell us how to improve this page.

BD Buildcon Billing Engineer Interview Process for Experienced

based on 1 interview

Interview experience

3
  
Average
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 746 Interviews
Tata Projects Interview Questions
4.2
 • 431 Interviews
AmbitionBox Interview Questions
4.9
 • 151 Interviews
HCL Infosystems Interview Questions
3.9
 • 140 Interviews
Webdew Interview Questions
4.5
 • 106 Interviews
View all
BD Buildcon Billing Engineer Salary
based on 7 salaries
₹4.8 L/yr - ₹7.8 L/yr
23% more than the average Billing Engineer Salary in India
View more details

BD Buildcon Billing Engineer Reviews and Ratings

based on 1 review

5.0/5

Rating in categories

5.0

Skill development

5.0

Work-life balance

5.0

Salary

4.0

Job security

5.0

Company culture

4.0

Promotions

4.0

Work satisfaction

Explore 1 Review and Rating
Civil Site Engineer
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer Mechanical
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Billing Engineer
7 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Manager
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare BD Buildcon with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

GMR Group

4.0
Compare
Did you find this page helpful?
Yes No
write
Share an Interview