I applied via LinkedIn and was interviewed before Mar 2022. There were 3 interview rounds.
Designing an ACB for a 1000kw load
Calculate the total current required for the load
Select an appropriate ACB with a suitable current rating
Consider the voltage rating and breaking capacity of the ACB
Ensure proper coordination with other protective devices
Design the control circuit for the ACB
Perform necessary calculations for cable sizing and select appropriate cables
Consider any specific requirements or regulations ap
Discuss about Salary & joining date.
I applied via Naukri.com and was interviewed in Jul 2023. There were 4 interview rounds.
Technical Specification
I applied via Approached by Company and was interviewed in Dec 2022. There were 4 interview rounds.
I applied via Approached by Company and was interviewed before Jan 2023. There were 2 interview rounds.
I was interviewed before Sep 2022.
I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Apr 2021. There was 1 interview round.
Risk assessment and SWMS are safety measures used in construction. Scaffolding is a temporary structure used to support workers and materials.
Risk assessment involves identifying potential hazards and evaluating the likelihood and severity of harm that could result from those hazards.
SWMS (Safe Work Method Statement) is a document that outlines the steps to be taken to complete a task safely.
Scaffolding is a temporary ...
based on 2 reviews
Rating in categories
Deputy Manager
4
salaries
| ₹13 L/yr - ₹15 L/yr |
Electrical Engineer
4
salaries
| ₹2 L/yr - ₹11 L/yr |
Project Coordinator
3
salaries
| ₹2.4 L/yr - ₹3.6 L/yr |
Aditya Birla Group
Reliance Industries
Tata Group
Adani Group