Filter interviews by
Yes, I have extensive experience in price negotiation and vendor development, ensuring optimal procurement strategies.
Conduct thorough market research to understand pricing trends and vendor capabilities.
Utilize competitive bidding processes to drive down costs, as seen in my previous role where I reduced supplier costs by 15%.
Build strong relationships with vendors to foster collaboration and negotiate better ter...
I utilize strategic sourcing, market analysis, and supplier relationships to ensure optimal purchasing outcomes.
Conduct thorough market research to identify trends and price fluctuations, using tools like market reports and supplier databases.
Establish strong relationships with suppliers to negotiate better terms and ensure quality materials, such as visiting suppliers' facilities.
Implement a just-in-time inventor...
Effective stock inventory management minimizes dead stock and optimizes resources through strategic planning and analysis.
Implement regular inventory audits to identify non-moving stock, e.g., quarterly reviews.
Utilize inventory management software for real-time tracking and forecasting demand.
Establish clear reorder points to prevent overstocking and stockouts.
Consider promotional strategies or discounts to move ...
Yes, I understand the material delivery cycle and the importance of adhering to delivery schedules for efficient operations.
The material delivery cycle includes procurement, transportation, and receipt of goods.
A well-defined delivery schedule ensures timely availability of materials, reducing downtime.
For example, in a manufacturing setting, delays in raw material delivery can halt production lines.
Effective comm...
Yes, I understand price negotiation and cost-saving strategies, essential for maximizing value in procurement.
Establish clear objectives: Define target prices and desired outcomes before negotiations.
Research market trends: Analyze pricing data and competitor offerings to inform negotiation strategies.
Leverage volume purchasing: Negotiate discounts based on bulk orders, as seen in many retail sectors.
Build strong ...
I would prefer to assess the situation before deciding to go to the market when the machine is down.
Evaluate the urgency: If production is halted, immediate action may be necessary.
Consider alternatives: Can repairs be made quickly or is there a backup machine?
Supplier relationships: Having strong ties with suppliers can expedite the procurement process.
Cost implications: Assess if purchasing new equipment is more...
I possess extensive knowledge of purchasing processes for indirect material handling, ensuring efficiency and cost-effectiveness.
Understanding of procurement strategies for indirect materials, such as office supplies and maintenance equipment.
Experience in vendor selection and management, ensuring quality and reliability of suppliers.
Knowledge of inventory management systems to track indirect materials and optimiz...
Yes, I have a comprehensive understanding of the automobile industry, including trends, supply chains, and market dynamics.
The automobile industry is a major contributor to the global economy, with key players like Toyota, Ford, and Volkswagen.
Electric vehicles (EVs) are transforming the market, with companies like Tesla leading the charge in innovation and sustainability.
Supply chain management is critical, as se...
FIFO stands for 'First In, First Out', a method for managing inventory and data processing.
FIFO ensures that the oldest inventory items are sold first, reducing spoilage.
In accounting, FIFO affects the cost of goods sold and inventory valuation.
Example: In a grocery store, perishable items like milk are sold before newer stock.
In data structures, FIFO is used in queues where the first element added is the first to...
Store 5S is a methodology for organizing and managing the workspace to improve efficiency and safety.
Sort: Remove unnecessary items from the store. Example: Discard expired products.
Set in order: Organize items for easy access. Example: Label shelves for quick identification.
Shine: Clean the workspace regularly. Example: Schedule daily cleaning routines.
Standardize: Establish procedures for maintaining organizatio...
Tolerance is the acceptable range of variation in a measurement or dimension.
Tolerance is the maximum and minimum limits within which a product or process must operate to meet specifications.
It ensures that parts fit together properly and function correctly.
Examples include the tolerance on the diameter of a shaft or the thickness of a sheet of metal.
Types of tolerance include bilateral, unilateral, and geometric.
Bilateral tolerance: allows for variation in both directions from the nominal dimension
Unilateral tolerance: allows for variation in only one direction from the nominal dimension
Geometric tolerance: specifies the allowable variation in form, profile, orientation, or location of a feature
There are two main types of casting: expendable mold casting and permanent mold casting.
Expendable mold casting includes sand casting, investment casting, and plaster mold casting.
Permanent mold casting includes die casting and centrifugal casting.
I applied via Recruitment Consulltant and was interviewed in Aug 2024. There was 1 interview round.
To check ball screw backlash, measure the amount of play or movement between the ball screw and the nut.
Use a dial indicator to measure the amount of axial play in the ball screw.
Check for any abnormal noise or vibration during operation, which could indicate excessive backlash.
Inspect the ball screw and nut for any signs of wear or damage that could contribute to backlash.
Adjust the preload on the ball screw if necess...
Spindle backless or runout can be checked using a dial indicator to measure the deviation in spindle rotation.
Mount a dial indicator on the machine spindle
Rotate the spindle and observe the dial indicator for any deviation
Measure the runout at different points on the spindle to ensure accuracy
Check for any loose components or worn out bearings that may cause runout
Consult the machine manual for specific instructions on...
Yes, I am able to work for 12 hours and am committed to maintaining productivity and focus throughout the shift.
I have experience working long shifts in previous roles, such as during peak production times.
I prioritize my health and take necessary breaks to stay energized and focused.
I am accustomed to the physical demands of operating CNC machines for extended periods.
In my last job, I often volunteered for overtime, ...
I appeared for an interview in Feb 2025, where I was asked the following questions.
The least count of a digital micrometer is the smallest measurement it can accurately display, typically 0.001 mm or 0.01 mm.
Least count is determined by the resolution of the micrometer's display.
Common least counts for digital micrometers are 0.001 mm or 0.01 mm.
For example, a micrometer with a least count of 0.001 mm can measure dimensions with high precision.
The least count affects the accuracy of measurements in e...
The least count of a manual vernier caliper is the smallest measurement it can accurately read, typically 0.02 mm or 0.01 mm.
The least count is calculated as the difference between one main scale division and one vernier scale division.
For a typical vernier caliper, 1 main scale division = 1 mm and 10 vernier scale divisions = 9 mm, giving a least count of 0.1 mm.
In some calipers, the least count can be 0.02 mm, meanin...
Gauges are instruments used to measure various parameters, with several types tailored for specific applications.
1. Pressure Gauge: Measures pressure in liquids and gases (e.g., tire pressure gauge).
2. Temperature Gauge: Measures temperature (e.g., thermocouple).
3. Depth Gauge: Measures depth (e.g., used in diving).
4. Thickness Gauge: Measures material thickness (e.g., ultrasonic thickness gauge).
5. Level Gauge: Measur...
Hydraulic pumps are used to convert mechanical energy into hydraulic energy, powering various machinery and equipment.
Used in construction equipment like excavators and bulldozers for lifting and moving heavy loads.
Common in manufacturing for operating presses and conveyors.
Essential in automotive systems for power steering and braking.
Utilized in aircraft for controlling landing gear and flaps.
I appeared for an interview in Jan 2024.
OEE can be calculated by multiplying Availability, Performance, and Quality.
Calculate Availability by dividing Operating Time by Planned Production Time.
Calculate Performance by dividing Actual Production by Maximum Production.
Calculate Quality by dividing Good Count by Total Count.
Multiply Availability, Performance, and Quality to get OEE.
Example: OEE = Availability x Performance x Quality
6 Sigma is a data-driven methodology for improving processes by reducing defects and variations.
6 Sigma aims to achieve near perfection in the products or services delivered by a company.
It focuses on identifying and eliminating causes of defects and minimizing variability in manufacturing and business processes.
6 Sigma uses statistical tools and techniques to measure and analyze process performance.
The goal of 6 Sigma...
TPM stands for Total Productive Maintenance, a proactive approach to maintenance that aims to maximize equipment effectiveness.
TPM focuses on preventing equipment breakdowns through regular maintenance and employee involvement
It involves setting up autonomous maintenance teams to take care of routine tasks
TPM also includes planned maintenance, quality maintenance, and focused improvement projects
Example: Implementing T...
CP Cpl stands for Cost Per Completed Lead, a metric used in marketing to measure the cost of generating a lead that has been successfully completed.
CP Cpl is calculated by dividing the total cost of generating leads by the number of completed leads.
It helps in determining the efficiency and effectiveness of lead generation campaigns.
For example, if a marketing campaign costs $1000 and generates 50 completed leads, the ...
I applied via Naukri.com and was interviewed in Nov 2023. There were 2 interview rounds.
I appeared for an interview in Mar 2024.
I applied via Campus Placement and was interviewed in Sep 2024. There was 1 interview round.
Find the root cause in every problem
Top trending discussions
Some of the top questions asked at the Bajaj Motors interview -
The duration of Bajaj Motors interview process can vary, but typically it takes about less than 2 weeks to complete.
based on 73 interview experiences
Difficulty level
Duration
based on 1k reviews
Rating in categories
Diploma Trainee Engineer
257
salaries
| ₹1.2 L/yr - ₹3.1 L/yr |
Junior Engineer
132
salaries
| ₹1.7 L/yr - ₹4.6 L/yr |
Junior Executive
87
salaries
| ₹1.8 L/yr - ₹4 L/yr |
Quality Engineer
84
salaries
| ₹1.2 L/yr - ₹3.6 L/yr |
Quality Inspector
78
salaries
| ₹1.3 L/yr - ₹3.2 L/yr |
Hyundai Motor India Limited
VE Commercial Vehicles
Honda
Yamaha Motor