Filter interviews by
Be the first one to contribute and help others!
I applied via Referral and was interviewed in Jul 2024. There were 3 interview rounds.
Purchase Assignment - Comparing PO's
The basic rule of purchase is to obtain goods or services at the best possible price, quality, and terms to meet the needs of the organization.
Identify the needs of the organization
Research and evaluate potential suppliers
Negotiate prices, terms, and contracts
Ensure timely delivery and quality of goods/services
Maintain good relationships with suppliers
The number of quotations taken before evaluation depends on the complexity of the purchase and the urgency of the requirement.
The number of quotations may vary based on the budget allocated for the purchase.
For routine purchases, 3-5 quotations may be sufficient for evaluation.
For high-value or complex purchases, more quotations may be required to ensure the best deal.
Consider factors such as quality, price, delivery t...
I expect the company to provide a supportive work environment, opportunities for growth, clear communication, and fair compensation.
Supportive work environment
Opportunities for growth
Clear communication
Fair compensation
Negotiable based on job responsibilities, industry standards, and benefits package.
Compensation is based on factors such as job responsibilities, industry standards, and benefits package.
Open to discussing compensation based on the overall package offered.
Seeking a fair and competitive salary based on market research and experience.
Flexible on compensation depending on the opportunities for growth and development.
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
posted on 3 May 2024
I applied via Indeed and was interviewed in Apr 2024. There were 3 interview rounds.
posted on 4 Aug 2024
Technical questions, mechanical question
I prefer a location that is easily accessible by public transportation and close to amenities.
Prefer location with good public transportation access
Close to amenities such as grocery stores, restaurants, etc.
Consider proximity to workplace or schools if applicable
posted on 12 Oct 2023
I applied via Naukri.com and was interviewed in Sep 2023. There were 2 interview rounds.
I have completed various projects at NWDA related to business development.
Developed new business strategies to increase revenue
Identified potential clients and formed partnerships
Analyzed market trends and competitor activities
Implemented marketing campaigns to promote products/services
Some problems of irrigation projects include water scarcity, inefficient water distribution, environmental impact, and maintenance issues.
Water scarcity leading to insufficient supply for irrigation needs
Inefficient water distribution systems causing uneven water distribution
Environmental impact such as soil salinization and water pollution
Maintenance issues like clogging of irrigation channels or equipment breakdowns
The latest model for solving sewage and drainage problems involves implementing green infrastructure solutions such as rain gardens and permeable pavement.
Green infrastructure solutions help manage stormwater runoff by allowing water to infiltrate into the ground instead of overwhelming sewer systems.
Examples of green infrastructure include rain gardens, bioswales, permeable pavement, and green roofs.
These solutions ca...
Currently involved in large-scale irrigation projects in rural areas
Implementing drip irrigation systems to conserve water
Utilizing solar-powered pumps for efficient water distribution
Working with local communities to educate on sustainable irrigation practices
posted on 27 Dec 2023
posted on 14 Oct 2023
I applied via Walk-in and was interviewed in Sep 2023. There were 2 interview rounds.
The weight of green concrete varies depending on the mix design and components used.
The weight of green concrete typically ranges from 140 to 150 pounds per cubic foot.
Factors such as the type and amount of aggregates, cement, water, and admixtures used can affect the weight.
Lightweight concrete can have a lower weight, while high-density concrete can be heavier.
The weight of green concrete is important for structural
The formula for tensile strength of concrete is based on the cross-sectional area and maximum load applied.
Tensile Strength = Maximum Load / Cross-sectional Area
The units for tensile strength are typically in MPa (megapascals)
Tensile strength is an important property of concrete for determining its ability to resist tension forces
For example, if a concrete specimen with a cross-sectional area of 100 square millimeters ...
The water cement ratio of concrete refers to the ratio of the weight of water to the weight of cement used in a concrete mix.
The water cement ratio is a crucial factor in determining the strength and durability of concrete.
A lower water cement ratio results in stronger and more durable concrete.
The ideal water cement ratio varies depending on the type of concrete mix and its intended use.
For example, a typical water ce...
IS code of steel refers to the Indian Standard code for steel materials and products.
IS 2062:2011 - Steel for general structural purposes
IS 1786:2008 - High strength deformed steel bars and wires for concrete reinforcement
IS 8500:1991 - Structural steel - Microalloyed (medium and high strength qualities)
posted on 6 Jan 2021
I applied via Approached by Company and was interviewed before Jan 2020. There were 2 interview rounds.
To submit client related documents, follow these steps:
Ensure all required documents are complete and accurate
Organize the documents in a logical order
Create a cover letter or email explaining the purpose of the submission
Use a secure method of transmission, such as email with password protection or a secure file-sharing platform
Confirm receipt of the documents with the client
Maintain a record of all submitted document
posted on 1 Nov 2023
I applied via AmbitionBox and was interviewed in Oct 2023. There was 1 interview round.
I have a total of 18 years of experience in power plant and oil and gas plant.
Experience includes working on various projects in power plant and oil and gas plant
Knowledge of electrical systems, equipment, and regulations in these industries
Hands-on experience in maintenance, troubleshooting, and project management
Strong understanding of safety protocols and procedures in high-risk environments
posted on 2 Jun 2023
PTR stands for Project Technical Report.
PTR is a document that summarizes the technical aspects of a project.
It includes details such as project scope, objectives, methodology, results, and conclusions.
PTRs are often used to communicate project progress and findings to stakeholders.
LT pole election rule refers to the guidelines and regulations for selecting and installing low tension electrical poles.
LT pole election rule specifies the criteria for selecting the appropriate location for installing low tension electrical poles.
It includes factors such as distance from buildings, roadways, and other structures, as well as soil conditions and accessibility.
Compliance with LT pole election rule ensur...
Coil earthing is a method of grounding electrical systems to prevent electric shock and ensure safety.
Coil earthing involves burying a coil of wire in the ground to create a low-resistance path for electrical currents to flow safely.
The depth at which the coil should be buried depends on factors such as soil type, moisture content, and local regulations.
Proper installation of coil earthing is essential to protect equip...
based on 17 reviews
Rating in categories
Civil Site Engineer
7
salaries
| ₹1.5 L/yr - ₹3.6 L/yr |
Safety Officer
6
salaries
| ₹3 L/yr - ₹4.6 L/yr |
Accountant
4
salaries
| ₹1.2 L/yr - ₹3.6 L/yr |
Mechanical Engineer
4
salaries
| ₹3.8 L/yr - ₹4.9 L/yr |
Project Engineer
3
salaries
| ₹4.5 L/yr - ₹4.8 L/yr |
Karam Industries
MaRS Planning & Engineering Services
Jse Engineering
Almeer Technical Services Co. W.L.L