Filter interviews by
I applied via Approached by Company and was interviewed before Jan 2020. There were 2 interview rounds.
To submit client related documents, follow these steps:
Ensure all required documents are complete and accurate
Organize the documents in a logical order
Create a cover letter or email explaining the purpose of the submission
Use a secure method of transmission, such as email with password protection or a secure file-sharing platform
Confirm receipt of the documents with the client
Maintain a record of all submitted document
Top trending discussions
posted on 10 Sep 2021
I applied via Walk-in and was interviewed before Sep 2020. There were 3 interview rounds.
Concrete is a composite material made up of cement, water, aggregates, and sometimes admixtures.
Concrete is used in construction for building foundations, walls, floors, and other structures.
It is a durable and strong material that can withstand heavy loads and harsh weather conditions.
The strength and durability of concrete can be improved by adding reinforcing materials such as steel bars or fibers.
There are differen...
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
posted on 18 Apr 2021
I applied via Company Website and was interviewed in Mar 2021. There were 5 interview rounds.
posted on 18 Jun 2021
I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.
posted on 7 Feb 2022
posted on 31 Oct 2022
I applied via Walk-in and was interviewed in Oct 2022. There were 2 interview rounds.
posted on 6 Oct 2024
I applied via Approached by Company and was interviewed before Oct 2023. There were 3 interview rounds.
I have always thought that it is my duty to be alert when the work is going on, to inspire people to follow the rules and safety properly.
The staff or workers in our company are very happy with the fact that the company keeps making a lot of changes for us from time to time.
We have a meeting every day at 8.15 pm, in which we discuss with each other what we can do to improve the company or in our own time.
I applied via Walk-in and was interviewed in May 2024. There was 1 interview round.
Site Engineer
7
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
Civil Site Engineer
7
salaries
| ₹1.8 L/yr - ₹3.5 L/yr |
Quantity Surveyor
4
salaries
| ₹4.4 L/yr - ₹6 L/yr |
Project Manager
3
salaries
| ₹22 L/yr - ₹24 L/yr |
Purchase Executive
3
salaries
| ₹2.4 L/yr - ₹2.4 L/yr |
Karam Industries
MaRS Planning & Engineering Services
Jse Engineering
Almeer Technical Services Co. W.L.L