My name is John Smith, a seasoned engineer with over 10 years of experience in the field.
Full name: John Smith
Years of experience: 10+
Engineering background
I have completed 10 projects in my career as a senior engineer.
Completed 10 projects in various industries such as automotive, aerospace, and telecommunications.
Led a team of engineers to successfully complete a project for a major automotive company.
Implemented new technologies in projects to improve efficiency and performance.
Collaborated with cross-functional teams to deliver projects on time and within budget.
I applied via Naukri.com and was interviewed in Dec 2019. There were 3 interview rounds.
I applied via Referral and was interviewed in Jan 2021. There was 1 interview round.
I passed HSLC in 2015.
I passed HSLC in 2015.
I completed my HSLC in 2015.
I cleared the HSLC examination in 2015.
I applied via Walk-in and was interviewed before Dec 2020. There were 5 interview rounds.
The neutral axis is the line where the stress is zero in a reinforced concrete structure.
The neutral axis divides the cross-section of the structure into two parts: the compression zone and the tension zone.
The depth of the neutral axis depends on the moment of resistance of the section and the bending moment applied.
The position of the neutral axis affects the amount of reinforcement required in the tension zone.
The n...
System implementation process involves planning, designing, testing, and deploying new software or hardware systems.
Planning phase involves defining project scope, setting goals, and creating a timeline.
Design phase includes creating system architecture, database design, and user interface.
Testing phase involves conducting various tests to ensure system functionality and performance.
Deployment phase includes installing...
Monitoring performance involves setting clear expectations, providing feedback, tracking progress, and addressing any issues that arise.
Set clear performance expectations for team members
Provide regular feedback on performance
Track progress towards goals and objectives
Address any performance issues promptly and constructively
I applied via Monster and was interviewed before Apr 2023. There were 3 interview rounds.
Question are hard in panel
I am currently earning a salary of $60,000 per year.
My current annual salary is $60,000
I am earning $5,000 per month
My total compensation package is $60,000
The company name is XYZ Corporation, a leading data analytics firm specializing in providing insights for businesses.
XYZ Corporation is a data analytics firm
Specializes in providing insights for businesses
It is very good in study for
Further studies.
I applied via Walk-in and was interviewed before Aug 2021. There was 1 interview round.
posted on 25 Feb 2022
I applied via Campus Placement and was interviewed before Feb 2021. There were 2 interview rounds.
A prolongation claim can be prepared by identifying the additional costs incurred due to delays and providing evidence to support the claim.
Identify the cause of delay and the impact it had on the project timeline and budget
Document all additional costs incurred due to the delay, including labor, materials, and equipment
Provide evidence to support the claim, such as daily reports, change orders, and correspondence with...
Delay analysis involves identifying the causes of delay and determining their impact on the project timeline.
Identify the critical path of the project
Determine the planned vs actual timeline for each activity
Identify any changes or disruptions that occurred during the project
Quantify the impact of each delay on the project timeline
Use a recognized methodology such as the As-Planned vs As-Built or Time Impact Analysis
Co...
based on 3 reviews
Rating in categories
Safety Officer
17
salaries
| ₹2.7 L/yr - ₹7.3 L/yr |
Planning Engineer
13
salaries
| ₹3 L/yr - ₹5.8 L/yr |
QA QC Engineer
13
salaries
| ₹3.3 L/yr - ₹5 L/yr |
Piping Engineer
8
salaries
| ₹2.4 L/yr - ₹4.8 L/yr |
Account Assistant
7
salaries
| ₹1.8 L/yr - ₹2.4 L/yr |
GAMMON INDIA
Karam Industries
Ray Engineering
MaRS Planning & Engineering Services