Upload Button Icon Add office photos

Filter interviews by

Atmastco Site Engineer Interview Questions and Answers

Updated 30 Jan 2024

Atmastco Site Engineer Interview Experiences

1 interview found

Site Engineer Interview Questions & Answers

user image Anonymous

posted on 30 Jan 2024

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Referral and was interviewed before Jan 2023. There were 2 interview rounds.

Round 1 - Technical 

(3 Questions)

  • Q1. About Privious company job experience.
  • Q2. About my technical abilities - just like bbs making, bill preparation etc.
  • Q3. When you can Join
Round 2 - HR 

(2 Questions)

  • Q1. Salary expectation
  • Q2. When you can join

Interview questions from similar companies

I applied via Recruitment Consultant and was interviewed before Dec 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. Pointer usages.
  • Q2. Stack implementation
  • Q3. Multi process

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident, and have open thought.

I applied via Approached by Company and was interviewed in Jul 2022. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(3 Questions)

  • Q1. All civil engineering construction into work site building construction
  • Q2. All civil engineering construction
  • Q3. RCC PCC into work from site experience on the civil engineering

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes I am also told me that job with me civil engineering building construction All site work experience into Road & building work from site work
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(8 Questions)

  • Q1. HT and lt line meking
  • Q2. Transfer installation and incoming line
  • Q3. Cip costing and testing
  • Q4. Pole grouting and moffing
  • Q5. Meter installation and meter check
  • Q6. Quality check and concreting resio
  • Q7. Outing going line
  • Q8. Cable abc cable

Interview Preparation Tips

Interview preparation tips for other job seekers - Network issue resolved
Interview experience
4
Good
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Fair and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Bar bending shedule in the cutting length
  • Ans. 

    Bar bending schedule is a document detailing the shape, quantity, and cutting length of reinforcement bars in a construction project.

    • Bar bending schedule includes details such as bar mark, diameter, shape, length, and quantity of reinforcement bars.

    • Cutting length is the length of the reinforcement bar required for a specific shape and size in a structure.

    • Calculations for cutting length are based on the dimensions and s...

  • Answered by AI
Round 2 - HR 

(1 Question)

  • Q1. I should have information about company

Interview Preparation Tips

Interview preparation tips for other job seekers - Yes
Interview experience
3
Average
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Aptitude n reasoning

Round 2 - Coding Test 

Basic DSA questions, like prime numbers

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Not Selected

I applied via LinkedIn and was interviewed in Jul 2024. There were 7 interview rounds.

Round 1 - Aptitude Test 

If vinay is 6 months old, how much old is his younger brother, 6 years different

Round 2 - Assignment 

About civil engineering, structure engineering, construction, bill of materials

Round 3 - Group Discussion 

About concrete, pro and cons

Round 4 - Assignment 

About Design Concrete

Round 5 - Case Study 

Case study leaning tower of pissa

Round 6 - HR 

(2 Questions)

  • Q1. What's your name
  • Ans. 

    My name is John Smith.

    • My first name is John

    • My last name is Smith

    • I go by the name John Smith

  • Answered by AI
  • Q2. When did you complete BE
Round 7 - Technical 

(2 Questions)

  • Q1. What's your name
  • Ans. 

    My name is John Smith.

    • Full name is John Smith

    • Common name

    • No middle name or initial

  • Answered by AI
  • Q2. How old are you
  • Ans. 

    I am 28 years old.

    • I am currently 28 years old.

    • My age is 28.

    • I was born in 1993.

  • Answered by AI

I applied via Job Portal and was interviewed in Jul 2022. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Tell me about your self

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident while speaking. Half knowledge is more dangerous than knowing nothing so speak on the know topics well

Interview Questionnaire 

3 Questions

  • Q1. About skilla
  • Q2. Project
  • Q3. Roles in

I applied via Approached by Company and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. What is n-tier architecture
  • Ans. 

    n-tier architecture is a software design pattern that divides an application into logical layers.

    • It separates presentation, application processing, and data management functions.

    • Each layer can be developed and maintained independently.

    • Examples include 3-tier and 4-tier architectures.

    • It improves scalability, maintainability, and flexibility of the application.

  • Answered by AI
Round 3 - HR 

(1 Question)

  • Q1. What is your expectation from company

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident while answering the questions and answers

Atmastco Interview FAQs

How many rounds are there in Atmastco Site Engineer interview?
Atmastco interview process usually has 2 rounds. The most common rounds in the Atmastco interview process are Technical and HR.

Tell us how to improve this page.

Atmastco Site Engineer Interview Process

based on 1 interview

Interview experience

4
  
Good
View more

Interview Questions from Similar Companies

TCS Interview Questions
3.7
 • 10.4k Interviews
Infosys Interview Questions
3.6
 • 7.5k Interviews
Wipro Interview Questions
3.7
 • 5.6k Interviews
HDFC Bank Interview Questions
3.9
 • 2.1k Interviews
Bharti Airtel Interview Questions
4.0
 • 843 Interviews
ITC Interview Questions
3.9
 • 545 Interviews
View all
Atmastco Site Engineer Salary
based on 4 salaries
₹3 L/yr - ₹5 L/yr
7% more than the average Site Engineer Salary in India
View more details

Atmastco Site Engineer Reviews and Ratings

based on 2 reviews

3.0/5

Rating in categories

3.7

Skill development

2.3

Work-life balance

2.3

Salary

2.3

Job security

2.3

Company culture

1.7

Promotions

3.0

Work satisfaction

Explore 2 Reviews and Ratings
Assistant Manager
9 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Deputy Manager
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Assistant Manager - Production
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Atmastco with

Reliance Industries

4.0
Compare

TCS

3.7
Compare

Hindustan Unilever

4.2
Compare

Infosys

3.6
Compare
Did you find this page helpful?
Yes No
write
Share an Interview