Bar bending schedule is a document detailing the shape, quantity, and cutting length of reinforcement bars in a construction project.
Bar bending schedule includes details such as bar mark, diameter, shape, length, and quantity of reinforcement bars.
Cutting length is the length of the reinforcement bar required for a specific shape and size in a structure.
Calculations for cutting length are based on the dimensions and s...
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
I applied via Naukri.com and was interviewed in Feb 2023. There were 2 interview rounds.
Look for key details such as dimensions, scale, title block, notes, and symbols.
Check the title block for project information, scale, and revision number.
Review the dimensions to understand the size and layout of the project.
Look for notes that provide important information or instructions.
Identify symbols that represent different elements or materials on the drawing.
Pay attention to any legends or key plans that expla
Observation of completed work is crucial to ensure quality and compliance with specifications.
Check if the work meets the design specifications
Inspect for any defects or deficiencies
Ensure proper materials and construction techniques were used
Verify that all safety standards were followed
Document any deviations or changes made during construction
I applied via Naukri.com and was interviewed in Oct 2022. There were 2 interview rounds.
I applied via Company Website and was interviewed in Dec 2021. There were 4 interview rounds.
Logical online questions
BGP stands for Border Gateway Protocol, a routing protocol used to exchange routing information between different networks.
BGP is used to connect different autonomous systems (AS) on the internet.
It is a path-vector protocol that selects the best path for data to travel based on various attributes such as AS path length and network policies.
BGP is commonly used by internet service providers (ISPs) to connect their netw...
I applied via Referral and was interviewed before Apr 2020. There were 4 interview rounds.
The density of steel is approximately 7.85 grams per cubic centimeter.
The density of steel is a measure of how much mass is contained in a given volume of steel.
It is commonly expressed in grams per cubic centimeter (g/cm³) or kilograms per cubic meter (kg/m³).
The density of steel can vary depending on the specific type and composition of the steel alloy.
For example, the density of carbon steel is generally around 7.85...
Formula to find unit weight of steel
Unit weight of steel = Density of steel x Volume of steel
Density of steel = 7850 kg/m³
Volume of steel = Area of steel x Length of steel
Example: Unit weight of a 10mm diameter steel bar of length 1 meter = 0.785 x 1 x 7850 = 6162.25 grams
Example: Unit weight of a 12mm diameter steel bar of length 12 meters = 0.888 x 12 x 7850 = 835584 grams
The frog size of a brick refers to the distance between the two parallel sides of a brick.
The frog size is typically measured in millimeters.
It is important for proper bricklaying and mortar application.
The size of the frog can vary depending on the type and size of the brick.
For example, a standard brick may have a frog size of around 10-15mm.
Some bricks may not have a frog at all.
based on 3 reviews
Rating in categories
Deputy Manager
2.8k
salaries
| ₹5.2 L/yr - ₹18.5 L/yr |
Assistant Manager
2.3k
salaries
| ₹3 L/yr - ₹12.8 L/yr |
Manager
1.5k
salaries
| ₹10 L/yr - ₹29.4 L/yr |
Senior Engineer
915
salaries
| ₹6.6 L/yr - ₹17 L/yr |
Team Lead
773
salaries
| ₹1.5 L/yr - ₹9.3 L/yr |
Tata Motors
Maruti Suzuki
Ashok Leyland
Hero MotoCorp