Filter interviews by
I appeared for an interview before Sep 2022.
Top trending discussions
posted on 15 Jul 2024
I applied via LinkedIn and was interviewed in Jan 2024. There were 3 interview rounds.
Common aptitude test
I applied via Naukri.com and was interviewed before Jan 2024. There were 2 interview rounds.
Experienced sales professional with a proven track record of exceeding targets and building strong client relationships.
Over 5 years of sales experience in the industry
Consistently met or exceeded sales targets by 20% each quarter
Built and maintained strong relationships with key clients, resulting in repeat business
Strong communication and negotiation skills
Proficient in analyzing market trends and developing sales st
To become a successful Area Sales Manager by consistently exceeding targets and leading a high-performing team.
Consistently exceed sales targets to drive revenue growth
Lead and motivate a high-performing sales team
Develop and implement strategic sales plans to expand market reach
Build strong relationships with key clients and stakeholders
Continuously improve sales processes and techniques
I applied via Recruitment Consulltant and was interviewed before Apr 2021. There were 2 interview rounds.
Manegement Topic of running our company
Current transformer secondary is open to prevent damage to the transformer and connected equipment.
An open secondary circuit prevents excessive current flow and protects the transformer from damage.
It allows for safe measurement and monitoring of current without risk of short circuits.
An open secondary also prevents damage to connected equipment by isolating it from high currents.
In case of a fault or overload, an open...
CT and PT are both electrical devices used in power systems, but they have different functions and applications.
CT stands for Current Transformer, while PT stands for Potential Transformer.
CTs are used to measure and transform high currents into manageable levels for instruments and protective relays.
PTs are used to measure and transform high voltages into low voltages for instruments and protective relays.
CTs are typi...
The single line diagram for HY to LT Panel diagram is a visual representation of the electrical connections and components in the system.
The single line diagram shows the flow of electrical power from the HY (High Voltage) side to the LT (Low Tension) side.
It includes the main components such as transformers, circuit breakers, switches, and control devices.
The diagram also indicates the interconnections between differe...
The number of circuit breakers used in an electrical system varies depending on the size and complexity of the system.
The number of circuit breakers used in an electrical system depends on factors such as the size of the system, the number of circuits, and the specific requirements of the building or facility.
Residential electrical systems typically have a main circuit breaker at the electrical panel, along with indivi...
In a power failure situation, effective management involves ensuring safety, communication, and contingency planning.
Ensure the safety of employees and customers by providing emergency lighting and clear evacuation procedures.
Maintain open lines of communication with staff, customers, and relevant authorities to provide updates and coordinate actions.
Implement contingency plans such as backup power sources, alternative...
B check in a generator refers to a comprehensive inspection and maintenance procedure to ensure its proper functioning.
B check involves a thorough examination of the generator's components, including the engine, fuel system, cooling system, electrical system, and control panel.
It includes tasks such as checking for leaks, inspecting belts and hoses, testing the battery, cleaning or replacing filters, and verifying prop...
posted on 9 Jun 2022
posted on 28 May 2023
I applied via Naukri.com and was interviewed before Apr 2023. There were 3 interview rounds.
Dispatcher function is responsible for managing and coordinating tasks or requests within a system.
Coordinates tasks or requests to appropriate resources
Prioritizes tasks based on urgency or importance
Tracks progress and updates stakeholders
Handles incoming requests and assigns them to available resources
Examples: task scheduler in an operating system, job dispatcher in a computing cluster
Cloning involves the process of creating a genetically identical copy of an organism.
Isolate the DNA from the organism to be cloned
Insert the DNA into a vector, such as a plasmid
Introduce the vector into a host cell, such as a bacteria or yeast
Allow the host cell to replicate, creating multiple copies of the DNA
Grow the host cell into a full organism with the same genetic makeup as the original
Identify, analyze, brainstorm solutions, implement, evaluate, and document.
Identify the problem by gathering information and understanding the root cause.
Analyze the problem to determine the best course of action.
Brainstorm potential solutions with team members or stakeholders.
Implement the chosen solution and monitor its effectiveness.
Evaluate the outcome to ensure the problem is resolved and document the process for
Yes, I am ready to reallocate for the right opportunity.
I am open to relocating for the right job opportunity that aligns with my career goals.
I have experience moving for previous roles and am comfortable with the process.
I understand the benefits of relocating, such as new experiences and career growth.
Total questions - 5
Quantitative, Logical Reasoning and English
based on 1 interview
Interview experience
Service Engineer
16
salaries
| ₹1.7 L/yr - ₹3.8 L/yr |
Design Engineer
9
salaries
| ₹1.9 L/yr - ₹3.4 L/yr |
Executive Accountant
7
salaries
| ₹0.9 L/yr - ₹2.5 L/yr |
Assistant Sales Manager
7
salaries
| ₹4.2 L/yr - ₹6.5 L/yr |
Quality Engineer
6
salaries
| ₹2.2 L/yr - ₹6 L/yr |
JBS Enterprises
Essae Teraoka
HOLITECH INDIA
Fujitec