I saved project costs by optimizing resource allocation, negotiating with vendors, and implementing cost-effective solutions.
Optimized resource allocation to reduce unnecessary expenses
Negotiated with vendors for better pricing and discounts
Implemented cost-effective solutions without compromising quality
Utilized technology to streamline processes and reduce manual labor costs
Rate analysis is the process of determining the rates of various items of work to calculate the cost of a project.
Rate analysis involves breaking down the cost of materials, labor, and equipment for each item of work in a project.
It helps in estimating the total cost of a project and in preparing accurate project budgets.
Rate analysis is essential for comparing different bids from contractors and ensuring fair pricing.
...
Top trending discussions
I was interviewed in Feb 2024.
Introduction
posted on 4 Feb 2025
I was interviewed before Feb 2024.
I applied via Company Website and was interviewed before Apr 2023. There were 2 interview rounds.
Scheduling in instrumentation and control for rotating equipment involves creating a detailed plan to ensure proper maintenance and operation.
Develop a detailed schedule outlining maintenance tasks for each piece of rotating equipment
Coordinate with operations and maintenance teams to ensure minimal downtime during maintenance activities
Utilize software tools such as CMMS to track maintenance activities and schedule fu...
Surge control in compressor is essential to prevent damage and maintain efficiency.
Surge control involves monitoring and adjusting the flow rate of the compressor to prevent surging.
Methods for surge control include using anti-surge valves, recycle valves, and variable speed drives.
Surge control systems often use sensors to detect changes in pressure and flow rate, triggering adjustments to prevent surging.
Proper surge...
Synchronisation in generators is the process of matching the voltage, frequency, and phase angle of multiple generators before connecting them in parallel.
Synchronisation ensures that the generators are operating in sync to prevent damage or power loss.
Key factors for synchronisation include voltage, frequency, and phase angle matching.
Synchronisation is typically done using synchronising lamps, synchroscopes, or autom...
I applied via Company Website and was interviewed in Jan 2022. There were 5 interview rounds.
My concrete work level is excellent and I have experience in various finishing techniques.
I have experience in pouring and leveling concrete for foundations, walls, and slabs.
I am skilled in using various finishing techniques such as troweling, stamping, and staining.
I pay close attention to detail to ensure a smooth and even finish.
I am knowledgeable in the proper curing and sealing of concrete to ensure its longevity...
BBS stands for Bar Bending Schedule, which is a detailed list of reinforcement bars in a structure.
BBS is used in drawing work to ensure the correct amount of reinforcement is used in a structure.
It includes details such as bar diameter, length, shape, and placement.
BBS helps in estimating the amount of steel required for a project and also helps in cost estimation.
It is an important part of the construction process an...
I applied via Walk-in and was interviewed before Jul 2022. There were 3 interview rounds.
I applied via Naukri.com and was interviewed in Nov 2021. There was 1 interview round.
Impedance is the total opposition to the flow of alternating current in a circuit, while reactance is the opposition to the flow of alternating current caused by capacitance or inductance.
Impedance is a combination of resistance and reactance in a circuit.
Reactance is the opposition to the flow of alternating current caused by capacitance or inductance.
Capacitive reactance is the opposition to the flow of alternating c...
Plant load factor is calculated by dividing the actual energy generated by the maximum possible energy that could have been generated.
Plant load factor = Actual energy generated / Maximum possible energy that could have been generated
Maximum possible energy is calculated by multiplying the rated capacity of the plant with the number of hours in a given time period
Plant load factor is expressed as a percentage
It is used...
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Design Engineer
82
salaries
| ₹3.6 L/yr - ₹11.2 L/yr |
Assistant Design Engineer
52
salaries
| ₹3 L/yr - ₹6 L/yr |
Structural Design Engineer
50
salaries
| ₹3.3 L/yr - ₹12.5 L/yr |
Consultant Engineer
47
salaries
| ₹4.4 L/yr - ₹10 L/yr |
Senior Manager
29
salaries
| ₹12.5 L/yr - ₹30 L/yr |
TCS
Infosys
Wipro
HCLTech