Filter interviews by
Be the first one to contribute and help others!
A firewall is a network security system that monitors and controls incoming and outgoing network traffic based on predetermined security rules.
Acts as a barrier between a trusted internal network and untrusted external network
Filters network traffic based on rules set by the administrator
Can be hardware-based or software-based
Examples include Cisco ASA, Palo Alto Networks, and Windows Firewall
I am a dedicated and detail-oriented PMO Analyst with a strong background in project management and data analysis.
I have a Bachelor's degree in Business Administration with a focus on project management.
I have experience in creating and maintaining project plans, tracking project progress, and analyzing project data.
I am proficient in using project management tools such as Microsoft Project and Jira.
I have excellent co...
I applied via Approached by Company and was interviewed in Apr 2024. There were 4 interview rounds.
I have 5 years of experience handling and managing plant materials in a warehouse setting.
Managed inventory of plant materials including seeds, fertilizers, and pesticides
Ensured proper storage conditions to maintain quality and prevent spoilage
Implemented inventory tracking systems to monitor stock levels and reorder supplies as needed
Collaborated with suppliers to ensure timely delivery of plant materials
Performed re...
Strore group comunication
posted on 20 Jul 2024
I applied via Referral and was interviewed in Mar 2024. There was 1 interview round.
FIDIC contract is a standard form of contract used in the construction industry.
FIDIC stands for International Federation of Consulting Engineers.
It provides a framework for the rights and obligations of parties involved in construction projects.
Commonly used in international construction projects.
Includes different types of contracts such as Red Book, Yellow Book, and Silver Book.
Variation refers to the degree of difference or deviation from a standard or expected value.
Variation can be caused by factors such as changes in materials, labor costs, or market conditions.
It is important for cost managers to analyze variation in order to understand the reasons behind cost fluctuations.
Examples of variation include price changes for raw materials, unexpected delays in project timelines, and fluctuati
GCC stands for Guaranteed Cost Contract and SCC stands for Self-Insured Retention Contract in construction projects.
GCC is a type of contract where the contractor is paid a fixed amount regardless of the actual project costs.
SCC is a type of contract where the contractor is responsible for a certain amount of project costs before insurance coverage kicks in.
GCC provides cost certainty for the project owner while SCC ma...
MIS stands for Management Information System, which is a computerized database that collects, processes, and presents information to support decision-making.
MIS helps in organizing and analyzing data to provide managers with information needed for decision-making.
It includes software systems, hardware, procedures, and people involved in the collection, processing, and dissemination of information.
Examples of MIS includ...
posted on 6 Jun 2024
Hot mix plant Apolo Amman Details.
The Paver 1800-2 is equipped with a powerful engine designed for heavy-duty paving operations.
The Paver 1800-2 is powered by a diesel engine for efficient performance.
The engine has a displacement of X cubic inches, providing ample power for paving tasks.
It features a turbocharger for increased power output and fuel efficiency.
The engine is designed to meet emission standards and reduce environmental impact.
Regular mai...
posted on 8 Feb 2024
Testing is necessary to ensure the proper functioning, safety, and reliability of electrical equipment.
Testing helps identify any faults or defects in the equipment.
It ensures that the equipment meets the required standards and specifications.
Testing helps prevent accidents and ensures the safety of users.
Regular testing helps in detecting any potential issues before they become major problems.
It helps in maintaining t...
Safety awareness is the understanding and knowledge of potential hazards and the importance of taking precautions to prevent accidents or injuries.
Safety awareness involves being aware of potential hazards in the workplace or environment.
It includes understanding safety procedures and protocols.
It involves recognizing and reporting unsafe conditions or behaviors.
Safety awareness also includes promoting a safety culture...
The shutdown process refers to the systematic procedure followed to safely stop and deactivate electrical systems or equipment.
The shutdown process involves identifying the equipment to be shut down and ensuring proper isolation from power sources.
It may include following specific procedures provided by equipment manufacturers or industry standards.
Shutdown procedures often involve turning off power supply, closing val...
The shutdown process refers to the systematic procedure followed to safely stop and deactivate electrical systems or equipment.
The shutdown process involves proper planning and coordination to ensure the safety of personnel and equipment.
It typically includes steps such as isolating power sources, securing equipment, and performing necessary maintenance or repairs.
Examples of shutdown processes can vary depending on th...
String rectification is the process of correcting faults in electrical circuits by identifying and fixing the faulty components.
String rectification involves troubleshooting electrical circuits to identify faults.
Once the faults are identified, the faulty components are repaired or replaced.
Common faults in electrical circuits include short circuits, open circuits, and faulty components.
Fault finding is a systematic pr...
posted on 26 Aug 2024
I belong to the state of California.
I am a native of California.
I have lived in California for most of my life.
I completed my education in California, including my engineering degree.
I have worked on various construction projects in California.
I am familiar with the building codes and regulations specific to California.
I applied via Approached by Company and was interviewed in Apr 2024. There were 2 interview rounds.
Which type of work and how to manage work on data Lake through NHAI One Application
Check and mention work on site dally from NHAI Data Lake
posted on 13 Dec 2023
The scope of the project is to streamline billing and planning processes for the Assistant Manager role.
Develop and implement efficient billing procedures
Create and maintain billing schedules
Ensure accurate and timely invoicing
Collaborate with cross-functional teams to optimize planning strategies
Identify and resolve billing discrepancies
Analyze data to identify areas for improvement
Implement cost-saving measures
Train ...
based on 26 reviews
Rating in categories
Production Officer
7
salaries
| ₹2.8 L/yr - ₹3.4 L/yr |
CNC Operator
5
salaries
| ₹1.4 L/yr - ₹2.2 L/yr |
Quality Officer
5
salaries
| ₹3 L/yr - ₹5.5 L/yr |
Assistant Manager
4
salaries
| ₹4.4 L/yr - ₹6.5 L/yr |
Deputy Manager
4
salaries
| ₹7.1 L/yr - ₹9 L/yr |
Graphite India
HEG
PCBL Chemical Limited
Rain Industries