Filter interviews by
I applied via Naukri.com and was interviewed before Jun 2020. There were 5 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Apr 2021. There were 2 interview rounds.
How to maintain control spillage
F&V stages refer to the different stages of fruits and vegetables from harvesting to consumption.
The first stage is harvesting, where the produce is picked from the plant.
The second stage is grading, where the produce is sorted based on quality and size.
The third stage is packaging, where the produce is packed for transportation and storage.
The fourth stage is transportation, where the produce is transported to the mar...
I applied via Naukri.com and was interviewed before Jan 2021. There were 2 interview rounds.
About store procedures and systems
Planning in inventory management involves forecasting demand, setting inventory levels, and replenishing stock.
Forecasting demand based on historical sales data and market trends
Setting inventory levels to balance customer demand and cost of holding inventory
Replenishing stock in a timely manner to avoid stockouts and overstocking
Using inventory management software to track inventory levels and automate replenishment
Re...
I applied via Newspaper Ad and was interviewed before Jul 2021. There were 3 interview rounds.
To measure a full truck load of sand, calculate the volume in cubic feet (cft) by multiplying the length, width, and height of the truck bed.
Measure the length, width, and height of the truck bed
Multiply the three measurements to get the volume in cubic feet (cft)
For example, if the truck bed is 10 feet long, 5 feet wide, and 3 feet high, the volume would be 150 cubic feet (10 x 5 x 3)
Ensure the truck is loaded evenly
Pls tell me one of your achievements in your last employer ?
I applied via Approached by Company and was interviewed in Apr 2023. There was 1 interview round.
If clients are unable to prioritize work, the project manager can use various techniques to prioritize tasks.
Assess the impact and urgency of each task
Consider the project objectives and deliverables
Consult with the project team and stakeholders
Use prioritization techniques like the MoSCoW method or the Eisenhower Matrix
Allocate resources based on priority
Regularly review and adjust priorities as needed
MOSCOW is a prioritization technique used in project management to categorize requirements based on their importance.
MOSCOW stands for Must have, Should have, Could have, and Won't have
It helps in identifying the critical requirements and prioritizing them accordingly
Must have requirements are essential and cannot be compromised, while Won't have requirements are not necessary
For example, in a software development proj...
Invest is the act of allocating resources, usually money, with the expectation of generating an income or profit.
Investing involves taking risks in order to potentially earn a return on your investment.
There are many different types of investments, including stocks, bonds, real estate, and commodities.
Investing requires careful research and analysis to make informed decisions.
Diversification is important to minimize ri...
I applied via Referral and was interviewed before Jun 2023. There was 1 interview round.
1. Case study: Avg ratings on zomato decreasing. Analyze why?
Answer: First clarify what rating it is about and clarified it is post order satisfaction rating related.
Proceeded to check the source of the drop in ratings: Region of user, user demographics (age, gender), Customer type (old/new) and from restaurants/ type of restaurants.
Then deep dived into reasons of drop like pricing, quality and quantity
I applied via Referral and was interviewed before Sep 2022. There were 2 interview rounds.
I appeared for an interview in Sep 2021.
Critical resource risk management involves identifying potential risks, assessing their impact, and implementing mitigation strategies.
Identify critical resources and potential risks
Assess the impact of each risk on the critical resources
Develop mitigation strategies to minimize the impact of identified risks
Implement the mitigation strategies and monitor their effectiveness
Regularly review and update the risk manageme
I applied via Naukri.com and was interviewed in May 2023. There were 3 interview rounds.
Strategy, Operations, Success stories, Coding, Hr round, apptitude
General aptitude, your past experience, your role
I applied via Campus Placement and was interviewed in Sep 2023. There were 2 interview rounds.
Started with introduction about company and role .After gievn topic for group discussion topic ott vs theatre
Merchandiser
6
salaries
| ₹2.2 L/yr - ₹4.5 L/yr |
HR Executive
4
salaries
| ₹3.2 L/yr - ₹4.6 L/yr |
Manager Quality Control
4
salaries
| ₹4.3 L/yr - ₹5.4 L/yr |
Junior Merchandiser
4
salaries
| ₹1.8 L/yr - ₹3.8 L/yr |
E Commerce Manager
4
salaries
| ₹4.8 L/yr - ₹6.7 L/yr |
Quess
L&T Construction
Ekart Logistics
Udaan