The slope at bathroom flooring should be towards the drain to ensure proper drainage.
The slope should be at least 1/4 inch per foot towards the drain.
The slope should be consistent throughout the bathroom flooring.
The slope should be checked with a level before installing tiles or other flooring materials.
Improper slope can lead to water pooling and damage to the flooring and subflooring.
There are various tests for cement to ensure its quality and strength.
Fineness test to measure the particle size of cement
Setting time test to determine the time taken for cement to set
Soundness test to check the ability of cement to resist volume changes
Compressive strength test to measure the strength of cement
Chemical analysis test to determine the chemical composition of cement
posted on 5 Dec 2021
I applied via Walk-in and was interviewed before Dec 2020. There were 2 interview rounds.
Seeking new challenges and opportunities for growth in a more dynamic work environment.
Desire for professional growth and development
Seeking new challenges and projects to work on
Looking for a more dynamic and innovative work environment
Opportunity to learn new skills and technologies
Desire for better work-life balance
I have 5 years of experience in building construction.
I have worked on various residential and commercial projects.
Managed construction teams and ensured projects were completed on time and within budget.
Experience with reading blueprints, conducting site inspections, and coordinating with architects and subcontractors.
Compressive strength is the ability of a material to withstand loads that reduce the size of the material without undergoing any deformation.
Compressive strength is a measure of the maximum load a material can withstand under compression before failure.
It is an important property in construction materials like concrete, masonry, and rock.
Compressive strength is typically measured in units of force per unit area, such a...
Density of steel is approximately 7850 kg/m^3.
Density of steel is typically around 7850 kg/m^3.
The density of steel can vary slightly depending on the specific alloy.
Density is an important factor in determining the weight of steel structures.
Curing of columns typically takes 7 days.
Columns generally require 7 days of curing to achieve the desired strength.
Curing helps in reducing cracks and increasing the durability of the concrete.
Proper curing is essential for the long-term performance of the column.
Factors like temperature, humidity, and type of concrete used can affect the curing time.
based on 1 review
Rating in categories
Civil Site Engineer
21
salaries
| ₹2.2 L/yr - ₹7.2 L/yr |
Assistant Manager
6
salaries
| ₹3.3 L/yr - ₹4 L/yr |
Accountant
5
salaries
| ₹3.2 L/yr - ₹4.2 L/yr |
Estate Manager
5
salaries
| ₹3.6 L/yr - ₹4.8 L/yr |
Site Engineer
5
salaries
| ₹2.9 L/yr - ₹4.2 L/yr |
DLF
Godrej Properties
Tata Group
Adani Group