Soil compaction test report is a document submitted by PMC to assess the density and moisture content of soil.
The report includes details of the test method used, such as Proctor test or California Bearing Ratio (CBR) test.
It provides information about the compaction equipment used, such as a vibratory roller or a plate compactor.
The report presents the results of the test, including the dry density, moisture content, ...
Daily concrete cube testing whiteness by PMC
PMC stands for Project Management Consultant
Concrete cube testing is a common practice in construction projects
Whiteness testing is done to assess the quality and consistency of the concrete mix
Daily testing ensures that the concrete meets the required standards
PMC oversees the testing process to ensure compliance with project specifications
Shuttering check by PMC with witnesses before concrete pour.
PMC (Project Management Consultant) conducts a shuttering check before concrete pour.
Witnesses are present during the shuttering check to ensure compliance.
Shuttering check involves inspecting the formwork or molds used to shape the concrete.
The purpose is to ensure that the formwork is properly constructed and aligned.
This helps prevent any issues or defects
The daily safety report submitted by PMC is a crucial document that provides an overview of safety measures and incidents on a daily basis.
The daily safety report helps in monitoring and improving safety practices on the project site.
It includes information about any accidents, near misses, or safety violations that occurred during the day.
The report also highlights the corrective actions taken to address the identifie...
TMT steel BBS refers to the reinforcement bar bending schedule as per the drawing.
TMT steel BBS is a detailed document that specifies the quantity, shape, and dimensions of reinforcement bars required for a construction project.
It helps in accurately placing and bending the reinforcement bars as per the design.
The BBS includes information such as bar mark, bar size, length, shape, and bending details.
It ensures the str...
The site conditions as per planning refer to the specific conditions and requirements outlined in the project plan.
Site conditions as per planning include factors such as topography, soil conditions, and environmental considerations.
These conditions are taken into account during the planning phase to ensure the feasibility and success of the project.
For example, if the site is located in a flood-prone area, the plannin...
Top trending discussions
posted on 5 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
Software or tool test
I applied via Company Website and was interviewed in Dec 2023. There were 3 interview rounds.
Mathematics - 1 2 3, English, structural
I applied via Naukri.com and was interviewed in Apr 2023. There were 2 interview rounds.
OEE is a measure of manufacturing productivity. Improving it involves reducing downtime, increasing speed, and minimizing defects.
Calculate OEE by multiplying availability, performance, and quality rates.
Reduce downtime by improving maintenance and scheduling.
Increase speed by optimizing processes and equipment.
Minimize defects by improving quality control and training.
Use data analysis to identify areas for improvemen...
Problem solving tools are techniques used to identify, analyze and solve problems.
Root Cause Analysis (RCA) helps identify the underlying cause of a problem
Fishbone Diagrams help identify the potential causes of a problem
5 Whys technique helps identify the root cause of a problem by asking 'why' five times
Pareto Analysis helps prioritize problems based on their impact
Brainstorming helps generate ideas and solutions to ...
TPM is implemented in shopfloor through a structured approach involving 5S, autonomous maintenance, and continuous improvement.
TPM involves a cultural shift towards proactive maintenance and continuous improvement
The implementation process starts with 5S to create a clean and organized workplace
Autonomous maintenance involves empowering operators to perform routine maintenance tasks
TPM also involves planned maintenance...
posted on 22 Nov 2023
I applied via Naukri.com and was interviewed before Nov 2022. There were 3 interview rounds.
Basic reasoning questions
based on 8 reviews
Rating in categories
Safety Officer
30
salaries
| ₹2 L/yr - ₹5 L/yr |
Junior Engineer
19
salaries
| ₹1.2 L/yr - ₹3.2 L/yr |
Senior Engineer
14
salaries
| ₹3.6 L/yr - ₹7.2 L/yr |
Billing Engineer
11
salaries
| ₹1.8 L/yr - ₹6.7 L/yr |
Site Engineer
10
salaries
| ₹4 L/yr - ₹5.1 L/yr |
Patel Engineering
Nagarjuna Construction Company
Simplex Infrastructures
Punj Lloyd