Soil compaction test report is a document submitted by PMC to assess the density and moisture content of soil.
The report includes details of the test method used, such as Proctor test or California Bearing Ratio (CBR) test.
It provides information about the compaction equipment used, such as a vibratory roller or a plate compactor.
The report presents the results of the test, including the dry density, moisture content, ...
Daily concrete cube testing whiteness by PMC
PMC stands for Project Management Consultant
Concrete cube testing is a common practice in construction projects
Whiteness testing is done to assess the quality and consistency of the concrete mix
Daily testing ensures that the concrete meets the required standards
PMC oversees the testing process to ensure compliance with project specifications
Shuttering check by PMC with witnesses before concrete pour.
PMC (Project Management Consultant) conducts a shuttering check before concrete pour.
Witnesses are present during the shuttering check to ensure compliance.
Shuttering check involves inspecting the formwork or molds used to shape the concrete.
The purpose is to ensure that the formwork is properly constructed and aligned.
This helps prevent any issues or defects
The daily safety report submitted by PMC is a crucial document that provides an overview of safety measures and incidents on a daily basis.
The daily safety report helps in monitoring and improving safety practices on the project site.
It includes information about any accidents, near misses, or safety violations that occurred during the day.
The report also highlights the corrective actions taken to address the identifie...
TMT steel BBS refers to the reinforcement bar bending schedule as per the drawing.
TMT steel BBS is a detailed document that specifies the quantity, shape, and dimensions of reinforcement bars required for a construction project.
It helps in accurately placing and bending the reinforcement bars as per the design.
The BBS includes information such as bar mark, bar size, length, shape, and bending details.
It ensures the str...
The site conditions as per planning refer to the specific conditions and requirements outlined in the project plan.
Site conditions as per planning include factors such as topography, soil conditions, and environmental considerations.
These conditions are taken into account during the planning phase to ensure the feasibility and success of the project.
For example, if the site is located in a flood-prone area, the plannin...
Top trending discussions
posted on 5 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Dec 2022. There were 3 interview rounds.
I expect a competitive salary based on my experience, skills, and the responsibilities of the role.
I have researched the average salary range for senior engineers in this industry and location.
I have considered my years of experience and expertise in the field.
I am open to discussing the salary package based on the overall compensation package, including benefits and opportunities for growth.
I am confident that my skil...
I applied via Walk-in and was interviewed before Jan 2022. There were 2 interview rounds.
I am unable to provide my previous salary as it is confidential. However, I am expecting a competitive salary based on my qualifications and experience.
My previous salary is confidential and I am unable to disclose it.
I am expecting a salary that is commensurate with my qualifications and experience.
I am open to discussing salary expectations during the negotiation process.
I believe that a competitive salary is importa...
The previous projects involved various types of formwork with a total shuttering area of approximately 10,000 square meters.
Used traditional timber formwork for a residential building project
Implemented modular steel formwork for a commercial complex
Utilized aluminum formwork for a high-rise construction
Employed tunnel formwork for an underground structure
posted on 16 Apr 2024
I applied via Company Website and was interviewed before Apr 2023. There was 1 interview round.
based on 1 interview
Interview experience
based on 9 reviews
Rating in categories
Safety Officer
30
salaries
| ₹2 L/yr - ₹5 L/yr |
Junior Engineer
18
salaries
| ₹1 L/yr - ₹3.2 L/yr |
Senior Engineer
15
salaries
| ₹4.3 L/yr - ₹7.2 L/yr |
Billing Engineer
13
salaries
| ₹1.8 L/yr - ₹6.7 L/yr |
Site Engineer
10
salaries
| ₹4 L/yr - ₹5.1 L/yr |
J K Fenner
Saudi Binladin Group
Bahwan Engineering
Eversendai