I applied via Naukri.com and was interviewed in Mar 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 5 Dec 2023
I applied via Walk-in and was interviewed before Dec 2022. There were 2 interview rounds.
I applied via Referral and was interviewed in Dec 2022. There were 3 interview rounds.
I expect a competitive salary based on my experience, skills, and the responsibilities of the role.
I have researched the average salary range for senior engineers in this industry and location.
I have considered my years of experience and expertise in the field.
I am open to discussing the salary package based on the overall compensation package, including benefits and opportunities for growth.
I am confident that my skil...
posted on 17 Oct 2022
I applied via Approached by Company and was interviewed before Oct 2021. There were 6 interview rounds.
General knowledge, Maths, reasoning, General English
Current topic, games, Election, Language Barrier
Perticular equipment/process detailed knowledge.
I applied via Recruitment Consulltant and was interviewed before May 2021. There was 1 interview round.
Blinding is the process of isolating a section of a pipeline or equipment to prevent flow or contamination.
Temporary or permanent blinds can be used depending on the situation
Common types of blinds include spectacle blinds, paddle blinds, and bleed rings
Blinding is often used during maintenance or repair work to ensure safety
Blinding can also be used to prevent contamination during storage or transportation
Blinding can...
Before starting work in a refinery equipment, certain procedures must be followed.
Obtain a work permit
Perform a safety check of the equipment
Ensure proper personal protective equipment is worn
Verify that all valves are in the correct position
Confirm that the equipment is properly grounded
Check for any leaks or abnormal conditions
Communicate with other workers in the area
Follow all established procedures and protocols
I will follow the emergency response plan and evacuate the area immediately.
Activate the alarm system to alert others in the area
Put on personal protective equipment (PPE) including a respirator
Evacuate the area immediately and move to a safe location
Notify emergency services and follow the emergency response plan
Monitor the situation and wait for the all-clear signal before returning to the area
I would advise my workers to start unbolting the heat exchanger head from the top and work their way down.
Start from the top and work your way down
Use appropriate tools and safety equipment
Follow proper procedures and guidelines
Ensure all bolts are properly labeled and accounted for
Inspect the gasket and replace if necessary
I applied via Naukri.com and was interviewed in May 2021. There were 3 interview rounds.
The height of top guard rails, mid rails, and toe board rails varies depending on the specific application and regulations.
The height of top guard rails is typically between 42 and 45 inches above the walking surface.
Mid rails are typically located halfway between the top rail and the walking surface.
Toe board rails are typically between 4 and 6 inches high and are installed at the base of the guardrail system.
Specific...
Safe working load is the maximum weight a structure or equipment can safely support without risk of failure.
SWL is determined by factors such as material strength, design, and intended use.
Formula for SWL varies depending on the type of equipment or structure.
For example, the SWL formula for a crane may take into account the boom length, angle, and weight distribution.
It is important to always follow the manufacturer's...
based on 1 review
Rating in categories
Safety Officer
30
salaries
| ₹2 L/yr - ₹5 L/yr |
Junior Engineer
18
salaries
| ₹1 L/yr - ₹3.2 L/yr |
Senior Engineer
15
salaries
| ₹4.3 L/yr - ₹7.2 L/yr |
Billing Engineer
13
salaries
| ₹1.8 L/yr - ₹6.7 L/yr |
Site Engineer
10
salaries
| ₹4 L/yr - ₹5.1 L/yr |
Patel Engineering
Nagarjuna Construction Company
Simplex Infrastructures
Punj Lloyd