Filter interviews by
I applied via Referral and was interviewed in Aug 2019. There were 3 interview rounds.
Yes, multiple MMEs can be configured in a single eNodeB.
Multiple MMEs (Mobility Management Entities) can be configured in a single eNodeB (Evolved Node B) in LTE networks.
This configuration allows for load balancing and redundancy.
Each MME can handle control plane signaling for a subset of connected UEs (User Equipment).
The eNodeB distributes the UEs among the available MMEs based on various factors like load and capac...
Check network connectivity, restart MME, check configuration settings.
Check if there is any issue with the network connectivity
Restart the MME and check if the alarm disappears
Verify the configuration settings of the MME
Check if there is any hardware failure
Contact the vendor for further assistance
Integration process refers to the process of combining different systems or components into a single unified system.
Integration involves connecting different systems or components to work together seamlessly
It can involve data integration, application integration, or system integration
Integration can be achieved through APIs, middleware, or custom code
Examples of integration include integrating a CRM system with a mark...
I applied via Walk-in and was interviewed before Mar 2020. There was 1 interview round.
I applied via Company Website and was interviewed before Feb 2021. There were 2 interview rounds.
Ba complete
I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.
Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.
The vessel or pipeline is filled with water and pressurized to a specified level
The pressure is held for a specified amount of time to check for leaks or deformations
The test is usually performed before commissioning or after repairs
The test pressure and duration are deter...
HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.
Ensure the HDD is compatible with the computer system
Physically install the HDD in the appropriate bay
Connect the necessary cables to the HDD and motherboard
Configure the HDD in the BIOS settings
Format the HDD and install the operating system
Test the HDD for proper functionality
posted on 30 Aug 2023
T-code repleted acknowledge refers to acknowledging all transaction codes in a system.
Acknowledge all T-codes in the system
Ensure all transactions are properly recorded and acknowledged
Review and confirm completion of all T-code transactions
I applied via Recruitment Consulltant and was interviewed in Dec 2021. There were 3 interview rounds.
The amount of sqm plastering done by a Mason per day depends on various factors such as the size of concrete blocks, workability, painting, and gypsum work.
The size of concrete blocks can affect the amount of plastering done per day.
Workability of the plastering material can also affect the speed of work.
Painting and gypsum work can add to the time required for plastering.
It is difficult to give an exact number for the...
To work in a metro city with an EPB machine, one must be familiar with its operation and maintenance.
Understand the operation of the EPB machine and follow safety protocols
Regularly maintain and inspect the EPB machine to ensure proper functioning
Coordinate with other team members and stakeholders for efficient project execution
Stay updated on the latest technology and advancements in EPB machines
I applied via Naukri.com and was interviewed before Jun 2023. There were 2 interview rounds.
based on 1 interview
Interview experience
based on 33 reviews
Rating in categories
Management Trainee
8
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Manager
7
salaries
| ₹0 L/yr - ₹0 L/yr |
Assistant Trading Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Area Sales Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Regulatory Affairs Manager
5
salaries
| ₹0 L/yr - ₹0 L/yr |
Bunge India
Louis Dreyfus Company
Wilmar
Golden Agri-Resources