Upload Button Icon Add office photos
Engaged Employer

i

This company page is being actively managed by ArcelorMittal Nippon Steel Team. If you also belong to the team, you can get access from here

ArcelorMittal Nippon Steel Verified Tick

Compare button icon Compare button icon Compare

Filter interviews by

ArcelorMittal Nippon Steel Interview Questions, Process, and Tips

Updated 28 Mar 2025

Top ArcelorMittal Nippon Steel Interview Questions and Answers

View all 159 questions

ArcelorMittal Nippon Steel Interview Experiences

Popular Designations

229 interviews found

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed in Jul 2024. There were 3 interview rounds.

Round 1 - One-on-one 

(1 Question)

  • Q1. Asked questions on TNI, Training program management, Project Management, Measure Training Effectiveness, Training Content Evaluation & Validation, LMS
Round 2 - One-on-one 

(1 Question)

  • Q1. Similar type of questions as in round 1
Round 3 - HR 

(1 Question)

  • Q1. Compensation discussion

Interview Preparation Tips

Interview preparation tips for other job seekers - Just have a hold on your work experience in L & D domain
Interview experience
5
Excellent
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Technical 

(5 Questions)

  • Q1. Mechanical testing
  • Q2. Like Api audit , NABL audit , ISO and safety
  • Q3. Quality manual,Quality objective, histogram,sop
  • Q4. Standards and specification
  • Q5. Internal audit,capa,moc,policy,

Interview Preparation Tips

Interview preparation tips for other job seekers - Job Responsibilities • Preparation update & Maintaining documentation as per ISO 9001:2015 quality management’s system requirements. Engaged in preparing the quality assurance plan, manufacturing procedure specification (MPs) as per the customer specification & reviewing of process chart for every work order released in shop floor. • Involved in preparation of system documents like Quality Manual, Quality system procedure, Control future for all Department documents. • Prepare all standard operating procedures of each working station as per API & ISO and maintaining same in one location in system to seen to every plant user. • Coordination for all the internal audit and external audit as per schedule with auditor and maintain all documents. • Analyzing the customer complaints by root cause analysis, corrective actions, preventive actions (preparation & implementation). • Follow up and comply of corrective action taken by the individual departments in case of any NCR issued during the audit. • Conducting plant surveillance audits during order execution.

QA QC Engineer Interview Questions asked at other Companies

Q1. wha is your response ?, if material will purchase from any factory then what will u do that ? , how many hours can u do work in a day?, do u know all plant calibration?, how the borrow area will select ?, how u manage your junior in work pe... read more
View answer (4)
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2024. There were 3 interview rounds.

Round 1 - HR 

(5 Questions)

  • Q1. Can you provide details about your work experience?
  • Ans. 

    I have over 5 years of experience in management roles, leading teams and overseeing operations.

    • Managed a team of 15 employees in a retail store, achieving sales targets consistently

    • Implemented new procedures to streamline operations and improve efficiency

    • Led training sessions for new employees to ensure they were equipped with necessary skills

    • Collaborated with other departments to coordinate projects and meet deadlines

  • Answered by AI
  • Q2. What are the details of your education?
  • Ans. 

    I have a Bachelor's degree in Business Administration from XYZ University.

    • Bachelor's degree in Business Administration

    • Graduated from XYZ University

    • Specialized in Marketing

    • Completed internship at ABC Company

  • Answered by AI
  • Q3. What is your current company and location, and why are you considering leaving your current company?
  • Ans. 

    I am currently working at XYZ Company in Location A. I am considering leaving because I am seeking new challenges and growth opportunities.

    • Currently working at XYZ Company in Location A

    • Seeking new challenges and growth opportunities

    • Interested in taking on more responsibilities as a Deputy Manager

  • Answered by AI
  • Q4. Are you willing to work on projects?
  • Ans. 

    Yes, I am willing to work on projects and have experience managing and leading project teams.

    • I have experience managing and leading project teams

    • I am comfortable working on multiple projects simultaneously

    • I am proactive in identifying and resolving project issues

  • Answered by AI
  • Q5. What is your expected salary?
  • Ans. 

    My expected salary is negotiable and based on the responsibilities and benefits offered in the role.

    • My expected salary is based on my experience, qualifications, and the market rate for the position.

    • I am open to discussing salary expectations during the interview process.

    • I am looking for a competitive salary that reflects my skills and contributions to the organization.

  • Answered by AI
Round 2 - Technical 

(9 Questions)

  • Q1. Tell me about yourself.
  • Ans. 

    I am a dedicated and experienced professional with a strong background in leadership and team management.

    • Over 5 years of experience in management roles

    • Proven track record of successfully leading teams to achieve goals

    • Strong communication and interpersonal skills

    • Ability to problem-solve and make strategic decisions

    • Bachelor's degree in Business Administration

  • Answered by AI
  • Q2. What is your role in your current company?
  • Ans. 

    I am responsible for overseeing daily operations, managing staff, and ensuring targets are met.

    • Overseeing daily operations

    • Managing staff

    • Ensuring targets are met

  • Answered by AI
  • Q3. What activities are you handling, and what is the size of your team? How many individuals are working under your supervision?
  • Ans. 

    I am currently handling various activities related to project management and leading a team of 10 individuals.

    • Handling project planning, execution, and monitoring

    • Leading team meetings and delegating tasks

    • Providing guidance and support to team members

    • Managing team performance and ensuring project deadlines are met

  • Answered by AI
  • Q4. Questions regarding Structural fabrication and erection
  • Q5. What are the different types of projects you have completed, and what challenges have you faced during their execution?
  • Ans. 

    I have completed a variety of projects including software development, process improvement, and team training.

    • Software development project for implementing a new CRM system

    • Process improvement project to streamline inventory management

    • Team training project to enhance communication and collaboration skills

    • Challenges faced include tight deadlines, budget constraints, and resistance to change

  • Answered by AI
  • Q6. Safety related questions
  • Q7. Questions about Pumps, blowers ,conveyors & Bag Filters Piping etc
  • Q8. What are your favorite subjects among engineering disciplines? Questions regarding that.
  • Q9. Some general questions
Round 3 - HR 

(3 Questions)

  • Q1. What is the expected joining date for the position? & notice period
  • Ans. 

    The expected joining date for the position is dependent on the notice period of the candidate.

    • The expected joining date will be determined based on the candidate's notice period.

    • The candidate may need to serve a notice period at their current job before joining the new position.

    • It is important to discuss the notice period during the interview process to ensure a smooth transition.

  • Answered by AI
  • Q2. What is your strengths & Weakness.
  • Ans. 

    My strengths include strong leadership skills and attention to detail. My weakness is that I can be overly critical of myself.

    • Strengths: strong leadership skills

    • Strengths: attention to detail

    • Weakness: overly critical of myself

  • Answered by AI
  • Q3. What is your expected CTC.
  • Ans. 

    My expected CTC is in line with industry standards and reflects my experience and skills.

    • Research industry standards for Deputy Manager roles

    • Consider my years of experience and level of expertise

    • Factor in the company's budget and compensation structure

    • Provide a range rather than a specific number

  • Answered by AI

Top ArcelorMittal Nippon Steel Deputy Manager Interview Questions and Answers

Q1. If any incidents happen in previous plant after that what you will do for mitigation
View answer (1)

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (72)
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
Less than 2 weeks
Result
Selected Selected

I appeared for an interview in Sep 2024, where I was asked the following questions.

  • Q1. Process route of HR coil's in HSM & CSP. All about Grade and chemistry. All parameters of FT & CT according to Grade
  • Q2. Different types of defects in HSM and CSP Mill.
  • Q3. According to coil's thickness required crown, wedges and flatness as well as cross profile

Interview Preparation Tips

Interview preparation tips for other job seekers - No more as compared to jsw Steel. But AM/NS also leading steel manufacturing company, so it's good to join for us.

Section Engineer Interview Questions asked at other Companies

Q1. Tell me the defects name which is comes in PU pad & give one defect trouble shoot?
View answer (1)

ArcelorMittal Nippon Steel interview questions for popular designations

 Deputy Manager

 (15)

 Assistant Manager

 (11)

 Graduate Engineer Trainee (Get)

 (7)

 Electrical Engineer

 (6)

 Diploma Trainee Engineer

 (5)

 Shift Engineer

 (4)

 Engineer Trainee

 (4)

 Shift Incharge

 (4)

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
More than 8 weeks
Result
Selected Selected
Round 1 - Technical 

(3 Questions)

  • Q1. Job-based questions relevant to your current role.
  • Q2. What safety components are involved in job execution.
  • Ans. 

    Safety components in job execution ensure a secure work environment, minimizing risks and protecting personnel and assets.

    • Personal Protective Equipment (PPE): Helmets, gloves, and goggles to protect workers from physical hazards.

    • Safety Training: Regular training sessions to educate employees on safety protocols and emergency procedures.

    • Risk Assessment: Identifying potential hazards before starting a job to implement ne...

  • Answered by AI
  • Q3. SOP,HIRA
Round 2 - HR 

(1 Question)

  • Q1. Documents Submition
Round 3 - HR 

(1 Question)

  • Q1. Salary Negotiation

Interview Preparation Tips

Interview preparation tips for other job seekers - Be confident throughout the interview.

Top ArcelorMittal Nippon Steel Deputy Manager Interview Questions and Answers

Q1. If any incidents happen in previous plant after that what you will do for mitigation
View answer (1)

Deputy Manager Interview Questions asked at other Companies

Q1. 1.WHAT IS SPECIAL OF UR HOME TOWN 2.Who is Main compitetor with us and which products...3.what is main business in your area and its functions...4 Previous comoany achevements 5.Your strengts and weakness.
View answer (72)

Get interview-ready with Top ArcelorMittal Nippon Steel Interview Questions

Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Sep 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Barring checking and saving work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old barring slue remove and new barring slue replace and bolt nut tighteni...
  • Ans. 

    Bolt nut open and old barring slue remove and new barring slue replace and bolt nut tightening sure and paper work cancelled and conveyor belt running ok

  • Answered by arbindkumarsingh
  • Q2. Motor replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old motor remove and new motor replace and bolt nut tightening sure and dayal guage ...
  • Ans. 

    Bolt nut open and old motor remove and new motor replace and bolt nut tightening sure and dayal guage eliminate process ok and paper work cancelled and conveyor belt running ok

  • Answered by arbindkumarsingh
  • Q3. Gear box replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old gear box remove and new gear box replace and bolt nut tightening sure and day...
  • Ans. 

    Bolt nut open and old gear box remove and new gear box replace and bolt nut tightening sure and dayal guage eliminate process ok and paper work cancelled and conveyor belt running ok

  • Answered by arbindkumarsingh
  • Q4. Conveyor belt discharge chute replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old discharge chute remove and new discharge chute replace a...
  • Q5. Conveyor belt all pully checking and saving greasing work and safety first and paper work and walked away clean and fresh and all pully checking and saving greasing gun and all' pully greasing and paper wo...
  • Q6. Conveyor belt roller replacement work and safety first and paper work and walked away clean and fresh and try out and fream number mark and cut roller remove and new roller replace and cut roller shifting ...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the growth of opportunity and advancement

Assistant Manager II Interview Questions asked at other Companies

Q1. What is your understanding of Object-Oriented Programming (OOP)?
View answer (1)

Jobs at ArcelorMittal Nippon Steel

View all
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
Selected Selected

I appeared for an interview in Feb 2025, where I was asked the following questions.

  • Q1. Can you share your best experience?
  • Ans. 

    My best experience was leading a team during a critical project, enhancing collaboration and achieving outstanding results.

    • Successfully led a team of 10 during a product launch, coordinating tasks and ensuring deadlines were met.

    • Implemented a new communication strategy that improved team collaboration, resulting in a 20% increase in productivity.

    • Facilitated training sessions that empowered team members, boosting their ...

  • Answered by AI
  • Q2. What are the major points to consider in the development process?
  • Ans. 

    Key points in development include planning, resource management, quality control, and communication for successful project execution.

    • 1. Planning: Establish clear objectives and timelines. For example, using Gantt charts to visualize project milestones.

    • 2. Resource Management: Allocate resources efficiently, ensuring the right tools and personnel are available.

    • 3. Quality Control: Implement testing phases to identify and ...

  • Answered by AI

Shift Incharge Interview Questions asked at other Companies

Q1. Tell me about power factor and how to keep always .80?
View answer (5)

Interview Questions & Answers

user image Anonymous

posted on 4 Jan 2025

Interview experience
4
Good
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Dec 2024. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. ID fan and P A fan BF pump alignment work
  • Ans. 

    Alignment work for ID fan, PA fan, and BF pump in a power plant.

    • Alignment work involves ensuring the equipment is properly positioned and connected to prevent issues like vibration or misalignment.

    • Proper alignment can improve efficiency and reduce maintenance costs.

    • Examples of alignment work include using laser alignment tools, checking for parallelism, and adjusting mounting bolts.

    • Regular alignment checks should be co

  • Answered by AI
  • Q2. Pump and gearbox values dismantled and assembling work
  • Ans. 

    Dismantling and assembling pump and gearbox values involves careful disassembly, inspection, cleaning, replacement of parts if necessary, and reassembly.

    • Carefully disassemble the pump and gearbox to access the valves

    • Inspect the valves for any damage or wear

    • Clean the valves thoroughly to remove any debris or buildup

    • Replace any damaged or worn valves with new ones

    • Reassemble the pump and gearbox ensuring all valves are pr

  • Answered by AI
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
-

I applied via Company Website and was interviewed in Aug 2024. There were 2 interview rounds.

Round 1 - Group Discussion 

Gear box replacement work

Round 2 - HR 

(6 Questions)

  • Q1. Motor replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old motor remove and new motor replace and bolt nut tightening sure and paper work c...
  • Q2. Discharge chute replacement work and safety first and paper work and walked away clean and fresh and try out and bolt nut open and old discharge chute remove and new discharge chute replace and bolt nut ti...
  • Q3. Conveyor belt roller replacement work and safety first and paper work and walked away clean and fresh and try out and fream number mark and cut roller remove and shifting and walked away clean and fresh an...
  • Q4. Conveyor belt all pully greasing and saving work and safety first and paper work and walked away clean and fresh and all pully checking and saving greasing gun and all' pully greasing done and paper work c...
  • Q5. Barring checking and saving work and safety first and paper work and walked away clean and fresh and try out blumber block top cover open and old slue barring remove and new slue barring replace and bolt n...
  • Q6. Gear Box replacement wor and paper work Safety first and try out and bolt nut open and old gear box remove and new gear box replace and bolt nut tightening Sure and dayal guage eliminate process ok and p...

Interview Preparation Tips

Interview preparation tips for other job seekers - Because of the growth of opportunity and advancement

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (89)
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

It was easy and time based

Round 2 - One-on-one 

(2 Questions)

  • Q1. Intro was asked and then steel making process. Software’s u known and about my internship in PORT.
  • Q2. Asked about stress strain curve to explain. And interviewer was very friendly. Very easy to get into this company

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be confident and read about company what it does and ur good to go.

Production Graduate Engineer Trainee Interview Questions asked at other Companies

Q1. PRINCIPLE ON WHICH HEAT TRANSFER WORKS (ALL PHASES)
View answer (1)

Assistant Manager Interview Questions & Answers

user image Jitendra Meena

posted on 4 Dec 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Jun 2024. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. If hydraulic system tank oil is heating, what points will you check?
  • Q2. What is the difference between proportional valve and servo valve
  • Q3. Have you done any project, what is your involvement?
  • Q4. For BUR choke lubrication which system you're using and what is system interlock?
  • Q5. In your 10 yr experience at JSW Steel, what is the biggest breakdown in your tenure? explain the route couse with CAPA.

Interview Preparation Tips

Topics to prepare for ArcelorMittal Nippon Steel Assistant Manager interview:
  • Nothing
Interview preparation tips for other job seekers - Interview preparation is nothing but you should know your role where you're working and explain your role to interviewer properly.

Assistant Manager Interview Questions asked at other Companies

Q1. You are Handling cash operations then how you manage operations with sales ?
View answer (89)

ArcelorMittal Nippon Steel Interview FAQs

How many rounds are there in ArcelorMittal Nippon Steel interview?
ArcelorMittal Nippon Steel interview process usually has 2-3 rounds. The most common rounds in the ArcelorMittal Nippon Steel interview process are Technical, Resume Shortlist and HR.
How to prepare for ArcelorMittal Nippon Steel interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at ArcelorMittal Nippon Steel. The most common topics and skills that interviewers at ArcelorMittal Nippon Steel expect are Teaching, Direct Tax, Financial Modelling, Income Tax and SAP.
What are the top questions asked in ArcelorMittal Nippon Steel interview?

Some of the top questions asked at the ArcelorMittal Nippon Steel interview -

  1. Production, Maintenance, Quality and Safety. Out of four, tell me the most impo...read more
  2. What is the difference between thermal power plant and hydro power pl...read more
  3. What are the major problems in any production plant? and how can you handle tha...read more
How long is the ArcelorMittal Nippon Steel interview process?

The duration of ArcelorMittal Nippon Steel interview process can vary, but typically it takes about less than 2 weeks to complete.

Tell us how to improve this page.

ArcelorMittal Nippon Steel Interview Process

based on 267 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

Tata Steel Interview Questions
4.1
 • 858 Interviews
JSW Steel Interview Questions
3.9
 • 595 Interviews
Jindal Stainless Interview Questions
4.2
 • 214 Interviews
JSW Group Interview Questions
3.9
 • 110 Interviews
Jindal Saw Interview Questions
4.0
 • 102 Interviews
Viraj Profiles Interview Questions
3.8
 • 79 Interviews
View all

ArcelorMittal Nippon Steel Reviews and Ratings

based on 2.7k reviews

4.1/5

Rating in categories

3.9

Skill development

3.9

Work-life balance

3.7

Salary

4.0

Job security

3.8

Company culture

3.5

Promotions

3.8

Work satisfaction

Explore 2.7k Reviews and Ratings
Supply chain Management

Bahadurgarh

2-7 Yrs

Not Disclosed

Technical Services

Nazira,

Surat

0-5 Yrs

Not Disclosed

Technical Services

Nazira,

Surat

3-6 Yrs

Not Disclosed

Explore more jobs
Deputy Manager
723 salaries
unlock blur

₹4.8 L/yr - ₹15.5 L/yr

Assistant Manager
585 salaries
unlock blur

₹3 L/yr - ₹11.6 L/yr

Manager
518 salaries
unlock blur

₹6 L/yr - ₹22 L/yr

Assistant Field Engineer
392 salaries
unlock blur

₹1.8 L/yr - ₹5.2 L/yr

Engineer
350 salaries
unlock blur

₹2.4 L/yr - ₹7.5 L/yr

Explore more salaries
Compare ArcelorMittal Nippon Steel with

Tata Steel

4.1
Compare

JSW Steel

3.9
Compare

Jindal Steel and Power

3.9
Compare

Jindal Stainless

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview