Filter interviews by
I applied via Walk-in and was interviewed in Jun 2024. There were 3 interview rounds.
Top trending discussions
posted on 17 Feb 2021
I applied via Walk-in and was interviewed in Aug 2020. There was 1 interview round.
posted on 10 Sep 2017
I appeared for an interview before Sep 2016.
posted on 10 Sep 2015
I applied via PLACEMENT
posted on 12 May 2018
posted on 14 Jul 2017
I appeared for an interview before Jul 2016.
I applied via Recruitment Consultant and was interviewed in Sep 2019. There were 3 interview rounds.
Bus bar schemes are different ways of connecting bus bars in power systems.
Single bus bar scheme
Double bus bar scheme
Main and transfer bus bar scheme
Ring bus bar scheme
Breaker and a half scheme
Mesh bus bar scheme
The equipment sequence for any line bay starts with the circuit breaker and ends with the transformer.
The circuit breaker is the first equipment in the sequence.
Next comes the isolator switch.
After that, the earth switch is operated.
Then the line disconnector is opened.
Finally, the transformer is disconnected from the line.
The sequence is reversed when the line bay is put back into service.
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
27
salaries
| ₹4.4 L/yr - ₹9.8 L/yr |
Civil Engineer
22
salaries
| ₹3.2 L/yr - ₹5.8 L/yr |
Junior Engineer Civil
18
salaries
| ₹1.5 L/yr - ₹3.8 L/yr |
Senior Civil Engineer
17
salaries
| ₹4.8 L/yr - ₹8.4 L/yr |
Civil Site Engineer
17
salaries
| ₹1.5 L/yr - ₹5.8 L/yr |
Larsen & Toubro Limited
Megha Engineering & Infrastructures
Shapoorji Pallonji Group
Alstom Transportation