I applied via LinkedIn and was interviewed before Jan 2022. There were 2 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Mar 2023. There was 1 interview round.
Mivan formwork is a construction technique that uses aluminum formwork system for casting concrete structures.
Mivan formwork involves setting up aluminum formwork panels, fixing reinforcement bars, pouring concrete, and removing the formwork after the concrete has set.
It is a fast and efficient construction method commonly used for high-rise buildings and large residential projects.
The system allows for smooth finishes...
posted on 31 Oct 2023
I applied via LinkedIn and was interviewed in Feb 2022. There were 2 interview rounds.
I am a civil engineer with experience in designing and managing construction projects.
I have a Bachelor's degree in Civil Engineering from XYZ University.
I have worked on various projects including designing bridges, roads, and buildings.
I am skilled in using software such as AutoCAD and Revit for designing.
I have experience in managing construction projects and ensuring they are completed on time and within budget.
I a...
I applied via Naukri.com and was interviewed in Jun 2022. There were 2 interview rounds.
To start OFC cable blowing, follow these steps
Ensure that the ducts are clean and free of any obstruction
Attach the cable blowing machine to the duct
Connect the cable to the machine and start the blowing process
Monitor the cable's progress and adjust the machine's speed as needed
Once the cable has been blown through the entire length of the duct, detach the machine and cable
posted on 23 Mar 2025
I appeared for an interview before Mar 2024, where I was asked the following questions.
I applied via Company Website and was interviewed in Mar 2024. There was 1 interview round.
Mix design is the process of determining the proportions of cement, water, aggregates, and admixtures in concrete to achieve desired properties.
Determine the required strength and durability of the concrete
Select suitable materials such as cement, aggregates, water, and admixtures
Calculate the proportions of each material based on desired properties and specifications
Perform trial mixes to test the properties of the co...
I applied via Referral and was interviewed before May 2023. There was 1 interview round.
RMC reconciliation involves comparing the quantity of materials ordered with the quantity used in construction to ensure accuracy.
Collect all the data related to RMC (Ready Mix Concrete) orders and deliveries.
Compare the quantity of RMC ordered with the quantity actually used in construction.
Identify any discrepancies and investigate the reasons behind them.
Adjust the records accordingly to ensure accurate billing and
BBS (Bar Bending Schedule) is calculated by determining the quantity of steel reinforcement required for a particular concrete structure.
Calculate the total length of bars required for each diameter and type of reinforcement.
Determine the number of bars required for each diameter and type of reinforcement.
Calculate the total weight of bars required for each diameter and type of reinforcement.
Prepare a detailed schedule...
Paint measurements can be checked using a paint thickness gauge to ensure compliance with specifications.
Use a paint thickness gauge to measure the thickness of the paint layer.
Compare the measured thickness with the specified thickness in the project specifications.
Ensure that the paint thickness is uniform across the surface.
Repeat the measurements at multiple points to ensure accuracy.
Adjust the paint application if...
Extra items for WO amendment can be found by reviewing project specifications, consulting with stakeholders, conducting site visits, and analyzing previous change orders.
Review project specifications for any missed items or changes
Consult with stakeholders such as architects, engineers, and contractors for input
Conduct site visits to identify any additional work required
Analyze previous change orders to see if any item
Consider JMR based on project specifications, quantities, rates, and market conditions.
Review project specifications to ensure accurate billing
Verify quantities of materials and work done
Check rates for labor, materials, and equipment
Consider market conditions for pricing accuracy
posted on 5 Aug 2023
I applied via Approached by Company and was interviewed in Jul 2023. There were 2 interview rounds.
posted on 14 Oct 2023
I applied via Naukri.com and was interviewed in Apr 2023. There were 3 interview rounds.
Process of variation involves documenting and analyzing changes in project scope, cost, or schedule.
Variations are changes to the original scope, cost, or schedule of a project
Variations must be documented and approved by the relevant parties
The impact of variations on project budget and timeline must be analyzed
Examples of variations include design changes, unforeseen site conditions, and client requests
based on 1 interview
Interview experience
based on 1 review
Rating in categories
Senior Engineer
9
salaries
| ₹5.4 L/yr - ₹7.2 L/yr |
Surveyor
7
salaries
| ₹2.2 L/yr - ₹4 L/yr |
Site Engineer
6
salaries
| ₹1.8 L/yr - ₹7.2 L/yr |
Track Engineer
6
salaries
| ₹3 L/yr - ₹8.4 L/yr |
Safety Officer
6
salaries
| ₹3.5 L/yr - ₹4.6 L/yr |
Lea Associates South Asia
R.V.R. PROJECTS
ABCI Infrastructures
VIKRAN Engineering & Exim