i
Aptiv
Filter interviews by
I applied via Recruitment Consulltant and was interviewed in Jul 2022. There were 3 interview rounds.
Critical situations can be managed by staying calm, assessing the situation, and taking decisive action.
Stay calm and composed to avoid panic
Assess the situation to determine the severity and potential impact
Identify the root cause of the problem
Develop a plan of action and communicate it clearly to all involved parties
Take decisive action to resolve the issue as quickly and safely as possible
Evaluate the effectiveness...
Lean manufacturing is a systematic approach to identifying and eliminating waste in the production process.
Focuses on continuous improvement
Involves all employees in the process
Reduces lead time and inventory
Uses tools such as value stream mapping and 5S
Examples include Toyota Production System and Kaizen
Top trending discussions
posted on 4 Jun 2024
I applied via Walk-in and was interviewed in Dec 2023. There was 1 interview round.
Production output can be calculated by multiplying the number of units produced by the standard hours per unit.
Calculate the number of units produced during a specific time period.
Determine the standard hours per unit required for production.
Multiply the number of units produced by the standard hours per unit to get the production output.
OEE stands for Overall Equipment Effectiveness. It is a measure of how well a manufacturing process is performing.
OEE is calculated by multiplying Availability, Performance, and Quality.
Availability = (Operating Time / Planned Production Time) * 100%
Performance = (Ideal Cycle Time / Total Cycle Time) * 100%
Quality = (Good Count / Total Count) * 100%
OEE = Availability * Performance * Quality
For example, if a machine ope...
I applied via Walk-in and was interviewed in Oct 2024. There were 5 interview rounds.
Written exam with 15 to 30 minutes
Topic will be given or asked
I expect a challenging role where I can utilize my production skills to improve efficiency and quality.
Opportunities to implement process improvements
Collaboration with cross-functional teams
Training and development opportunities
Clear communication of expectations and goals
Support from management in achieving targets
posted on 19 Apr 2024
Don't join in this group
APTITUDE TEST 2HRS ,
Stress is a natural response to pressure or demands that can affect physical and mental well-being. I am interested in joining your organization because of its positive work culture and opportunities for growth.
Stress is a normal reaction to challenges and can manifest in physical, emotional, and behavioral symptoms.
Joining a supportive organization can help manage stress through teamwork, communication, and work-life ...
I applied via Naukri.com and was interviewed in Oct 2023. There were 2 interview rounds.
Motors convert electrical energy into mechanical energy, while generators convert mechanical energy into electrical energy.
Motors use electricity to produce motion, while generators use motion to produce electricity
Motors have a rotor that spins within a stator, while generators have a rotor that is turned by an external force
Examples of motors include electric fans and washing machines, while examples of generators in
posted on 10 Jun 2024
Line balancing is the process of assigning tasks to workstations in a way that evens out the workload and maximizes efficiency.
Involves distributing workload evenly among workstations
Minimizes idle time and bottlenecks
Improves productivity and efficiency
Example: In an assembly line, tasks are allocated to different stations to ensure smooth flow of production
TPM pillars are key principles for Total Productive Maintenance, leading to improved equipment reliability and productivity.
Pillar 1: Autonomous Maintenance - Involving operators in routine maintenance tasks to prevent breakdowns.
Pillar 2: Planned Maintenance - Scheduled maintenance activities to keep equipment in optimal condition.
Pillar 3: Quality Maintenance - Ensuring equipment is capable of producing quality produ...
5s is a methodology used to organize a workplace for efficiency and effectiveness by identifying and storing items used, maintaining the area and items, and sustaining the new order.
Sort: Separate necessary items from unnecessary ones.
Set in order: Arrange necessary items in a logical and efficient manner.
Shine: Clean and inspect the work area regularly.
Standardize: Establish standards and procedures for maintaining th...
Bottlenecks are points in a process where the flow of work is impeded or slowed down, causing delays and inefficiencies.
Bottlenecks can occur due to limited resources, such as equipment or manpower
Identifying and addressing bottlenecks is crucial for improving overall productivity
Examples of bottlenecks include a machine that frequently breaks down, causing a backlog in production
Implementing strategies like cross-trai...
based on 3 reviews
Rating in categories
Senior Software Engineer
740
salaries
| ₹8.9 L/yr - ₹21 L/yr |
Software Engineer
394
salaries
| ₹4.2 L/yr - ₹16.6 L/yr |
Advanced Software Engineer
381
salaries
| ₹11.4 L/yr - ₹26 L/yr |
Technical Lead
312
salaries
| ₹14.2 L/yr - ₹31.5 L/yr |
Engineer
163
salaries
| ₹2.5 L/yr - ₹11.7 L/yr |
Bosch
Continental
Samvardhana Motherson Group
Mahindra & Mahindra