i
Rockman Industries
Filter interviews by
I applied via Approached by Company and was interviewed before Mar 2021. There was 1 interview round.
V1, V2, and Cp are variables used in thermodynamics to calculate specific heat at constant pressure.
V1 and V2 are the initial and final volumes of a system, respectively.
Cp is the specific heat at constant pressure, which can be calculated using the formula Cp = (Q / (m * (T2 - T1))).
Q is the heat added to the system, m is the mass of the system, and T1 and T2 are the initial and final temperatures, respectively.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Job Portal and was interviewed in Jul 2023. There were 3 interview rounds.
I applied via Job Portal
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
Siemens plc models include S7-1200, S7-1500, S7-300, S7-400, and LOGO!
S7-1200
S7-1500
S7-300
S7-400
LOGO!
SPC stands for Statistical Process Control, a method used to monitor and control processes to ensure they are operating efficiently and within specifications.
SPC involves collecting and analyzing data to identify variations in a process
It helps in detecting and correcting issues before they result in defects
Common tools used in SPC include control charts, histograms, and Pareto charts
To configure a dp dp coupler, set the parameters for communication protocol, baud rate, address, and data format.
Set the communication protocol to match the devices being connected.
Configure the baud rate to ensure proper data transmission speed.
Assign a unique address to the dp dp coupler for identification.
Choose the appropriate data format for the connected devices.
Test the configuration to ensure proper communicati
Various t-codes are used in SAP MM module for different purposes.
MM01 - Create Material Master
MM02 - Change Material Master
MM03 - Display Material Master
ME21N - Create Purchase Order
ME22N - Change Purchase Order
ME23N - Display Purchase Order
MIGO - Goods Movement
MIRO - Invoice Verification
MB51 - Material Document List
ME2N - Purchase Orders by PO Number
ME2M - Purchase Orders by Material
ME2L - Purchase Orders by Vendor
ME2
based on 1 interview
Interview experience
based on 8 reviews
Rating in categories
Assistant Engineer
226
salaries
| ₹2 L/yr - ₹4.6 L/yr |
Senior Engineer
210
salaries
| ₹3.2 L/yr - ₹8.4 L/yr |
Engineer
208
salaries
| ₹2.8 L/yr - ₹6 L/yr |
Assistant Manager
165
salaries
| ₹4 L/yr - ₹12.5 L/yr |
Production Engineer
153
salaries
| ₹2.2 L/yr - ₹5.6 L/yr |
Bosch
Ceat Tyres
UNO Minda
Apollo Tyres