i
Rockman Industries
Filter interviews by
I applied via Naukri.com and was interviewed in Sep 2023. There were 4 interview rounds.
Base on the company or machine base questions
The products processed will vary depending on the specific industry and company, but typically include metal, plastic, wood, and composite materials.
Metal materials such as aluminum, steel, and titanium
Plastic materials like PVC, acrylic, and nylon
Wood materials including oak, maple, and pine
Composite materials such as carbon fiber and fiberglass
Employee benefits include health insurance, retirement plans, paid time off, and professional development opportunities.
Health insurance coverage for medical, dental, and vision needs
Retirement plans such as 401(k) with employer matching contributions
Paid time off for vacation, sick leave, and holidays
Professional development opportunities like training programs and tuition reimbursement
Employee discounts on products o
Technical base discussion
I applied via Approached by Company and was interviewed in Feb 2022. There were 2 interview rounds.
Top trending discussions
I applied via Campus Placement and was interviewed in Jan 2022. There were 2 interview rounds.
I applied via Walk-in and was interviewed before Oct 2022. There were 3 interview rounds.
First they give technical exam and next HR interview
I applied via Naukri.com and was interviewed in Dec 2020. There were 3 interview rounds.
I applied via Walk-in and was interviewed before Feb 2021. There were 2 interview rounds.
I applied via Referral and was interviewed before Sep 2020. There were 3 interview rounds.
I applied via Referral and was interviewed before Oct 2021. There were 3 interview rounds.
Siemens plc models include S7-1200, S7-1500, S7-300, S7-400, and LOGO!
S7-1200
S7-1500
S7-300
S7-400
LOGO!
SPC stands for Statistical Process Control, a method used to monitor and control processes to ensure they are operating efficiently and within specifications.
SPC involves collecting and analyzing data to identify variations in a process
It helps in detecting and correcting issues before they result in defects
Common tools used in SPC include control charts, histograms, and Pareto charts
To configure a dp dp coupler, set the parameters for communication protocol, baud rate, address, and data format.
Set the communication protocol to match the devices being connected.
Configure the baud rate to ensure proper data transmission speed.
Assign a unique address to the dp dp coupler for identification.
Choose the appropriate data format for the connected devices.
Test the configuration to ensure proper communicati
I applied via Job Portal
based on 1 interview
Interview experience
based on 4 reviews
Rating in categories
Assistant Engineer
226
salaries
| ₹2 L/yr - ₹4.6 L/yr |
Senior Engineer
210
salaries
| ₹3.2 L/yr - ₹8.4 L/yr |
Engineer
207
salaries
| ₹2.8 L/yr - ₹6 L/yr |
Assistant Manager
165
salaries
| ₹4 L/yr - ₹12.5 L/yr |
Production Engineer
160
salaries
| ₹2.2 L/yr - ₹5.6 L/yr |
Bosch
Ceat Tyres
UNO Minda
Apollo Tyres