I applied via Referral and was interviewed in Feb 2021. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. General civil
  • Q2. Finishing RCC

Interview Preparation Tips

Interview preparation tips for other job seekers - Not recommended
Interview experience
4
Good
Difficulty level
Moderate
Process Duration
2-4 weeks
Result
No response

I applied via Naukri.com and was interviewed in Mar 2023. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Don’t add your photo or details such as gender, age, and address in your resume. These details do not add any value.
View all Resume tips
Round 2 - Technical 

(3 Questions)

  • Q1. RCC Mivon shuttering experience?
  • Ans. 

    RCC Mivon shuttering experience involves using reinforced concrete construction techniques for formwork and scaffolding.

    • Experience in setting up formwork and scaffolding for reinforced concrete structures

    • Knowledge of RCC Mivon shuttering techniques and materials

    • Ability to interpret construction drawings and plans for RCC Mivon shuttering

    • Experience in coordinating with construction teams and contractors for RCC Mivon sh

  • Answered by AI
  • Q2. Finishing work experience?
  • Q3. Yes , I have. I told them about my job profile. They asked me 4- 5 questions related to work , which I answered well. But not recieved any response later.

Interview Preparation Tips

Interview preparation tips for other job seekers - Be prepare for negotiation in salary structure.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
6-8 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jun 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all Resume tips
Round 2 - Technical 

(1 Question)

  • Q1. Structure related questions, Finishing work, Basic knowledge of Fire and Plumbing work, Quality codes, Glazing work, ETC..
Round 3 - HR 

(1 Question)

  • Q1. Pay rolls and offer letter

Interview Preparation Tips

Interview preparation tips for other job seekers - Need to be confidence with your answer and have Site work knowledge.
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed before Jul 2023. There was 1 interview round.

Round 1 - Technical 

(1 Question)

  • Q1. Start to handover process in a Project

Interview Preparation Tips

Interview preparation tips for other job seekers - Just be well prepared in terms of all types of processes and sequences in construction. Situation based problem solving abilities and good communication skills.
Interview experience
2
Poor
Difficulty level
-
Process Duration
-
Result
-
Round 1 - One-on-one 

(2 Questions)

  • Q1. ABOUT THE JOB ROLE AND EXPERIENCE
  • Q2. ABOUT KNOWLEDGE RELATED TO JD
Interview experience
4
Good
Difficulty level
Easy
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Oct 2024. There were 2 interview rounds.

Round 1 - Technical 

(2 Questions)

  • Q1. Ask about work specific technical questions
  • Q2. Discuss on job profile , qualifications and basis
Round 2 - HR 

(1 Question)

  • Q1. Salary and family discussions
Interview experience
5
Excellent
Difficulty level
Easy
Process Duration
2-4 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Apr 2023. There was 1 interview round.

Round 1 - HR 

(5 Questions)

  • Q1. Tell ur self ur from ur student u ug pg
  • Ans. 

    I am a software developer with a background in undergraduate and postgraduate studies.

    • I completed my undergraduate degree in Computer Science at XYZ University.

    • I pursued my postgraduate studies in Software Engineering at ABC Institute.

    • I have a strong foundation in programming languages such as Java, Python, and C++.

    • I have experience working on various projects during my studies, including a web application for a local

  • Answered by AI
  • Q2. Last u have book reding r movies watching
  • Q3. Work experience
  • Q4. U hope that u would be a right person for hering you in the job
  • Q5. Even disciplined towards senior attocities

Interview Preparation Tips

Topics to prepare for DLF Software Developer interview:
  • Computer Operating
  • Planning
  • Full Stack
  • Multimedia
  • Extension
  • Business Development
  • Clearing
  • Add
  • Multimedia Framework
  • work f
Interview preparation tips for other job seekers - Update your resume tailor your cover act kindly to everyone send follow up emails keep track of the jobs you apply tolearn job keywords
Interview experience
4
Good
Difficulty level
-
Process Duration
-
Result
-
Round 1 - Aptitude Test 

Dressing and personality

Round 2 - Technical 

(1 Question)

  • Q1. Site questions and finishing work

Senior Engineer Interview Questions & Answers

DLF user image MRITUNJAY KUMAR

posted on 15 Mar 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Campus Placement and was interviewed before Mar 2023. There was 1 interview round.

Round 1 - Technical 

(5 Questions)

  • Q1. Structure work going on at site
  • Ans. 

    The structure work at the site involves the construction of a new building using steel beams and concrete columns.

    • Steel beams are being used for the framework of the building

    • Concrete columns are being installed to support the structure

    • The construction process includes pouring concrete, welding steel beams, and erecting walls

  • Answered by AI
  • Q2. Survey related questions
  • Q3. Planning related
  • Q4. About Relocation nearby site
  • Q5. Manage site works
  • Ans. 

    Managing site works involves overseeing construction activities, coordinating with contractors, ensuring safety regulations are followed, and meeting project deadlines.

    • Coordinate with contractors and subcontractors to ensure work is completed on time and within budget

    • Monitor progress of construction activities and address any issues that may arise

    • Ensure compliance with safety regulations and quality standards

    • Communicat...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Be ready with your portfolio,and manage
Interview experience
5
Excellent
Difficulty level
Hard
Process Duration
-
Result
Selected Selected

I applied via Recruitment Consulltant and was interviewed in Dec 2023. There was 1 interview round.

Round 1 - One-on-one 

(1 Question)

  • Q1. Slab cycle of aluminium shuttering
  • Ans. 

    The slab cycle of aluminium shuttering refers to the process of using aluminium formwork for casting slabs in construction projects.

    • Aluminium shuttering is lightweight and durable, making it ideal for repetitive use in slab construction.

    • The slab cycle involves setting up the aluminium formwork, pouring concrete, allowing it to cure, and then dismantling the formwork for reuse.

    • Aluminium shuttering can be easily assemble...

  • Answered by AI
Contribute & help others!
anonymous
You can choose to be anonymous

APM Design Build Interview FAQs

How to prepare for APM Design Build interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at APM Design Build. The most common topics and skills that interviewers at APM Design Build expect are Construction and Printing and Packaging.

Recently Viewed

PHOTOS

InsuranceDekho

3 office photos

LIST OF COMPANIES

Credit Bajaar

Overview

PHOTOS

Arihantam Infraprojects

No Photos

JOBS

BuildNext

No Jobs

PHOTOS

BuildNext

No Photos

JOBS

Arihantam Infraprojects

No Jobs

COMPANY BENEFITS

Kulaswaminee Engineers Pune

No Benefits

SALARIES

Kulaswaminee Engineers Pune

No Salaries

INTERVIEWS

Istaka India

No Interviews

INTERVIEWS

Brick&Bolt

No Interviews

Tell us how to improve this page.

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 744 Interviews
Tata Projects Interview Questions
4.2
 • 426 Interviews
Sobha Interview Questions
3.9
 • 128 Interviews
DLF Interview Questions
3.9
 • 75 Interviews
Prestige Group Interview Questions
4.3
 • 36 Interviews
Brigade Group Interview Questions
4.1
 • 32 Interviews
Oberoi Realty Interview Questions
4.1
 • 17 Interviews
View all

APM Design Build Reviews and Ratings

based on 12 reviews

3.9/5

Rating in categories

3.8

Skill development

3.8

Work-life balance

4.1

Salary

3.7

Job security

3.8

Company culture

3.6

Promotions

3.8

Work satisfaction

Explore 12 Reviews and Ratings
Construction Engineer

Bangalore / Bengaluru

4-8 Yrs

Not Disclosed

Explore more jobs
Senior Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Project Engineer
5 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Safety Officer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

General Manager Project
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare APM Design Build with

L&T Construction

4.0
Compare

Shapoorji Pallonji Group

4.1
Compare

Tata Projects

4.2
Compare

Godrej Properties

3.7
Compare
Did you find this page helpful?
Yes No
write
Share an Interview