Upload Button Icon Add office photos

Apco Infratech

Compare button icon Compare button icon Compare

Filter interviews by

Apco Infratech Assistant Manager Information Technology Interview Questions, Process, and Tips

Updated 26 Apr 2024

Apco Infratech Assistant Manager Information Technology Interview Experiences

1 interview found

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Mar 2024. There were 2 interview rounds.

Round 1 - Technical 

(4 Questions)

  • Q1. What is network and networking?
  • Ans. 

    Network is a collection of computers and other devices connected together to share resources and information.

    • Network refers to the infrastructure that allows devices to communicate with each other.

    • Networking involves the process of connecting devices within a network to enable communication.

    • Examples of networks include LAN (Local Area Network), WAN (Wide Area Network), and the internet.

  • Answered by AI
  • Q2. What is routers and their types?
  • Ans. 

    Routers are networking devices that forward data packets between computer networks. Types include wired, wireless, core, edge, and virtual routers.

    • Routers are used to connect multiple networks together

    • Wired routers use physical cables to connect devices

    • Wireless routers use Wi-Fi to connect devices

    • Core routers are used in the backbone of the network

    • Edge routers connect the network to external networks

    • Virtual routers are...

  • Answered by AI
  • Q3. What is switch and their types?
  • Ans. 

    A switch is a networking device that connects devices on a local area network (LAN) and forwards data packets between them.

    • Types of switches include managed switches, unmanaged switches, and layer 2/layer 3 switches.

    • Managed switches allow for configuration and monitoring of network traffic.

    • Unmanaged switches are plug-and-play devices with no configuration options.

    • Layer 2 switches operate at the data link layer and use ...

  • Answered by AI
  • Q4. What is osi layers and their function?
  • Ans. 

    OSI (Open Systems Interconnection) model is a conceptual framework that standardizes the functions of a telecommunication or computing system into seven abstraction layers.

    • Physical Layer: Deals with physical connections and transmission of raw data.

    • Data Link Layer: Manages data frames and error detection/correction.

    • Network Layer: Handles routing and logical addressing.

    • Transport Layer: Ensures end-to-end communication a...

  • Answered by AI
Round 2 - HR 

(2 Questions)

  • Q1. Discuss previous company and their salary structure.
  • Q2. Can you do the job far from your own place?

Interview Preparation Tips

Interview preparation tips for other job seekers - Knowledge is necessary about your field

Skills evaluated in this interview

Interview questions from similar companies

I applied via Walk-in and was interviewed before Apr 2020. There was 1 interview round.

Interview Questionnaire 

6 Questions

  • Q1. Can you explain Man day
  • Q2. Can you explain manpower mobilization.
  • Ans. 

    Manpower mobilization refers to the process of deploying and managing personnel for a specific project or task.

    • Identifying the required personnel for a project

    • Recruiting and hiring personnel

    • Training and orienting personnel to the project

    • Assigning roles and responsibilities to personnel

    • Managing personnel performance and productivity

    • Ensuring compliance with labor laws and regulations

    • Examples include mobilizing a construc...

  • Answered by AI
  • Q3. How to cost control in project
  • Ans. 

    Cost control in project can be achieved through effective planning, monitoring and controlling of project expenses.

    • Create a detailed project budget and stick to it

    • Track expenses regularly and adjust budget as needed

    • Identify and eliminate unnecessary expenses

    • Negotiate with vendors for better pricing

    • Implement cost-saving measures without compromising quality

    • Use project management tools to monitor expenses and progress

    • Reg...

  • Answered by AI
  • Q4. Can you explain how to handle clinent
  • Ans. 

    Handling clients requires effective communication, understanding their needs, and providing timely solutions.

    • Listen actively to their concerns and requirements

    • Communicate clearly and professionally

    • Provide timely updates and solutions

    • Build a strong relationship based on trust and respect

    • Be proactive in identifying and addressing potential issues

    • Ensure customer satisfaction by going above and beyond expectations

  • Answered by AI
  • Q5. Flow chart for manpower mobilization
  • Ans. 

    Manpower mobilization flow chart involves identifying needs, planning, recruitment, training, and deployment.

    • Identify the need for manpower

    • Plan the recruitment process

    • Source and screen candidates

    • Conduct interviews and assessments

    • Select and hire candidates

    • Provide training and orientation

    • Deploy manpower to required locations

  • Answered by AI
  • Q6. Prepared organisation chat for project handling

Interview Preparation Tips

Interview preparation tips for other job seekers - Please see all questions

I applied via Company Website and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. They asked for previous company work management, work culture, work timing & some technical questions

Interview Preparation Tips

Interview preparation tips for other job seekers - Its not so difficult
Just share your work experience

I applied via Referral and was interviewed before Jan 2021. There were 3 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Mainly consantraint for pump and high temp lines and material.

Interview Preparation Tips

Interview preparation tips for other job seekers - As above questions mention
Interview experience
5
Excellent
Difficulty level
-
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Job Portal and was interviewed before Dec 2021. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(1 Question)

  • Q1. Control valves on-off valves
Round 3 - Technical 

(1 Question)

  • Q1. PSV pressure regulators

Interview Preparation Tips

Interview preparation tips for other job seekers - Technical study is important . Basics to be perfect

Interview Questionnaire 

1 Question

  • Q1. Hard core techanical

I applied via Recruitment Consulltant and was interviewed before Nov 2021. There were 2 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. None? better opportunities available?
  • Q2. Many. Mostly Guld country

Interview Preparation Tips

Interview preparation tips for other job seekers - Avoid the firm. Poor management trying to salvage the company by treating employees like merchandise to be used until broken.
Interview experience
4
Good
Difficulty level
Easy
Process Duration
-
Result
Not Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - Technical 

(1 Question)

  • Q1. Civil engineering related Questions
Round 2 - HR 

(1 Question)

  • Q1. Salary related discussion
Interview experience
1
Bad
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Approached by Company and was interviewed before Nov 2022. There were 3 interview rounds.

Round 1 - Resume Shortlist 
Pro Tip by AmbitionBox:
Keep your resume crisp and to the point. A recruiter looks at your resume for an average of 6 seconds, make sure to leave the best impression.
View all tips
Round 2 - Technical 

(2 Questions)

  • Q1. Basics of what ur past experience
  • Q2. Basic of shuttering and concreting
Round 3 - Technical 

(1 Question)

  • Q1. What u r past experience

Interview Preparation Tips

Interview preparation tips for other job seekers - Cheapest HRs team in entire Ahemdabad have worked with no. Of company but this company HRs is the worst of them all..
No fixed timing of work. Only top management is supportive down the line everyone is of cheap mentality. Not recommend to join the company as u will regret later. Not even cable to achieve 1 star
Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
4-6 weeks
Result
Selected Selected

I applied via Walk-in and was interviewed before Jun 2023. There was 1 interview round.

Round 1 - Technical 

(2 Questions)

  • Q1. EHS Defination with explanation
  • Ans. 

    EHS stands for Environment, Health, and Safety. It refers to the laws, rules, standards, and programs that are designed to protect the health and safety of employees and the public as well as the environment.

    • EHS involves identifying and assessing risks in the workplace related to health, safety, and the environment.

    • It includes implementing measures to control and mitigate these risks, such as providing proper training,...

  • Answered by AI
  • Q2. BOCW Act with Factory Act

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Apco Infratech Interview FAQs

How many rounds are there in Apco Infratech Assistant Manager Information Technology interview?
Apco Infratech interview process usually has 2 rounds. The most common rounds in the Apco Infratech interview process are Technical and HR.
What are the top questions asked in Apco Infratech Assistant Manager Information Technology interview?

Some of the top questions asked at the Apco Infratech Assistant Manager Information Technology interview -

  1. What is routers and their typ...read more
  2. What is switch and their typ...read more
  3. What is osi layers and their functi...read more

Tell us how to improve this page.

Apco Infratech Assistant Manager Information Technology Interview Process

based on 1 interview

Interview experience

5
  
Excellent
View more

Interview Questions from Similar Companies

AECOM Interview Questions
4.2
 • 117 Interviews
Bechtel Interview Questions
3.9
 • 68 Interviews
Samsung E&A Interview Questions
4.0
 • 61 Interviews
Wood Group Interview Questions
3.8
 • 59 Interviews
Psp Projects Interview Questions
3.9
 • 51 Interviews
View all
Assistant Manager
141 salaries
unlock blur

₹5.2 L/yr - ₹15.5 L/yr

Senior Engineer
135 salaries
unlock blur

₹4.2 L/yr - ₹11.4 L/yr

Site Engineer
96 salaries
unlock blur

₹3 L/yr - ₹7 L/yr

Deputy Manager
82 salaries
unlock blur

₹7 L/yr - ₹18 L/yr

Store Officer
76 salaries
unlock blur

₹2.2 L/yr - ₹5.8 L/yr

Explore more salaries
Compare Apco Infratech with

AECOM

4.2
Compare

L&T Energy Hydrocarbon

3.8
Compare

Saipem

4.2
Compare

Aarvee Associates

3.9
Compare
Did you find this page helpful?
Yes No
write
Share an Interview