Site Engineer Interview Questions & Answers

user image Aditya Singh

posted on 18 Feb 2024

Interview experience
5
Excellent
Difficulty level
Moderate
Process Duration
Less than 2 weeks
Result
Selected Selected

I applied via Naukri.com and was interviewed in Aug 2023. There were 2 interview rounds.

Round 1 - HR 

(3 Questions)

  • Q1. Tell me about your self.
  • Q2. Your last company project.
  • Q3. Reason of leaving.
Round 2 - Technical 

(2 Questions)

  • Q1. Unit weight of materials.
  • Ans. 

    Unit weight of materials refers to the weight of a material per unit volume.

    • Unit weight is typically measured in pounds per cubic foot or kilograms per cubic meter.

    • It is an important factor in construction for determining the weight of materials used in a project.

    • For example, the unit weight of concrete is around 150 pounds per cubic foot.

    • Different materials have different unit weights based on their composition and de

  • Answered by AI
  • Q2. How can we handle on-Site technical problem.
  • Ans. 

    On-site technical problems can be handled by identifying the root cause, collaborating with team members, seeking expert advice, and implementing effective solutions.

    • Identify the root cause of the technical problem by conducting thorough analysis and investigation.

    • Collaborate with team members to brainstorm possible solutions and gather different perspectives.

    • Seek expert advice from senior engineers or specialists in t...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Increase your basic knowledge in Civil.

Site Engineer Interview Questions asked at other Companies

Q1. 1.BBS calculation of slab? 2.Stairs case riser and tread dimension? 3.Types of cement? 4.Full form of tmt, pcc, rcc, tmx, dpc 5.Definition of plinth area, courtyard area, built-up area? 6.function of dpc 8.standard size of brick? 9. Write g... read more
View answer (4)

Jobs at Anzen Projects

View all

Interview questions from similar companies

I applied via Naukri.com and was interviewed in Apr 2021. There were 4 interview rounds.

Interview Questionnaire 

1 Question

  • Q1. Interviewer asked me about last activity process , material quality, more technical questions, and cost analysis of last projects.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majority a stress test.it lasted about 1hr 45 minutes.i tried to answer every question with example.

Interview Questionnaire 

3 Questions

  • Q1. How many time u take any update shuttering system?
  • Ans. 

    The question is unclear and lacks context.

    • Please provide more information about the 'update shuttering system'.

    • Specify the time frame for the updates.

    • Clarify the purpose or objective of the updates.

    • Provide any relevant examples or scenarios.

  • Answered by AI
  • Q2. Why u want to work as a execution engineer? Why not any special team such as formwork team,or quality team?
  • Ans. 

    I want to work as an execution engineer because I enjoy the challenge of overseeing and coordinating all aspects of a project.

    • As an execution engineer, I would have the opportunity to work on a variety of projects and oversee all aspects of their execution.

    • I enjoy the challenge of coordinating different teams and ensuring that everything runs smoothly.

    • While working on a formwork or quality team would be valuable experi...

  • Answered by AI
  • Q3. As contractor farm Engineer in RCC which is most important? 1) Reinforcements 2)Formwork 3)Concrete And why?
  • Ans. 

    Concrete is the most important as it provides the strength and durability to the structure.

    • Concrete is the backbone of any RCC structure.

    • It provides the strength and durability to the structure.

    • Reinforcements and formwork are important too, but without concrete, they are useless.

    • Proper mix design and curing of concrete are crucial for the longevity of the structure.

  • Answered by AI

I applied via Company Website and was interviewed in Mar 2021. There was 1 interview round.

Interview Questionnaire 

1 Question

  • Q1. All question based on past work experiences.

Interview Preparation Tips

Interview preparation tips for other job seekers - Prepare all the past experience challenge and step by step your envolvement.

I applied via Naukri.com and was interviewed before Sep 2020. There was 1 interview round.

Interview Questionnaire 

3 Questions

  • Q1. About pipeline
  • Q2. Hydrotest procedure
  • Ans. 

    Hydrotest procedure is a process of testing the strength and integrity of a pressure vessel or pipeline by filling it with water and pressurizing it.

    • The vessel or pipeline is filled with water and pressurized to a specified level

    • The pressure is held for a specified amount of time to check for leaks or deformations

    • The test is usually performed before commissioning or after repairs

    • The test pressure and duration are deter...

  • Answered by AI
  • Q3. HDD procedure
  • Ans. 

    HDD procedure refers to the process of installing and configuring a hard disk drive in a computer system.

    • Ensure the HDD is compatible with the computer system

    • Physically install the HDD in the appropriate bay

    • Connect the necessary cables to the HDD and motherboard

    • Configure the HDD in the BIOS settings

    • Format the HDD and install the operating system

    • Test the HDD for proper functionality

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - Basic of pipeline and brief knowledge required.

Skills evaluated in this interview

Interview Questionnaire 

1 Question

  • Q1. Technical question

I applied via Job Portal and was interviewed in Oct 2020. There was 1 interview round.

Interview Preparation Tips

Interview preparation tips for other job seekers - This interview was a technical one but was majorly a stress test. It lasted for about 1 hour 10 minutes. The interviewer wanted to test both my knowledge and communication skills. Most of the questions asked to me were related to my B.Tech curriculum i.e. Civil Engineer site experience related topics. He stressed a lot on the basics related to my project topic. Luckily I was able to answer most of the questions correctly. I tried to answer each question with examples and also used props on the table (like pens, paperweights, pen stands etc.) to explain my theories. It was my first offcampus interview, and I think I did pretty well for a fresher. You need to stay calm and should apply presence of mind. Please go through the job description thoroughly word-by-word and recheck your resume to ensure that you are a best-fit for the position.

I applied via Company Website and was interviewed before Apr 2020. There were 4 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. Load distribution under rigid and flexible footings,water tank design, steel foundation design
  • Q2. Mix design of concrete, btech project
  • Ans. 

    Mix design of concrete and BTech project

    • Mix design involves determining the proportions of cement, water, aggregates, and admixtures to achieve desired properties of concrete

    • Factors like strength, workability, durability, and cost are considered while designing the mix

    • BTech project can involve studying the effect of different mix designs on properties of concrete or developing a new mix design

    • Examples of BTech projects...

  • Answered by AI

Interview Preparation Tips

Interview preparation tips for other job seekers - be well prepared with basics and if you are already experienced, be prepared with site knowledge

I applied via Walk-in and was interviewed in Dec 2020. There were 3 interview rounds.

Interview Questionnaire 

2 Questions

  • Q1. About my work experience & my self
  • Q2. Tell me about your self.

Interview Preparation Tips

Interview preparation tips for other job seekers - Always candidates have good knowledge of relevant work.and be confident about it,interviewrs always seeing your confidence level and skills.

Interview Questionnaire 

3 Questions

  • Q1. PSC girder
  • Q2. Minor bridge
  • Q3. Related

Interview Preparation Tips

Interview preparation tips for other job seekers - Good

Anzen Projects Interview FAQs

How many rounds are there in Anzen Projects interview?
Anzen Projects interview process usually has 2 rounds. The most common rounds in the Anzen Projects interview process are HR and Technical.
How to prepare for Anzen Projects interview?
Go through your CV in detail and study all the technologies mentioned in your CV. Prepare at least two technologies or languages in depth if you are appearing for a technical interview at Anzen Projects. The most common topics and skills that interviewers at Anzen Projects expect are Project Management, Project Engineering, Site Engineering, Administration Work and Construction Engineering.
What are the top questions asked in Anzen Projects interview?

Some of the top questions asked at the Anzen Projects interview -

  1. How can we handle on-Site technical probl...read more
  2. Unit weight of materia...read more

Tell us how to improve this page.

Anzen Projects Interview Process

based on 3 interviews

Interview experience

4.3
  
Good
View more

Interview Questions from Similar Companies

L&T Construction Interview Questions
4.0
 • 745 Interviews
Tata Projects Interview Questions
4.2
 • 428 Interviews
GMR Group Interview Questions
4.0
 • 80 Interviews
GAMMON INDIA Interview Questions
3.8
 • 29 Interviews
Essar Group Interview Questions
3.7
 • 28 Interviews
Punj Lloyd Interview Questions
4.3
 • 18 Interviews
View all

Anzen Projects Reviews and Ratings

based on 14 reviews

3.7/5

Rating in categories

3.6

Skill development

3.2

Work-life balance

3.6

Salary

3.8

Job security

3.9

Company culture

3.4

Promotions

3.2

Work satisfaction

Explore 14 Reviews and Ratings
Accounts Officer

Dubai,

United arab emirates

2-6 Yrs

₹ 5-11 LPA

Explore more jobs
Project Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Site Engineer
6 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrical Project Engineer
4 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Electrical Engineer
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Purchase Executive
3 salaries
unlock blur

₹0 L/yr - ₹0 L/yr

Explore more salaries
Compare Anzen Projects with

L&T Construction

4.0
Compare

Tata Projects

4.2
Compare

Shapoorji Pallonji Group

4.1
Compare

Hindustan Construction Company

4.2
Compare
Did you find this page helpful?
Yes No
write
Share an Interview