Filter interviews by
I applied via Referral and was interviewed before Jan 2020. There were 3 interview rounds.
Top trending discussions
I applied via Referral and was interviewed before Dec 2022. There were 3 interview rounds.
The joining period and percentage of salary hike are important factors to consider when accepting a new job offer.
The joining period should be negotiated based on the candidate's current commitments and the urgency of the role.
The percentage of salary hike should be competitive with industry standards and reflective of the candidate's experience and skills.
It is important to consider the overall compensation package, i...
I appeared for an interview before Aug 2022.
Project life cycle is the series of phases a project goes through from initiation to closure.
Initiation: Define project scope, objectives, and feasibility.
Planning: Develop project plan, schedule, and budget.
Execution: Implement project plan and deliverables.
Monitoring and Controlling: Track progress, manage changes, and ensure quality.
Closure: Finalize project, hand off deliverables, and evaluate success.
Achieving good quality work involves thorough planning, effective communication, attention to detail, continuous monitoring, and feedback.
Thoroughly plan the project scope, timeline, and resources.
Communicate clearly with team members and stakeholders to ensure everyone is on the same page.
Pay attention to detail in every aspect of the project to avoid errors and rework.
Continuously monitor progress and quality through...
I applied via Referral and was interviewed in Aug 2023. There were 2 interview rounds.
posted on 23 Oct 2024
I applied via Naukri.com and was interviewed in Apr 2024. There was 1 interview round.
Project flow chart outlines the steps from project initiation to completion and handover.
Initiation: Define project scope, objectives, and stakeholders.
Planning: Create a detailed project plan, including timelines, resources, and budget.
Execution: Implement the project plan, monitor progress, and manage any issues.
Monitoring and Controlling: Track project performance, make adjustments as needed.
Closing: Finalize all pr...
I rate my knowledge on MEP as advanced.
I have extensive experience managing MEP projects in various industries.
I am familiar with MEP systems and their integration within construction projects.
I have successfully coordinated with MEP subcontractors to ensure project success.
I applied via Referral and was interviewed before Jul 2023. There was 1 interview round.
A preaction system is a type of fire protection system that combines the features of a dry pipe system and a deluge system.
Preaction systems are commonly used in areas where accidental activation of the sprinkler system could cause water damage, such as data centers or museums.
These systems require two separate events to occur before water is released - detection of a fire and activation of the sprinkler heads.
Preactio...
I applied via Naukri.com and was interviewed in May 2022. There was 1 interview round.
I applied via Referral and was interviewed before Feb 2022. There were 3 interview rounds.
Technical specifications for concrete activities involve details about the materials, processes, and equipment used.
Technical specifications outline the requirements for each activity
They include details about the materials, processes, and equipment used
They ensure that the project is completed to the required standards
Examples include the strength and composition of the concrete mix, curing time, and equipment used fo...
I have 10 years of project management experience in various industries.
Managed multiple projects simultaneously
Led cross-functional teams to successful project completion
Developed and implemented project plans, schedules, and budgets
Monitored project progress and ensured adherence to timelines and deliverables
Identified and mitigated project risks
Implemented project management best practices
Ensured effective communicat...
I applied via Naukri.com and was interviewed in Dec 2018. There were 3 interview rounds.
I have 5 years of experience in retail management, overseeing daily operations and leading a team of 15 employees.
Managed daily operations of a retail store
Led a team of 15 employees, providing training and guidance
Implemented strategies to increase sales and improve customer satisfaction
Handled inventory management and merchandising
Responsible for scheduling and performance evaluations
I am drawn to the company's commitment to employee development and growth opportunities.
I appreciate the company's focus on continuous learning and development
I value the opportunities for advancement within the organization
I admire the company culture and values that align with my own
I have had positive experiences with the company's products/services
I managed a project to implement a new customer relationship management system.
Led a team of 10 employees to successfully implement the CRM system
Created project timelines and milestones to ensure timely completion
Collaborated with IT department to customize the system to meet company's needs
My final year project was a research study on the impact of social media on consumer behavior.
Researched various social media platforms and their influence on consumer decision-making
Conducted surveys and interviews to gather data on consumer preferences and behaviors
Analyzed the data using statistical tools and presented findings in a comprehensive report
Suggested recommendations for businesses to leverage social medi
The cable size required for a 10 hp motor depends on the voltage and current rating of the motor.
The cable size should be selected based on the motor's full load current (FLC) and the voltage rating.
For a 10 hp motor, the FLC would typically be around 15-20 Amps.
A common cable size for a 10 hp motor operating at 415V could be 4 sq mm cable.
I have a strong understanding of electrical systems and am capable of troubleshooting and problem-solving in this area.
I have a degree in Electrical Engineering
I have completed multiple projects involving electrical systems
I have experience working with electrical equipment and tools
I have a good understanding of electrical codes and regulations
based on 8 reviews
Rating in categories
Project Manager
17
salaries
| ₹4.3 L/yr - ₹11 L/yr |
Project Coordinator
15
salaries
| ₹3.2 L/yr - ₹7.3 L/yr |
Safety Officer
11
salaries
| ₹2 L/yr - ₹4.6 L/yr |
Assistant Project Manager
9
salaries
| ₹4.2 L/yr - ₹6.5 L/yr |
Project Manager MEP
7
salaries
| ₹6.5 L/yr - ₹10.4 L/yr |
JLL
CBRE
NoBroker
Sobha