Filter interviews by
I applied via AmbitionBox and was interviewed in Apr 2022. There were 3 interview rounds.
Java,selenium,oop in java,testing,automation and manual testing, SDLC, html
Java is a popular programming language used for developing a wide range of applications.
Java is an object-oriented language.
It is platform-independent, meaning it can run on any operating system.
Java is used for developing web applications, mobile apps, desktop software, and more.
It has a large standard library and supports multithreading.
Java is widely used in enterprise-level applications and is the language of choic
OOP is a programming paradigm that organizes code into objects with properties and behaviors.
OOP focuses on creating reusable code through the use of classes and objects.
It emphasizes encapsulation, inheritance, and polymorphism.
Example: In Java, a class represents a blueprint for creating objects with defined attributes and methods.
Top trending discussions
I applied via Approached by Company and was interviewed in Sep 2023. There were 2 interview rounds.
Technical question paper
Hypothetical Project will given to find the project estimate and schedule
posted on 7 Aug 2024
I applied via Job Fair and was interviewed in Feb 2024. There was 1 interview round.
I am a highly organized and detail-oriented individual with a strong background in project management.
I have a Bachelor's degree in Business Administration with a focus on project management
I have successfully coordinated multiple projects from initiation to completion
I excel at creating and maintaining project schedules, budgets, and resources
I have excellent communication and interpersonal skills, allowing me to work
Concrete pouring method involves the process of placing and compacting concrete into a formwork to create a solid structure.
Ensure formwork is properly prepared and secured before pouring concrete
Use appropriate equipment such as concrete pumps or buckets for pouring
Monitor concrete flow and consistency to avoid segregation or honeycombing
Properly compact the concrete to remove air voids and ensure strength
Allow suffic...
Shuttering of columns is the process of creating temporary formwork to support concrete until it sets.
Shuttering is usually made of plywood, timber, or steel.
It is important to ensure the shuttering is properly supported and aligned before pouring concrete.
The shuttering should be removed after the concrete has set to the required strength.
Properly designed and constructed shuttering helps in achieving a smooth and uni
Tiles can be placed using various methods such as grid layout, random pattern, or specific design layout.
Tiles can be placed in a grid layout for a uniform and organized look.
Random pattern placement can create a more eclectic and unique design.
Specific design layout involves placing tiles according to a pre-determined pattern or design.
Consider factors like tile size, shape, color, and grout spacing when deciding on t
The flooring method for stone work typically involves using mortar or adhesive to secure the stones in place.
Prepare the subfloor by ensuring it is clean, level, and dry
Apply mortar or adhesive to the back of each stone before placing it on the subfloor
Use spacers to maintain consistent spacing between stones
Allow the mortar or adhesive to dry completely before grouting the joints
Seal the finished stone floor to protec
I applied via Approached by Company and was interviewed in Sep 2023. There were 2 interview rounds.
Technical question paper
Hypothetical Project will given to find the project estimate and schedule
I applied via Job Portal and was interviewed in Jan 2023. There were 3 interview rounds.
Box type waterproofing involves creating a sealed enclosure to prevent water damage.
Start by preparing the surface to be waterproofed
Apply a waterproofing membrane to the surface
Seal all joints and corners to ensure complete waterproofing
Test the waterproofing by filling the box with water and checking for leaks
Asked about the methodology for wp work
Assistant Manager
13
salaries
| ₹4.4 L/yr - ₹6.2 L/yr |
Executive Accountant
8
salaries
| ₹1.8 L/yr - ₹2.8 L/yr |
Assistant Sales Manager
7
salaries
| ₹4 L/yr - ₹4.5 L/yr |
Project Engineer
7
salaries
| ₹4 L/yr - ₹4.8 L/yr |
Civil Site Engineer
7
salaries
| ₹2.2 L/yr - ₹3.6 L/yr |
Prestige Group
Sobha
DLF
Godrej Properties