Filter interviews by
I applied via Company Website and was interviewed in Jan 2021. There were 2 interview rounds.
Top trending discussions
posted on 3 Jun 2022
Condition given to resolve a problem. If i have sell my pen, what will be my focus on, promote n prove what best about my product.
No, hitting a file on a robotic machine while operating it is not recommended.
Hitting a file on a robotic machine can damage the machine and the file.
It can also cause safety hazards for the operator and others nearby.
It is important to follow proper operating procedures and safety guidelines when using robotic machines.
The bonnet has a ding dang that can be buffed out.
Yes, there is a ding dang on the bonnet that can be buffed out.
Buffing may help to remove the ding dang and restore the surface.
It is important to assess the severity of the ding dang before attempting to buff it out.
posted on 15 Dec 2024
I applied via Walk-in and was interviewed in Nov 2024. There was 1 interview round.
PPAP stands for Production Part Approval Process, a standardized process in the automotive industry to ensure suppliers meet quality standards.
PPAP is a set of documents and procedures used to ensure that a supplier's parts meet the customer's requirements.
It includes documentation such as control plans, process flow diagrams, and inspection records.
PPAP is typically required by automotive manufacturers before a new pa...
posted on 3 Sep 2024
I have a strong background in quality engineering, proven track record of improving processes, and a passion for continuous improvement.
I have a Bachelor's degree in Engineering with a focus on quality control
I have successfully implemented lean manufacturing principles in my previous role, resulting in a 20% increase in efficiency
I am certified in Six Sigma and have led multiple projects that resulted in cost savings
ECN process stands for Engineering Change Notice process, which is used to document and track changes made to a product or process.
ECN process is used to document and track changes made to a product or process.
It involves creating a formal notice detailing the proposed change, including the reason for the change and its potential impact.
The notice is then reviewed and approved by relevant stakeholders before implementa...
BOM for harness refers to the Bill of Materials for the components used in the harness assembly.
BOM for harness includes a list of all components required for the harness assembly
It specifies the quantity of each component needed
BOM helps in ensuring all necessary parts are included in the assembly
Examples of components in a harness BOM: wires, connectors, terminals, protective sleeves
Give correct answer of questions
I am a detail-oriented Quality Inspector with 5 years of experience in ensuring products meet quality standards through inspections and audits.
Experienced Quality Inspector with 5 years in the industry
Skilled in conducting inspections and audits to ensure quality standards are met
Detail-oriented and focused on identifying defects and non-conformities
Strong communication skills to work with production teams and supplier...
I was interviewed before Jan 2024.
Post reality experience and knowledge ke bare mein Kuchh
Apne bare mein knowledge and personal
posted on 27 Jan 2025
based on 3 reviews
Rating in categories
Assistant Engineer
390
salaries
| ₹2 L/yr - ₹4.8 L/yr |
Deputy Engineer
108
salaries
| ₹3.2 L/yr - ₹6.7 L/yr |
Assistant Manager
85
salaries
| ₹5.5 L/yr - ₹15 L/yr |
Engineer
70
salaries
| ₹3 L/yr - ₹6.9 L/yr |
Service Engineer
68
salaries
| ₹2.4 L/yr - ₹5.8 L/yr |
Exide Industries
Tata Power
BHEL
Hindustan Unilever